Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hampton Bays, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 505ft / 154mTotal length
  • $133,437,000Total costs
  • 331,125Total average daily traffic
  • 15,369Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hampton Bays
  • No street view available for this location

New bridges in Hampton Bays, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 21930-1939
  • 21950-1959
  • 81960-1969
  • 91970-1979
  • 11980-1989
Average Bridge Daily Traffic in Hampton Bays, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 50.0%Good
  • 41.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 41.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 33.3%Good
  • 50.0%Satisfactory
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1019411,  Location: 1 MI E EXIT 65 OF S.H.27 (Lat: 40.885378,  Lng: -72.524914),  Route carried "on" structure: State highway 27,  Year Built: 1963,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 18,389 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,873 (year 2040),  Design Load: HS 20,  Features Intersected: SQUIRETOWN RD NB, SQUIRE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.498,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,638,000,  Roadway Improvement Cost: $2,130,000,  Total Project Cost: $5,768,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1019412,  Location: 1 MI E EXIT 60 OF SH 27 (Lat: 40.885017,  Lng: -72.525064),  Route carried "on" structure: State highway 27,  Year Built: 1963,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 18,389 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,873 (year 2040),  Design Load: HS 20,  Features Intersected: SQUIRETOWN RD NB, SQUIRE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.498,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,526,000,  Roadway Improvement Cost: $2,065,000,  Total Project Cost: $5,591,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1019429,  Location: 1.8 MI E SH 24 & SH 27 (Lat: 40.889656,  Lng: -72.504178),  Route carried "on" structure: State highway 27,  Year Built: 1963,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 36,778 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 43,747 (year 2040),  Design Load: HS 20,  Features Intersected: NEWTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.349,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 24.9m (81.7ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,141,000,  Roadway Improvement Cost: $2,425,000,  Total Project Cost: $6,567,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1019439,  Location: 2 MI E JCT SH 24 & SH 27 (Lat: 40.890033,  Lng: -72.500978),  Route carried "on" structure: State highway 27,  Year Built: 1960,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 36,778 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 43,747 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CANAL ROAD EAST, SHINNEC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.542,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.0m (23.0ft), Horizontal Clearance: 45.1m (148.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.9m (163.7ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.24m (36.88ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $11,404,000,  Roadway Improvement Cost: $6,678,000,  Total Project Cost: $18,083,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1019449,  Location: SH 27 - 3.3MI W OF TUCKAH (Lat: 40.890392,  Lng: -72.498128),  Route carried "on" structure: State highway 27,  Year Built: 1959,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 36,778 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 43,747 (year 2040),  Design Load: HS 20,  Features Intersected: CR 39 - NORTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.847,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 24.9m (81.7ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.37m (20.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,432,000,  Roadway Improvement Cost: $4,352,000,  Total Project Cost: $11,784,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1056381,  Location: .7 MI W JCT SH 24 & SH 27 (Lat: 40.876486,  Lng: -72.550636),  Route carried "on" structure: State highway 27,  Year Built: 1973,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 16,312 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,403 (year 2040),  Design Load: HS 20,  Features Intersected: BELLOWS POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.133,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,776,000,  Roadway Improvement Cost: $1,626,000,  Total Project Cost: $4,401,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056382,  Location: .7 MI W JCT SH 24 & SH 27 (Lat: 40.876200,  Lng: -72.550500),  Route carried "on" structure: State highway 27,  Year Built: 1973,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 16,312 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,403 (year 2040),  Design Load: HS 20,  Features Intersected: BELLOWS POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.133,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,776,000,  Roadway Improvement Cost: $1,626,000,  Total Project Cost: $4,401,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056391,  Location: RTE 24+RTE 27 (Lat: 40.879856,  Lng: -72.536819),  Route carried "on" structure: State highway 27,  Year Built: 1973,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 18,389 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,873 (year 2040),  Design Load: HS 20,  Features Intersected: 24 24 07042076, RTE 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.356,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,064,000,  Roadway Improvement Cost: $2,380,000,  Total Project Cost: $6,444,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056392,  Location: RTE 24+RTE 27 (Lat: 40.879564,  Lng: -72.536708),  Route carried "on" structure: State highway 27,  Year Built: 1973,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 18,389 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,873 (year 2040),  Design Load: HS 20,  Features Intersected: 24 24 07042076, RTE 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.324,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,028,000,  Roadway Improvement Cost: $2,359,000,  Total Project Cost: $6,387,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 301956,  Location: .1 MI E JCT RT 24&MTK HWY (Lat: 40.881406,  Lng: -72.512258),  Route carried "on" structure: Other road ,  Year Built: 1934,  Status: Posted for load-capacity,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 13,629 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,556 (year 2040),  Design Load: H 20,  Features Intersected: LIRR-MONTAUK BRCH,  Facility Carried by Structure: MONTAUK HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.833,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 27.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $6,123,000,  Roadway Improvement Cost: $3,585,000,  Total Project Cost: $9,708,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 301957,  Location: .7 MI E JCT RT 24&MTK HWY (Lat: 40.884978,  Lng: -72.500783),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 20,175 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 24,508 (year 2040),  Features Intersected: SHINNECOCK CANAL,  Facility Carried by Structure: MONTAUK HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.863,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.6m (24.9ft), Horizontal Clearance: 34.4m (112.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.6m (139.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 10.18m (33.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $8,186,000,  Roadway Improvement Cost: $4,794,000,  Total Project Cost: $12,979,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330052,  Location: SOUTH OF PONQUOGUE-BEACH (Lat: 40.841353,  Lng: -72.499300),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Posted for load-capacity,  Structure Length: 85.07m (279.10ft),  Average Daily Traffic: 5,151 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,257 (year 2040),  Design Load: HS 20,  Features Intersected: SHINNECOCK BAY,  Facility Carried by Structure: PONQUOGUE AV-CR32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 16.7m (54.8ft), Horizontal Clearance: 30.4m (99.7ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 85.06m (279.07ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $26,062,000,  Roadway Improvement Cost: $15,262,000,  Total Project Cost: $41,324,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1019411,  Location: 1 MI E EXIT 65 OF S.H.27 (Lat: 40.885378,  Lng: -72.524914),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 11,949 (year 2003),  Features Intersected: SQUIRETOWN RD NB, SQUIRE,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 1019412,  Location: 1 MI E EXIT 60 OF SH 27 (Lat: 40.885017,  Lng: -72.525064),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 11,989 (year 2003),  Features Intersected: SQUIRETOWN RD NB, SQUIRE,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 1019429,  Location: 1.8 MI E SH 24 & SH 27 (Lat: 40.889656,  Lng: -72.504178),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,100 (year 1972),  Features Intersected: NEWTOWN ROAD,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: 1019439,  Location: 2 MI E JCT SH 24 & SH 27 (Lat: 40.890033,  Lng: -72.500978),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: CANAL ROAD EAST, SHINNEC,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 6.88m (22.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.9m (163.7ft)

Find on map >>   Show street view

Structure Number: 1019449,  Location: SH 27 - 3.3MI W OF TUCKAH (Lat: 40.890392,  Lng: -72.498128),  Route carried "under" structure: County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 10,618 (year 2005),  Features Intersected: CR 39 - NORTH RD,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.5m (96.8ft)

Find on map >>   Show street view

Structure Number: 1056381,  Location: .7 MI W JCT SH 24 & SH 27 (Lat: 40.876486,  Lng: -72.550636),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: BELLOWS POND ROAD,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 1056382,  Location: .7 MI W JCT SH 24 & SH 27 (Lat: 40.876200,  Lng: -72.550500),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: BELLOWS POND ROAD,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 1056391,  Location: RTE 24+RTE 27 (Lat: 40.879856,  Lng: -72.536819),  Route carried "under" structure: State highway 24,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,650 (year 1973),  Features Intersected: 24 24 07042076, RTE 24,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 12.051,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.3m (138.8ft)

Find on map >>   Show street view

Structure Number: 1056392,  Location: RTE 24+RTE 27 (Lat: 40.879564,  Lng: -72.536708),  Route carried "under" structure: State highway 24,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,650 (year 1973),  Features Intersected: 24 24 07042076, RTE 24,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 12.051,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.3m (138.8ft)

Find on map >>   Show street view

Structure Number: 705646,  Location: 24.4 MI NE RTS 112+27A (Lat: 40.869572,  Lng: -72.545200),  Route carried "under" structure: Other road ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 1980),  Features Intersected: MONTAUK HWY=CR 80,  Facility Carried by Structure: LIRR WEST TIANA
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 771016,  Location: 1.2 MI E OF HAMPTON BAYS (Lat: 40.887250,  Lng: -72.501533),  Route carried "under" structure: County highway ,  Year Built: 1917,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2021),  Features Intersected: PECONIC AVE,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.8m (28.9ft)

Find on map >>   Show street view

Structure Number: 771018,  Location: 1.4 MI E OF HAMPTON BAYS (Lat: 40.888131,  Lng: -72.500014),  Route carried "under" structure: County highway ,  Year Built: 1907,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 1978),  Features Intersected: NORTH HIGHWAY,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 3.88m (12.73ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.2m (49.9ft)

Discuss Hampton Bays, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.