![]() |
Bridge Statistics for Hastings, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Hastings, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 29 Total length: 144 meters (472ft) Total costs: $32,668,000 Total average daily traffic: 288,994 Total average daily truck traffic: 52,392 National Bridge Inventory (NBI) Registered Bridges for Hastings
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 100855, Location: .8 MI S JCT US 11 & SH 49 (Lat: 43.274606, Lng: -76.144417), Route carried "on" structure: US 11, Year Built: 1994, Status: Open, Structure Length: 10.33m (33.89ft), Average Daily Traffic: 8,716 (year 2005), Truck Traffic: 4%, Average Future Daily Traffic: 12,202 (year 2025), Design Load: HS 25, Features Intersected: CSX TRANSPRTATION Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.939, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 39.9m (130.9ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Very good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.33m (33.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $742,000, Roadway Improvement Cost: $441,000, Total Project Cost: $1,183,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 102616, Location: 3.2 MI W JCT RTS 49 + 11 (Lat: 43.299083, Lng: -76.207519), Route carried "on" structure: State highway 49, Year Built: 1933, Year Reconstructed: 1991, Status: Open, Structure Length: 1.24m (4.07ft), Average Daily Traffic: 4,542 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 5,026 (year 2026), Design Load: HS 20, Features Intersected: CAUGHDENOY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.665, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb-To-Curb Width: 8.3m (27.2ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Inventory Rating: 83.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.24m (4.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $2,182,000, Roadway Improvement Cost: $1,266,000, Total Project Cost: $3,448,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102617, Location: 0.2 MI W JCT RTS 49& I-81 (Lat: 43.285694, Lng: -76.136397), Route carried "on" structure: State highway 49, Year Built: 1982, Status: Open, Structure Length: 5.27m (17.29ft), Average Daily Traffic: 14,346 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 20,084 (year 2027), Design Load: HS 20, Features Intersected: LITTLE BAY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.995, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.6m (70.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 15.6m (51.2ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Very good, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.27m (17.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,775,000, Roadway Improvement Cost: $1,056,000, Total Project Cost: $2,831,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 102618, Location: JCT OF RTS 49 + I-81 (Lat: 43.286300, Lng: -76.125333), Route carried "on" structure: State highway 49, Year Built: 1960, Year Reconstructed: 1974, Status: Open, Structure Length: 6.88m (22.57ft), Average Daily Traffic: 15,280 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 16,909 (year 2026), Design Load: HS 20, Features Intersected: RTE I81 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.309, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 16.4m (53.8ft), Skew: 21 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 16.4m (53.8ft), Out-to-Out Width: 19.2m (63.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.88m (22.57ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $2,857,000, Roadway Improvement Cost: $1,657,000, Total Project Cost: $4,514,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1031771, Location: W MONROE @ ONEIDA LAKE (Lat: 43.241511, Lng: -76.131275), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 1975, Status: Open, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 18,270 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 25,578 (year 2027), Design Load: HS 20, Features Intersected: CR 37 - SWAMP RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.405, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.9m (48.9ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.5m (1.6ft), Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 16.1m (52.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.08m (13.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,418,000, Roadway Improvement Cost: $843,000, Total Project Cost: $2,261,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1031772, Location: W MONROE @ ONEIDA LAKE (Lat: 43.241525, Lng: -76.131044), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 1975, Status: Open, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 18,270 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 25,578 (year 2027), Design Load: HS 20, Features Intersected: CR 37 - SWAMP RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.405, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.9m (48.9ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.0m, Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 16.1m (52.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.08m (13.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,418,000, Roadway Improvement Cost: $843,000, Total Project Cost: $2,261,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 103178, Location: 1.1 MI N JCT I81 & SH 49 (Lat: 43.304828, Lng: -76.126550), Route carried "on" structure: County highway , Year Built: 1960, Year Reconstructed: 1974, Status: Open, Structure Length: 8.83m (28.97ft), Average Daily Traffic: 1,161 (year 1999), Truck Traffic: 4%, Average Future Daily Traffic: 1,625 (year 2019), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: COUNTY ROAD 12 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 18.5m (60.7ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.83m (28.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,418,000, Roadway Improvement Cost: $843,000, Total Project Cost: $2,261,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103179, Location: 2.6 MI N JCT RTS 81I + 49 (Lat: 43.327753, Lng: -76.124631), Route carried "on" structure: County highway , Year Built: 1960, Year Reconstructed: 1974, Status: Open, Structure Length: 7.80m (25.59ft), Average Daily Traffic: 1,204 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 1,686 (year 2026), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: COUNTY ROAD 32 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.80m (25.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,802,000, Roadway Improvement Cost: $1,072,000, Total Project Cost: $2,874,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031801, Location: 2.9 MI N JCT RTS I81SB+49 (Lat: 43.330031, Lng: -76.123844), Route carried "on" structure: Interstate 81, Year Built: 1960, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 11,769 (year 2007), Truck Traffic: 23%, Average Future Daily Traffic: 17,965 (year 2027), Design Load: H 20, Features Intersected: DYKEMAN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.870, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.8m (38.7ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.9m (12.8ft), Curb-To-Curb Width: 12.1m (39.7ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 72.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $248,000, Roadway Improvement Cost: $148,000, Total Project Cost: $396,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031802, Location: 2.9 MI N JCT RTS I81NB+49 (Lat: 43.330044, Lng: -76.123428), Route carried "on" structure: Interstate 81, Year Built: 1960, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 11,769 (year 2007), Truck Traffic: 23%, Average Future Daily Traffic: 17,965 (year 2027), Design Load: H 20, Features Intersected: DYKEMAN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.870, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.8m (38.7ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.9m (12.8ft), Curb-To-Curb Width: 12.1m (39.7ft) Condition: Channel: Satisfactory, Culverts: Very good, Operating Rating: 72.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $248,000, Roadway Improvement Cost: $148,000, Total Project Cost: $396,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103181, Location: 1.9 MI S JCT I81 & SH 69 (Lat: 43.373800, Lng: -76.122508), Route carried "on" structure: County highway , Year Built: 1960, Year Reconstructed: 1974, Status: Open, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 727 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 913 (year 2019), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: COUNTY ROAD 84 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.6m (70.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 7.04m (23.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,626,000, Roadway Improvement Cost: $967,000, Total Project Cost: $2,593,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031821, Location: 1.8 MI S JCT RTS I81SB+69 (Lat: 43.377436, Lng: -76.121786), Route carried "on" structure: Interstate 81, Year Built: 1960, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 11,769 (year 2007), Truck Traffic: 23%, Average Future Daily Traffic: 17,965 (year 2027), Design Load: H 20, Features Intersected: LITTLE SALMON RIV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.870, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.2m (13.8ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 72.9 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $267,000, Roadway Improvement Cost: $159,000, Total Project Cost: $426,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031822, Location: 1.8 MI S JCT I81NB & SH69 (Lat: 43.377356, Lng: -76.121381), Route carried "on" structure: Interstate 81, Year Built: 1960, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 11,769 (year 2007), Truck Traffic: 23%, Average Future Daily Traffic: 17,965 (year 2027), Design Load: H 20, Features Intersected: LITTLE SALMON RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.870, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.2m (13.8ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 72.9 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $267,000, Roadway Improvement Cost: $159,000, Total Project Cost: $426,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220893, Location: 3.2 MI SE OF PARISH (Lat: 43.368022, Lng: -76.096786), Route carried "on" structure: City street , Year Built: 1987, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 7 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 9 (year 2019), Features Intersected: S BR LIL SALMON R, Facility Carried by Structure: NELLIS DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 3.6m (11.8ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 74.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $135,000, Roadway Improvement Cost: $80,000, Total Project Cost: $215,000 ( Estimate for 2007) Find on map >>
Structure Number: 320894, Location: 2.0 MI S OF PARISH (Lat: 43.377669, Lng: -76.119039), Route carried "on" structure: City street , Year Built: 1999, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 461 (year 2001), Truck Traffic: 6%, Average Future Daily Traffic: 579 (year 2021), Features Intersected: CARLEY MILLS POND, Facility Carried by Structure: WHITE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.2m (13.8ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 75.6 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $192,000, Roadway Improvement Cost: $114,000, Total Project Cost: $306,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331354, Location: 2.5 MI SW OF CENTRAL SQUA (Lat: 43.275239, Lng: -76.191272), Route carried "on" structure: County highway , Year Built: 1940, Year Reconstructed: 1953, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 2,650 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 3,271 (year 2018), Features Intersected: CAUGHDENOY CREEK, Facility Carried by Structure: COUNTY ROAD 12 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 9.6m (31.5ft), Out-to-Out Width: 10.3m (33.8ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 73.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.73m (2.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $164,000, Roadway Improvement Cost: $97,000, Total Project Cost: $261,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331355, Location: 3 MI NE OF CENTRAL SQUARE (Lat: 43.322686, Lng: -76.116922), Route carried "on" structure: County highway , Year Built: 1996, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 1,877 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 2,628 (year 2018), Features Intersected: DYKEMAN CREEK, Facility Carried by Structure: COUNTY ROAD 12 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $164,000, Roadway Improvement Cost: $97,000, Total Project Cost: $261,000 ( Estimate for 2007), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331356, Location: 3 MI NE OF CENTRAL SQUARE (Lat: 43.322394, Lng: -76.111483), Route carried "on" structure: County highway , Year Built: 1996, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 1,605 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 2,247 (year 2018), Features Intersected: BIG BAY CREEK, Facility Carried by Structure: COUNTY ROAD 32 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.2m (13.8ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 74.5 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.98m (3.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $205,000, Roadway Improvement Cost: $122,000, Total Project Cost: $327,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331359, Location: 2 MI SOUTH OF PARISH (Lat: 43.377911, Lng: -76.122981), Route carried "on" structure: County highway , Year Built: 1958, Status: Open, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 317 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 398 (year 2019), Design Load: HS 20, Features Intersected: S B LIL SALMON RV, Facility Carried by Structure: CARLEY MILLS RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.8m (15.7ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 76.0 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.07m (3.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $196,000, Roadway Improvement Cost: $117,000, Total Project Cost: $313,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 33136, Location: 2.8 MI SW OF CENTRAL SQ (Lat: 43.268114, Lng: -76.195017), Route carried "on" structure: County highway , Year Built: 1940, Year Reconstructed: 1962, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 1,429 (year 2002), Truck Traffic: 8%, Average Future Daily Traffic: 1,648 (year 2022), Design Load: HS 20, Features Intersected: CAUGHDENOY CREEK, Facility Carried by Structure: COUNTY ROAD 37 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 8.3m (27.2ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Poor, Channel: Very good, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2006, Underwater Inspection Date: August 2005, Bridge Improvement Cost: $158,000, Roadway Improvement Cost: $94,000, Total Project Cost: $252,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 336046, Location: 3.3 MI SW OF CENTRAL SQ (Lat: 43.270606, Lng: -76.206325), Route carried "on" structure: County highway , Year Built: 1900, Status: Open, Structure Length: 11.18m (36.68ft), Average Daily Traffic: 1,275 (year 2000), Truck Traffic: 8%, Average Future Daily Traffic: 1,471 (year 2020), Features Intersected: ONEIDA RIVER, Facility Carried by Structure: CAUGHDENOY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.9m (81.7ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 8.2m (26.9ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Very good, Operating Rating: 49.4 metric tons, Inventory Rating: 18.4 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.18m (36.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,982,000, Roadway Improvement Cost: $1,179,000, Total Project Cost: $3,161,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4031761, Location: 81I SB OVER ONEIDA LAKE (Lat: 43.238964, Lng: -76.130594), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 1975, Status: Open, Structure Length: 14.53m (47.67ft), Average Daily Traffic: 18,270 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 25,578 (year 2027), Design Load: HS 20, Features Intersected: NYS BARGE CANAL, ONEIDA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.352, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 10 degrees, Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 70.4m (231.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Very good, Operating Rating: 81.3 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.53m (47.67ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2007, Underwater Inspection Date: June 2007, Bridge Improvement Cost: $534,000, Roadway Improvement Cost: $317,000, Total Project Cost: $851,000 ( Estimate for 2007), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4031762, Location: 81I NB OVER ONEIDA LAKE (Lat: 43.238997, Lng: -76.130406), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 1975, Status: Open, Structure Length: 14.53m (47.67ft), Average Daily Traffic: 18,270 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 25,578 (year 2027), Design Load: HS 20, Features Intersected: NYS BARGE CANAL, ONEIDA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.352, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 10 degrees, Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 70.4m (231.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Very good, Operating Rating: 81.3 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.53m (47.67ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2007, Underwater Inspection Date: June 2007, Bridge Improvement Cost: $534,000, Roadway Improvement Cost: $317,000, Total Project Cost: $851,000 ( Estimate for 2007), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 102618, Location: JCT OF RTS 49 + I-81 (Lat: 43.286300, Lng: -76.125333), Route carried "under" structure: Interstate 81, Year Built: 1960, Structure Length: 6.88m (22.57ft), Average Daily Traffic: 36,540 (year 2007), Truck Traffic: 20%, Features Intersected: RTE I81, Facility Carried by Structure: RTE 49 Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 5.728, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.9m (71.9ft) Find on map >>
Structure Number: 1031771, Location: W MONROE @ ONEIDA LAKE (Lat: 43.241511, Lng: -76.131275), Route carried "under" structure: County highway , Year Built: 1959, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 3,045 (year 2006), Truck Traffic: 4%, Features Intersected: CR 37 - SWAMP RD, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.49m (14.73ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.7m (44.9ft) Find on map >>
Structure Number: 1031772, Location: W MONROE @ ONEIDA LAKE (Lat: 43.241525, Lng: -76.131044), Route carried "under" structure: County highway , Year Built: 1959, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 3,045 (year 2006), Truck Traffic: 4%, Features Intersected: CR 37 - SWAMP RD, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.7m (44.9ft) Find on map >>
Structure Number: 103178, Location: 1.1 MI N JCT I81 & SH 49 (Lat: 43.304828, Lng: -76.126550), Route carried "under" structure: Interstate 81, Year Built: 1960, Structure Length: 8.83m (28.97ft), Average Daily Traffic: 23,537 (year 2007), Truck Traffic: 20%, Features Intersected: RTE I81, Facility Carried by Structure: COUNTY ROAD 12 Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.782, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.5m (60.7ft) Find on map >>
Structure Number: 103179, Location: 2.6 MI N JCT RTS 81I + 49 (Lat: 43.327753, Lng: -76.124631), Route carried "under" structure: Interstate 81, Year Built: 1960, Structure Length: 7.80m (25.59ft), Average Daily Traffic: 23,537 (year 2007), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: COUNTY ROAD 32 Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 10.442, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.4m (53.8ft) Find on map >>
Structure Number: 103181, Location: 1.9 MI S JCT I81 & SH 69 (Lat: 43.373800, Lng: -76.122508), Route carried "under" structure: Interstate 81, Year Built: 1960, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 23,537 (year 2007), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: COUNTY ROAD 84 Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 15.623, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft) Discuss this city on our hugely popular New York forum Back to: Hastings, NY, New York, All US cities.
|
![]() |