National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 21 meters (69ft)
Total costs: $7,350,000
Total average daily traffic: 20,459
Total average daily truck traffic: 1,543
Total future (year 2027) average daily traffic: 32,312
National Bridge Inventory (NBI) Registered Bridges for Hardwick

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 0
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 2
  • 1940-1949: 4
  • 1950-1959: 3
  • 1960-1969: 0
  • 1970-1979: 1

Reconstructed bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: H080016LFMUNNBI,  Location: NEW BRAINTREE T. L. (Lat: 42.315833,  Lng: -72.181294),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 467 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 738 (year 2029),  Design Load: H 20,  Features Intersected: WATER WARE RIVER,  Facility Carried by Structure: HWY RED BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $653,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H0800216JMUNNBI,  Location: 250 FT SO. OF BARRE ROAD (Lat: 42.343250,  Lng: -72.160311),  Route carried "on" structure: State highway 32,  Year Built: 1959,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 5,797 (year 2003),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,155 (year 2028),  Design Load: H 20,  Features Intersected: WATER MOOSE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.216,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $248,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H0800318JMUNNBI,  Location: SE OF RT32@NEW BRTREE BDR (Lat: 42.315786,  Lng: -72.181294),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1961,  Status: Posted for load,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 158 (year 2027),  Design Load: H 15,  Features Intersected: WATER WARE RIVER,  Facility Carried by Structure: HWY CREAMERY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Critical Feature Inspection Date: April 2008,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: H0800412QMHDNBI,  Location: 1.2 M N NEW BRAINTREE T/L (Lat: 42.311600,  Lng: -72.208569),  Route carried "on" structure: State highway 32,  Year Built: 1940,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 9,200 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,530 (year 2027),  Design Load: H 20,  Features Intersected: WATER WARE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.911,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Critical Feature Inspection Date: September 2006,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,172,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H0800518KMUNNBI,  Location: 1.5M NW OF RT32 NR BARRE (Lat: 42.376608,  Lng: -72.161744),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 1938,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 258 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 407 (year 2028),  Features Intersected: WATER MOOSE BROOK,  Facility Carried by Structure: HWY TAYLOR HL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $766,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H080091A3MHDNBI,  Location: .2 M NW JCT. ST. 32 (Lat: 42.345500,  Lng: -72.160672),  Route carried "on" structure: City street 32A,  Year Built: 1947,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,810 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,859 (year 2028),  Design Load: H 20,  Features Intersected: WATER MOOSE BROOK,  Facility Carried by Structure: HWY BARRE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $409,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H0801218LMUNNBI,  Location: W OF RT32 IN GILBERTVILLE (Lat: 42.309986,  Lng: -72.212381),  Route carried "on" structure: City street ,  Year Built: 1887,  Year Reconstructed: 1987,  Status: Closed,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 259 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 409 (year 2028),  Features Intersected: WATER WARE RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Critical,  Substructure: Satisfactory,  Channel: Good,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 6 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Critical Feature Inspection Date: June 2007,  Bridge Improvement Cost: $1,413,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $2,120,000 ( Estimate for 2006),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: H080191A4MHDNBI,  Location: 0.2 MI N OF CHURCH LN (Lat: 42.357961,  Lng: -72.142978),  Route carried "on" structure: State highway 32,  Year Built: 1946,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,163 (year 2001),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,837 (year 2028),  Design Load: HS 20,  Features Intersected: WATER BROADMEADOW BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.472,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Aluminum, Iron,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 98.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007
Find on map >>

Structure Number: H0802018MMUNNBI,  Location: 1. MI N OF WARE TOWN LINE (Lat: 42.316833,  Lng: -72.247167),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,034 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,633 (year 2027),  Design Load: H 15,  Features Intersected: WATER NEWTON BROOK,  Facility Carried by Structure: HWY W GRNWICH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 90.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $244,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H0802118NMUNNBI,  Location: W OF RT32 BY BARRE RD (Lat: 42.345167,  Lng: -72.160667),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 260 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 411 (year 2027),  Design Load: H 15,  Features Intersected: WATER MOOSE BROOK,  Facility Carried by Structure: HWY MORAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.9m (19.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 94.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $155,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H080234CNMDCNBI,  Location: 14 MI W OF ALT RTE 32 (Lat: 42.392714,  Lng: -72.239194),  Route carried "on" structure: State lands road ,  Year Built: 1940,  Status: Posted for load-capacity,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 111 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 175 (year 2028),  Features Intersected: WATER QUAB RS S BAF DAM,  Facility Carried by Structure: HWY ACCESS GT 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: April 2007,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $913,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete

Discuss this city on our hugely popular Massachusetts forum

Back to: Hardwick, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.