Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Harvest, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 262ft / 79.5mTotal length
  • $23,673,000Total costs
  • 68,197Total average daily traffic
  • 2,337Total average daily truck traffic
  • 94,370Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Harvest
  • No street view available for this location

New bridges in Harvest, AL - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 41940-1949
  • 81950-1959
  • 41960-1969
  • 11980-1989
  • 22000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Harvest, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 8.3%Good
  • 41.7%Satisfactory
  • 33.3%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 25.0%Good
  • 41.7%Satisfactory
  • 16.7%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 8.3%Poor
  • 8.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.0%Excellent
  • 16.0%Very good
  • 8.0%Good
  • 40.0%Satisfactory
  • 28.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.7%Excellent
  • 7.7%Very good
  • 23.1%Good
  • 46.2%Satisfactory
  • 15.4%Fair
Find on map >>   Show street view

Structure Number: 1213,  Location: 0.25 MI E CO RD 1110 (Lat: 34.903544,  Lng: -86.689203),  Route carried "on" structure: County highway 15,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 3,218 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,861 (year 2034),  Design Load: H 15,  Features Intersected: BEAVER DAM CREEK,  Facility Carried by Structure: PULASKI PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1425,  Location: 0.5 MI N TONEY (Lat: 34.902372,  Lng: -86.731719),  Route carried "on" structure: County highway 11,  Year Built: 1936,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 750 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2035),  Design Load: H 15,  Features Intersected: TONEY SPRING BRANCH,  Facility Carried by Structure: OLD RR BED RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1663,  Location: 0.2 MI E FAS RT 02 (Lat: 34.933300,  Lng: -86.744292),  Route carried "on" structure: County highway 263,  Year Built: 1937,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 400 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 520 (year 2034),  Design Load: H 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: READY SECTION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $211,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1713,  Location: 0.6 MI S CO RD 068 (Lat: 34.838031,  Lng: -86.749147),  Route carried "on" structure: County highway 5,  Year Built: 1938,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,800 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2035),  Design Load: H 15,  Features Intersected: LOVE DITCH,  Facility Carried by Structure: WALL-TRIANA HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $211,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2371,  Location: 0.1 MI E JCT CO RD 088 (Lat: 34.815714,  Lng: -86.710811),  Route carried "on" structure: County highway 43,  Year Built: 1940,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 720 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 950 (year 2035),  Design Load: H 15,  Features Intersected: KELLY SPRING BR,  Facility Carried by Structure: KELLY SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $366,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2621,  Location: 0.5 MI E JCT CO RD 011 (Lat: 34.815864,  Lng: -86.761667),  Route carried "on" structure: County highway 337,  Year Built: 1941,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 220 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 305 (year 2040),  Design Load: H 15,  Features Intersected: SMITH BRANCH,  Facility Carried by Structure: ORVILLE SMITH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $244,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3326,  Location: 1.8 MI W JCT CO RD 260 (Lat: 34.918239,  Lng: -86.702342),  Route carried "on" structure: County highway 101,  Year Built: 1948,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 733 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 879 (year 2035),  Design Load: H 15,  Features Intersected: BEAVER DAM CREEK,  Facility Carried by Structure: OPP REYNOLDS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $317,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4032,  Location: 1.1 MI N TONEY (Lat: 34.914250,  Lng: -86.730669),  Route carried "on" structure: County highway 11,  Year Built: 1951,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,020 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,425 (year 2040),  Design Load: H 15,  Features Intersected: LIMESTONE CREEK,  Facility Carried by Structure: OLD R R BED RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,245,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,370,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4132,  Location: SEC36 T1S R3W (Lat: 34.909647,  Lng: -86.799961),  Route carried "on" structure: County highway 100,  Year Built: 1951,  Status: Closed,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 213 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 316 (year 2033),  Features Intersected: FALL BRANCH,  Facility Carried by Structure: THACH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: August 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $169,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4663,  Location: SEC27 T2SR3W (Lat: 34.851686,  Lng: -86.815317),  Route carried "on" structure: County highway 86,  Year Built: 1953,  Status: Posted for load,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 675 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,003 (year 2033),  Design Load: H 15,  Features Intersected: LIMESTONE CR,  Facility Carried by Structure: HARVEST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.10m (39.70ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: November 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,908,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,099,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5361,  Location: 0.1 MI WEST CO RD 1336 (Lat: 34.884358,  Lng: -86.783542),  Route carried "on" structure: County highway 290,  Year Built: 1955,  Status: Posted for load,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 1,434 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,720 (year 2034),  Design Load: H 15,  Features Intersected: LIMESTONE CREEK,  Facility Carried by Structure: MCKEE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.43m (34.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,717,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,889,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5948,  Location: 8 MI N JCT US 72 (Lat: 34.832108,  Lng: -86.701131),  Route carried "on" structure: State highway 53,  Year Built: 1957,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 20,926 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 29,296 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 527.511,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $593,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 595,  Location: 15 MI N JCT US72 * SR53 (Lat: 34.919850,  Lng: -86.764258),  Route carried "on" structure: State highway 53,  Year Built: 1957,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 7,499 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,499 (year 2039),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 538.393,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,615,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7077,  Location: SEC26 T2S R3W (Lat: 34.835219,  Lng: -86.808214),  Route carried "on" structure: County highway 64,  Year Built: 1960,  Status: Posted for load,  Structure Length: 10.26m (33.66ft),  Average Daily Traffic: 700 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,040 (year 2034),  Design Load: H 15,  Features Intersected: LIMESTONE CR,  Facility Carried by Structure: COPELAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.18m (36.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,764,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,940,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7174,  Location: 0.2 MI E OF CO RD 490 (Lat: 34.857725,  Lng: -86.766589),  Route carried "on" structure: County highway 333,  Year Built: 1960,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 300 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 425 (year 2040),  Design Load: H 15,  Features Intersected: LESLIE BRANCH,  Facility Carried by Structure: CARROL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $474,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $521,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7187,  Location: 0.2 MI S CO RD 068 (Lat: 34.844433,  Lng: -86.766756),  Route carried "on" structure: County highway 490,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 237 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: H 15,  Features Intersected: LOVE DITCH,  Facility Carried by Structure: CARROL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $395,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9162,  Location: SEC24 T1S R3W (Lat: 34.919450,  Lng: -86.802319),  Route carried "on" structure: County highway 106,  Year Built: 1966,  Status: Posted for load,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 15 (year 2014),  Average Future Daily Traffic: 35 (year 2034),  Features Intersected: LITTLE LIMESTONE,  Facility Carried by Structure: LIBERTY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.88m (12.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: November 2020,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $381,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12806,  Location: 0.25 MI WEST HWY 53 (Lat: 34.830542,  Lng: -86.703256),  Route carried "on" structure: County highway 58,  Year Built: 1982,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 420 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 505 (year 2040),  Design Load: HS 20,  Features Intersected: HAM CREEK,  Facility Carried by Structure: BURWELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $426,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15659,  Location: 1 MI N TONEY (Lat: 34.918369,  Lng: -86.730500),  Route carried "on" structure: County highway 317,  Year Built: 1952,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 30 (year 1992),  Average Future Daily Traffic: 90 (year 2034),  Features Intersected: DRY CREEK,  Facility Carried by Structure: TURNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 6.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $218,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15661,  Location: 0.3 MI N JCT MCKEE RD (Lat: 34.886544,  Lng: -86.774900),  Route carried "on" structure: County highway 85,  Year Built: 1952,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 175 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 235 (year 2041),  Features Intersected: HARDIN BRANCH,  Facility Carried by Structure: TONEY SCHOOL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18812,  Location: 9 MI N JCT US 72 (Lat: 34.842656,  Lng: -86.709817),  Route carried "on" structure: State highway 53,  Year Built: 2012,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 21,752 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 30,453 (year 2040),  Design Load: HS 20,  Features Intersected: HAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 528.552,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 84.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,172,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $3,489,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19055,  Location: WEST OF WALL * TRIANA???? (Lat: 34.933325,  Lng: -86.749525),  Route carried "on" structure: County highway 263,  Year Built: 2005,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 1,160 (year 2005),  Average Future Daily Traffic: 1,685 (year 2040),  Features Intersected: DRY CREEK,  Facility Carried by Structure: READY SECTION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $666,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19195,  Location: 0.25 MI. S OF CORD 1333 (Lat: 34.854153,  Lng: -86.784369),  Route carried "on" structure: County highway 336,  Year Built: 1940,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 680 (year 2010),  Truck Traffic: 12%,  Average Future Daily Traffic: 680 (year 2030),  Design Load: HS 20,  Features Intersected: LESLIE BRANCH,  Facility Carried by Structure: LOVE BRANCH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $506,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19199,  Location: 1.5 MI. N OF 53 HWY.????? (Lat: 34.916467,  Lng: -86.748528),  Route carried "on" structure: County highway 495,  Year Built: 2005,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 890 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,335 (year 2040),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK,  Facility Carried by Structure: WALL TRIANA HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,496,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $2,746,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21422,  Location: _SEC10 T4S R3W (Lat: 34.919450,  Lng: -86.802319),  Route carried "on" structure: County highway 10,  Year Built: 2020,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 2,230 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,313 (year 2038),  Design Load: HL 93,  Features Intersected: LIMESTONE CRK SLOUGH,  Facility Carried by Structure: OLD HWY 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 53.8m (176.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,877,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,065,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Harvest, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.