U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Hartwick, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Hartwick, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 20 meters (66ft)
Total costs: $9,521,000
Total average daily traffic: 25,107
Total average daily truck traffic: 2,104
Total future (year 2017) average daily traffic: 33,990
National Bridge Inventory (NBI) Registered Bridges for Hartwick

New bridges - Historical Statistics

  • 1930-1939: 7
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 4

Reconstructed bridges - Historical Statistics

  • 1960-1969: 2
  • 1970-1979: 1
  • 1980-1989: 3

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101995,  Location: 2.0 MI S COOPERSTOWN (Lat: 42.666061,  Lng: -74.959017),  Route carried "on" structure: State highway 28,  Year Built: 1931,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 1.88m (6.17ft),  Average Daily Traffic: 8,273 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,298 (year 2026),  Design Load: HS 20,  Features Intersected: OAKS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.301,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $529,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $844,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 104032,  Location: 4.1 MI S OF HARTWICK (Lat: 42.600603,  Lng: -75.051961),  Route carried "on" structure: State highway 205,  Year Built: 1931,  Year Reconstructed: 1974,  Status: Posted for load-capacity,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,286 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,122 (year 2027),  Features Intersected: SMALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.132,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $958,000,  Roadway Improvement Cost: $651,000,  Total Project Cost: $1,609,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 104033,  Location: 0.3 MI N OF HARTWICK (Lat: 42.663661,  Lng: -75.049547),  Route carried "on" structure: State highway 205,  Year Built: 1935,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,299 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,774 (year 2025),  Design Load: HS 20,  Features Intersected: OTEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $958,000,  Roadway Improvement Cost: $651,000,  Total Project Cost: $1,609,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 109454,  Location: 2.7 MI S COOPERSTOWN (Lat: 42.657881,  Lng: -74.960450),  Route carried "on" structure: State highway 28,  Year Built: 1930,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,273 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,298 (year 2026),  Features Intersected: CHASE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.860,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,161,000,  Roadway Improvement Cost: $663,000,  Total Project Cost: $1,824,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222753,  Location: MOTT ROAD (Lat: 42.682178,  Lng: -75.048125),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 224 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 312 (year 2025),  Design Load: HS 20,  Features Intersected: OTEGO CREEK,  Facility Carried by Structure: MOTT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $203,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222754,  Location: JONES CROSSING (Lat: 42.628467,  Lng: -75.054419),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 161 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 224 (year 2019),  Features Intersected: OTEGO CREEK,  Facility Carried by Structure: JONES CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Wood or Timber,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $203,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222756,  Location: 0.7 MI WEST OF INDEX (Lat: 42.663583,  Lng: -74.971522),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 335 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 467 (year 2019),  Design Load: HS 20,  Features Intersected: CHASE CREEK,  Facility Carried by Structure: BURKE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $203,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33539,  Location: HAMLET OF SOUTH HARTWICK (Lat: 42.616522,  Lng: -75.057456),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1993,  Status: Closed,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 136 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 190 (year 2017),  Features Intersected: OTEGO CREEK,  Facility Carried by Structure: COUNTY ROAD 11D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $430,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335391,  Location: 1 MI WEST OF HARTWICK (Lat: 42.656517,  Lng: -75.057594),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,035 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,226 (year 2025),  Features Intersected: TRIB OTEGO CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $102,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335392,  Location: .5 MILE WEST OF HARTWICK (Lat: 42.659414,  Lng: -75.053356),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,063 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,259 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: OTEGO CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $102,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 335393,  Location: 0.2 MI SE OF INDEX (Lat: 42.661450,  Lng: -74.949881),  Route carried "on" structure: County highway ,  Year Built: 1932,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 806 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,124 (year 2023),  Features Intersected: SUSQUEHANNA RIVER,  Facility Carried by Structure: COUNTY ROAD 11C
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Critical Feature Inspection Date: November 2007,  Bridge Improvement Cost: $731,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $1,166,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335446,  Location: 2 MILES NW OF MILFORD (Lat: 42.614383,  Lng: -74.984033),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 156 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 218 (year 2017),  Features Intersected: HINMAN HOLLOW BRK,  Facility Carried by Structure: COUNTY ROAD 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $250,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33546,  Location: HAMLET OF TODDSVILLE (Lat: 42.687894,  Lng: -74.957100),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 1,060 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,478 (year 2027),  Design Load: H 15,  Features Intersected: OAKS CREEK,  Facility Carried by Structure: COUNTY ROAD 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $976,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Hartwick, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.