U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Hart's Location, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Hart's Location, NH, New Hampshire, New Hampshire forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 15
Total length: 23 meters (75ft)
Total costs: $22,500,000
Total average daily traffic: 31,300
Total average daily truck traffic: 2,081
Total future (year 2026) average daily traffic: 46,324
National Bridge Inventory (NBI) Registered Bridges for Hart's Location

New bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 1
  • 1950-1959: 2
  • 1960-1969: 4
  • 1970-1979: 5
  • 1980-1989: 0
  • 1990-1999: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 116005500091,  Location: .2 MI FROM CAROLL TL (Lat: 44.213172,  Lng: -71.406856),  Route carried "on" structure: US 302,  Year Built: 1962,  Status: Open,  Structure Length: 0.37m (1.21ft),  Average Daily Traffic: 2,400 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,552 (year 2026),  Design Load: H 20,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 116006000091,  Location: .4 MI CARROLL T.L. (Lat: 44.208858,  Lng: -71.404425),  Route carried "on" structure: US 302,  Year Built: 1960,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,100 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,108 (year 2026),  Design Load: H 20,  Features Intersected: FLUME CASCADE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 11600630009,  Location: 0.5 MI CARROLL T.L. (Lat: 44.206731,  Lng: -71.403211),  Route carried "on" structure: US 302,  Year Built: 1960,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,100 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,108 (year 2026),  Design Load: H 20,  Features Intersected: SILVER CASCADE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 116006900081,  Location: 1.3 MI SE FROM CARROLL TL (Lat: 44.197761,  Lng: -71.407253),  Route carried "on" structure: US 302,  Year Built: 1978,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,900 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: WILLEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.819,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116007000084,  Location: 1.0 MI FROM CARROLL TL (Lat: 44.200031,  Lng: -71.406419),  Route carried "on" structure: US 302,  Year Built: 1978,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 2,400 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,552 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116011600085,  Location: 3.5 MI CARROLL TL (Lat: 44.170139,  Lng: -71.384397),  Route carried "on" structure: US 302,  Year Built: 1960,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,900 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: HS 20,  Features Intersected: AVALANCHE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.697,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116012700096,  Location: 4.4 MI CARROLL TL (Lat: 44.164989,  Lng: -71.369211),  Route carried "on" structure: US 302,  Year Built: 1949,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 2,100 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,108 (year 2026),  Design Load: HS 25,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.097,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 116013600097,  Location: 5.2MI S.E. CARROLL T.L. (Lat: 44.161033,  Lng: -71.366378),  Route carried "on" structure: US 302,  Year Built: 1939,  Status: Open,  Structure Length: 0.49m (1.61ft),  Average Daily Traffic: 1,900 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: H 15,  Features Intersected: RELIEF OPENING A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.982,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116014200094,  Location: 5.3 MI FROM CARROLL TL (Lat: 44.153064,  Lng: -71.364683),  Route carried "on" structure: US 302,  Year Built: 1976,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 2,100 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,108 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.497,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116014900089,  Location: 5.8 MI CARROLL TL (Lat: 44.145983,  Lng: -71.365536),  Route carried "on" structure: US 302,  Year Built: 1950,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,100 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,108 (year 2026),  Design Load: H 20,  Features Intersected: BEMIS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.350,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116016800084,  Location: 6.8 MI S.E. CARROLL T.L. (Lat: 44.136197,  Lng: -71.360778),  Route carried "on" structure: US 302,  Year Built: 1950,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,900 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: HS 25,  Features Intersected: DAVIS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.525,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.66m (2.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 116019700077,  Location: 4.2 MI.BARTLETT T.L. (Lat: 44.113397,  Lng: -71.354022),  Route carried "on" structure: US 302,  Year Built: 1978,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 2,000 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,960 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: NHRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.390,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 116020100072,  Location: 8.3 MI CARROLL TL (Lat: 44.112433,  Lng: -71.353828),  Route carried "on" structure: US 302,  Year Built: 1978,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 2,000 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,960 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: NANCY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.502,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 116023500059,  Location: 1.8 MI FROM BARTLETT TL (Lat: 44.085036,  Lng: -71.349472),  Route carried "on" structure: US 302,  Year Built: 1991,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 2,200 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,256 (year 2026),  Design Load: HS 25,  Features Intersected: SAWYER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.737,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 116025600069,  Location: 0.3 MI FROM BARTLETT TL (Lat: 44.075903,  Lng: -71.335178),  Route carried "on" structure: US 302,  Year Built: 1939,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,200 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,256 (year 2026),  Design Load: HS 25,  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.379,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: U3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New Hampshire forum

Back to: Hart's Location, NH, New Hampshire, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.