Bridge Statistics for Hampton Falls, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Hampton Falls, NH, New Hampshire, New Hampshire forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 33 meters (108ft) Total costs: $12,000,000 Total average daily traffic: 279,011 Total average daily truck traffic: 24,207 National Bridge Inventory (NBI) Registered Bridges for Hampton Falls
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 110008000118, Route carried "on" structure: Other road , Year Built: 2007, Status: Open, Structure Length: 0.35m (1.15ft), Average Daily Traffic: 111 (year 2004), Truck Traffic: 4%, Average Future Daily Traffic: 164 (year 2026), Features Intersected: TAYLOR RIVER, Facility Carried by Structure: SANBORN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.400, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.1m (10.2ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Operating Rating: 67.5 metric tons, Inventory Rating: 40.5 metric tons, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.35m (1.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 110009400142, Location: 1.19 MI. SE EXETER TL (Lat: 42.949897, Lng: -70.900403), Route carried "on" structure: State highway 88, Year Built: 1923, Year Reconstructed: 1981, Status: Open, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 4,000 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 5,920 (year 2027), Design Load: H 15, Features Intersected: TAYLOR RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.134, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.9m (16.1ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 10.8m (35.4ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 34.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.64m (2.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 110016200044, Location: 1.31 MI. NW US 1 (Lat: 42.909558, Lng: -70.882450), Route carried "on" structure: State highway 84, Year Built: 1961, Status: Open, Structure Length: 0.30m (0.98ft), Average Daily Traffic: 3,700 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 5,476 (year 2027), Design Load: H 20, Features Intersected: HAMPTON FALLS RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.959, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.0m (9.8ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Channel: Satisfactory, Culverts: Serious, Operating Rating: 28.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.30m (0.98ft), Designated Inspection Frequency: Every 12 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 11001740004, Location: .25 MI N. SEABROOK T.L. (Lat: 42.907031, Lng: -70.876692), Route carried "on" structure: State highway 84, Year Built: 1975, Status: Open, Structure Length: 7.77m (25.49ft), Average Daily Traffic: 3,700 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 5,476 (year 2026), Design Load: HS 20+Mod, Features Intersected: I-95 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.490, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 39.0m (128.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.77m (25.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 110017500055, Location: 0.6 MI N. SEABROOK T.L. (Lat: 42.911850, Lng: -70.874186), Route carried "on" structure: Interstate 95, Year Built: 1950, Year Reconstructed: 1974, Status: Open, Structure Length: 0.30m (0.98ft), Average Daily Traffic: 81,100 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 120,028 (year 2027), Design Load: HS 20+Mod, Features Intersected: HAMPTON FALLS RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.014, Lanes on structure: 8, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 22.3m (73.2ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.0m (9.8ft), Out-to-Out Width: 30.5m (100.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 89.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.30m (0.98ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: July 2008, Underwater Inspection Date: April 1997, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 110017700079, Location: .4 MI W. JCT RT 1 (Lat: 42.920400, Lng: -70.869708), Route carried "on" structure: State highway 88, Year Built: 1975, Status: Open, Structure Length: 7.86m (25.79ft), Average Daily Traffic: 3,700 (year 2004), Truck Traffic: 10%, Average Future Daily Traffic: 5,476 (year 2026), Design Load: HS 20+Mod, Features Intersected: I-95 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.708, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.3m (56.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.86m (25.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 110018700053, Location: 0.42 MI. SW US 1 (Lat: 42.909819, Lng: -70.868864), Route carried "on" structure: State highway 84, Year Built: 1900, Year Reconstructed: 1953, Status: Open, Structure Length: 0.40m (1.31ft), Average Daily Traffic: 3,700 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 5,476 (year 2027), Design Load: H 15, Features Intersected: HAMPTON FALLS RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.263, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.4m (11.2ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.2m (23.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 13.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 8.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.40m (1.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 110019400059, Location: .4 MI N. SEABROOK T.L. (Lat: 42.910653, Lng: -70.864900), Route carried "on" structure: US 1, Year Built: 1930, Status: Open, Structure Length: 0.46m (1.51ft), Average Daily Traffic: 21,000 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 31,080 (year 2027), Design Load: H 15, Features Intersected: HAMPTON FALLS RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.869, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.4m (11.2ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 16.9m (55.4ft), Out-to-Out Width: 18.0m (59.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.46m (1.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 11001740004, Location: .25 MI N. SEABROOK T.L. (Lat: 42.907031, Lng: -70.876692), Route carried "under" structure: Interstate 95, Year Built: 1975, Structure Length: 7.77m (25.49ft), Average Daily Traffic: 79,000 (year 2003), Truck Traffic: 9%, Features Intersected: I-95, Facility Carried by Structure: NH 84 Minimum Vertical Clearance: 0.54m (1.77ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft) Find on map >>
Structure Number: 110017700079, Location: .4 MI W. JCT RT 1 (Lat: 42.920400, Lng: -70.869708), Route carried "under" structure: Interstate 95, Year Built: 1975, Structure Length: 7.86m (25.79ft), Average Daily Traffic: 79,000 (year 2003), Truck Traffic: 9%, Features Intersected: I-95, Facility Carried by Structure: NH 88 Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.6m (129.9ft) Discuss this city on our hugely popular New Hampshire forum Back to: Hampton Falls, NH, New Hampshire, All US cities.
|
![]() |