National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 11 meters (36ft)
Total costs: $4,506,000
Total average daily traffic: 5,148
Total average daily truck traffic: 425
Total future (year 2019) average daily traffic: 6,369
National Bridge Inventory (NBI) Registered Bridges for Harford

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 3
  • 1980-1989: 1

Reconstructed bridges - Historical Statistics

  • 1970-1979: 5
  • 1980-1989: 0
  • 1990-1999: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 104007,  Location: 0.1 MI E JCT RTS 38 + 200 (Lat: 42.410858,  Lng: -76.203681),  Route carried "on" structure: State highway 200,  Year Built: 1934,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 369 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 463 (year 2026),  Design Load: HS 20,  Features Intersected: E BR OWEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.191,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Critical Feature Inspection Date: August 2006,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $788,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 104008,  Location: 0.1 MI SE JCT RTS 200+221 (Lat: 42.423778,  Lng: -76.204228),  Route carried "on" structure: State highway 200,  Year Built: 1924,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 371 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 466 (year 2022),  Design Load: HS 20,  Features Intersected: E BR OWEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.072,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $788,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 104175,  Location: .2 MI NE JCT SH38 & SH221 (Lat: 42.428025,  Lng: -76.225197),  Route carried "on" structure: State highway 221,  Year Built: 1935,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,315 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,623 (year 2026),  Design Load: H 20,  Features Intersected: TRB E B OWEGO CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.640,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $406,000,  Total Project Cost: $1,012,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 104177,  Location: 1.3 MI NE JCT SH221 & SH2 (Lat: 42.438111,  Lng: -76.186758),  Route carried "on" structure: State highway 221,  Year Built: 1927,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 1,284 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,585 (year 2022),  Design Load: H 20,  Features Intersected: TRB E BR OWEGO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.550,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $357,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 106949,  Location: 1.2 MI E JCT SH221 & SH38 (Lat: 42.425928,  Lng: -76.208603),  Route carried "on" structure: State highway 221,  Year Built: 1938,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,315 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,623 (year 2026),  Design Load: H 20,  Features Intersected: TRB E BR OWEGO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.201,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 72.3 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $229,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 220735,  Location: 2.6 MI SE OF HARFORD (Lat: 42.415236,  Lng: -76.189925),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 21 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 26 (year 2019),  Features Intersected: GRIGGS GULF CREEK,  Facility Carried by Structure: GRIGGS GULF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Serious,  Operating Rating: 67.2 metric tons,  Inventory Rating: 28.9 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $456,000 ( Estimate for 2007)
Find on map >>

Structure Number: 220736,  Location: 2.9 MI SE OF HARFORD (Lat: 42.414528,  Lng: -76.187103),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 21 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 26 (year 2019),  Features Intersected: GRIGGS GULF CREEK,  Facility Carried by Structure: GRIGGS GULF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Poor,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $171,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 226704,  Location: 9.0 MI S CITY CORTLAND (Lat: 42.470158,  Lng: -76.172433),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 54 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 68 (year 2022),  Features Intersected: BABCOCK HOLLOW CK,  Facility Carried by Structure: BLECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $77,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 320734,  Location: 2.4 MI SE OF HARFORD (Lat: 42.414669,  Lng: -76.195333),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 270 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 339 (year 2020),  Features Intersected: GRIGGS GULF CREEK,  Facility Carried by Structure: MICHIGAN HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $145,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 320738,  Location: 3.2 MI NE OF HARFORD (Lat: 42.446172,  Lng: -76.185422),  Route carried "on" structure: City street ,  Year Built: 1976,  Year Reconstructed: 1984,  Status: Posted for load,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 22 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 28 (year 2020),  Features Intersected: BABCOCK HOLLOW CK,  Facility Carried by Structure: HILSINGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Critical Feature Inspection Date: May 2007,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $145,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 331194,  Location: 5.1 MI SE OF VIRGIL (Lat: 42.461875,  Lng: -76.177358),  Route carried "on" structure: County highway ,  Year Built: 1955,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 106 (year 2001),  Truck Traffic: 8%,  Average Future Daily Traffic: 122 (year 2021),  Design Load: HS 25,  Features Intersected: BABCOCK HOLLOW CK,  Facility Carried by Structure: BABCOCK HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $338,000 ( Estimate for 2007),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete

Discuss this city on our hugely popular New York forum

Back to: Harford, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.