  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 443ft / 135mTotal length
  • $36,064,000Total costs
  • 103,248Total average daily traffic
  • 4,070Total average daily truck traffic
  • 141,346Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hazel Green
  • No street view available for this location

New bridges in Hazel Green, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31920-1929
  • 51930-1939
  • 51940-1949
  • 11950-1959
  • 51960-1969
  • 11980-1989
  • 11990-1999
  • 82000-2009
  • 22010-2019
Reconstructed bridges in Hazel Green, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Hazel Green, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.6%Excellent
  • 18.2%Very good
  • 18.2%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.6%Excellent
  • 18.2%Very good
  • 22.7%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 27.3%Very good
  • 45.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 18.8%Very good
  • 12.5%Good
  • 21.9%Satisfactory
  • 40.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 70.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 5,  Location: 0.2 MI N JCT CO RD 142 (Lat: 34.964881,  Lng: -86.621233),  Route carried "on" structure: County highway 147,  Year Built: 1910,  Year Reconstructed: 1995,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 310 (year 2040),  Design Load: H 10,  Features Intersected: COPELAND CREEK,  Facility Carried by Structure: LARKIN SULLIVAN R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 9.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 166,  Location: 0.2 MI SO JCT CO RD 154 (Lat: 34.937789,  Lng: -86.520511),  Route carried "on" structure: County highway 249,  Year Built: 1937,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 140 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 205 (year 2035),  Design Load: H 15,  Features Intersected: PIGRUM BRANCH,  Facility Carried by Structure: TANNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1826,  Location: 0.1 S CO RD 214 (Lat: 34.976597,  Lng: -86.641408),  Route carried "on" structure: County highway 138,  Year Built: 1938,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 295 (year 2040),  Design Load: H 15,  Features Intersected: COPELAND CREEK,  Facility Carried by Structure: BUTTER * EGG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $263,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1859,  Location: 100 FT W JCT FAS RT 45 04 (Lat: 34.976950,  Lng: -86.642217),  Route carried "on" structure: County highway 274,  Year Built: 1938,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 620 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 840 (year 2029),  Design Load: H 15,  Features Intersected: W FORK COPELAND CREEK,  Facility Carried by Structure: ELKWOOD SECTION R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $382,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2065,  Location: 0.3 MI W JCT CO RD 249 (Lat: 34.957669,  Lng: -86.524911),  Route carried "on" structure: County highway 246,  Year Built: 1939,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 634 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 760 (year 2035),  Design Load: H 15,  Features Intersected: PIGRUM BRANCH,  Facility Carried by Structure: BOLES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $268,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2071,  Location: 1.6 MI E JCT US HWY 231 (Lat: 34.976050,  Lng: -86.558367),  Route carried "on" structure: County highway 274,  Year Built: 1939,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,636 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,963 (year 2035),  Design Load: H 15,  Features Intersected: SLATE ROCK BRANCH,  Facility Carried by Structure: LINCOLN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2465,  Location: 2 MI W HAZEL GREEN (Lat: 34.925014,  Lng: -86.604122),  Route carried "on" structure: County highway 154,  Year Built: 1940,  Status: Posted for load,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 1,620 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,950 (year 2040),  Design Load: H 15,  Features Intersected: COPELAND CREEK,  Facility Carried by Structure: WEST LIMESTONE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 29.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3351,  Location: 0.3MILE WEST JCT CORD 152 (Lat: 34.919564,  Lng: -86.621694),  Route carried "on" structure: County highway 154,  Year Built: 1948,  Status: Posted for load,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,620 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,950 (year 2040),  Design Load: H 15,  Features Intersected: BRIER FORK CREEK,  Facility Carried by Structure: WEST LIMESTONE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,778,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,956,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3352,  Location: 0.3 MI NE JCT CO RD 186 (Lat: 34.936758,  Lng: -86.523992),  Route carried "on" structure: County highway 154,  Year Built: 1948,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 3,078 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,693 (year 2034),  Design Load: H 15,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: JOE QUICK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,118,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3353,  Location: 0.3 MI NE JCT CO RD 187 (Lat: 34.937608,  Lng: -86.522508),  Route carried "on" structure: County highway 154,  Year Built: 1948,  Status: Posted for load,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 3,078 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,693 (year 2041),  Design Load: H 15,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: JOE QUICK RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,114,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,325,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3354,  Location: 0.4 MI NE JCT CO RD 187 (Lat: 34.939253,  Lng: -86.519725),  Route carried "on" structure: County highway 154,  Year Built: 1948,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,078 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,693 (year 2034),  Design Load: H 15,  Features Intersected: PIGRUM BRANCH,  Facility Carried by Structure: JOE QUICK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $294,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6751,  Location: 6 MI S TENN ST LINE (Lat: 34.906667,  Lng: -86.571667),  Route carried "on" structure: US 231,  Year Built: 1929,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 20,122 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,171 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 558.661,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $956,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,052,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6752,  Location: 2 MI S TENN STATE LINE (Lat: 34.958333,  Lng: -86.570000),  Route carried "on" structure: US 231,  Year Built: 1929,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 20,122 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,171 (year 2039),  Design Load: H 15,  Features Intersected: WEST FORK FLINT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 564.366,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.67m (31.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,189,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,408,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6753,  Location: 0.2 MI S TENN ST LINE (Lat: 34.986667,  Lng: -86.570000),  Route carried "on" structure: US 231,  Year Built: 1929,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 13,382 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,735 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 567.622,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,143,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,257,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 73,  Location: 2 MI S ALA-TENN ST LINE (Lat: 34.958342,  Lng: -86.569236),  Route carried "on" structure: US 231,  Year Built: 1961,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 20,122 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,171 (year 2039),  Design Load: HS 20,  Features Intersected: WEST FORK FLINT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 564.366,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.76m (32.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,209,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $2,430,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 781,  Location: 1 MI W JCT US HWY 231 (Lat: 34.976539,  Lng: -86.585306),  Route carried "on" structure: County highway 274,  Year Built: 1962,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 850 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2040),  Design Load: H 15,  Features Intersected: FOWLER CREEK,  Facility Carried by Structure: ELKWOOD SECTION R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,043,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7811,  Location: 0.3 MI W US HWY 231 JCT (Lat: 34.976197,  Lng: -86.573428),  Route carried "on" structure: County highway 274,  Year Built: 1962,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 820 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2040),  Design Load: H 15,  Features Intersected: WALKER CREEK,  Facility Carried by Structure: ELKWOOD SECTION R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,344,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,478,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 844,  Location: 0.5 S JCT CO RD 153 (Lat: 34.925503,  Lng: -86.633433),  Route carried "on" structure: County highway 138,  Year Built: 1964,  Status: Posted for load,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,586 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,903 (year 2035),  Design Load: H 15,  Features Intersected: BRIAR FORK CREEK,  Facility Carried by Structure: BRIAR FORK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,010,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,211,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9183,  Location: 0.5 MI N JCT CO RD 274 (Lat: 34.981994,  Lng: -86.601136),  Route carried "on" structure: County highway 238,  Year Built: 1966,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 202 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 242 (year 2034),  Design Load: H 15,  Features Intersected: FOWLER CREEK,  Facility Carried by Structure: EDGAR GOOCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $585,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13407,  Location: 0.5 MI N JCT US HWY 231 (Lat: 34.960311,  Lng: -86.571831),  Route carried "on" structure: County highway 239,  Year Built: 1984,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,407 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,688 (year 2035),  Design Load: H 20,  Features Intersected: MILL BRANCH,  Facility Carried by Structure: BOBO SECTION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15656,  Location: 1 MI. E. BUTTER * EGG RD (Lat: 34.961925,  Lng: -86.619367),  Route carried "on" structure: County highway 142,  Year Built: 1991,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,100 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,705 (year 2040),  Design Load: HS 20,  Features Intersected: COPELAND CREEK,  Facility Carried by Structure: BOBO SECTION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18583,  Location: WILSON MILL TO STATE PARK (Lat: 31.128528,  Lng: -85.267558),  Route carried "on" structure: County highway 24,  Year Built: 2002,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 333 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2033),  Design Load: HS 20,  Features Intersected: WEBB CREEK,  Facility Carried by Structure: LUCY GRADE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18584,  Location: 3.0 MI N LAMAR CO LINE (Lat: 34.103389,  Lng: -88.138297),  Route carried "on" structure: County highway 26,  Year Built: 2003,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 255 (year 2001),  Average Future Daily Traffic: 485 (year 2036),  Design Load: HS 20,  Features Intersected: SIPSEY CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18586,  Location: 3 MILES N LAMAR CO LINE (Lat: 34.103494,  Lng: -88.134064),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 255 (year 2001),  Average Future Daily Traffic: 485 (year 2036),  Design Load: HS 20,  Features Intersected: SIPSEY CREEK RELIEF,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $942,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18771,  Location: 6 MI S OF BROOKLYN RD (Lat: 31.252544,  Lng: -86.597083),  Route carried "on" structure: County highway 25,  Year Built: 2003,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 180 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 304 (year 2028),  Design Load: HS 20,  Features Intersected: SHADY BAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18917,  Location: 7 MILES NORTH OF GANTT (Lat: 31.513047,  Lng: -86.504236),  Route carried "on" structure: County highway 59,  Year Built: 2006,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 63 (year 2003),  Average Future Daily Traffic: 101 (year 2033),  Design Load: HS 20,  Features Intersected: PATSALIGA CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18918,  Location: CO RD 37 TO US 231 (Lat: 31.066728,  Lng: -85.368847),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 250 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 950 (year 2033),  Design Load: HS 20,  Features Intersected: DOUBLE BRIDGES CREEK,  Facility Carried by Structure: D. HODGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $946,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,041,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19053,  Location: ????????????????????????? (Lat: 34.985417,  Lng: -86.518092),  Route carried "on" structure: County highway 249,  Year Built: 2004,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 428 (year 2005),  Average Future Daily Traffic: 640 (year 2035),  Design Load: HS 20,  Features Intersected: STEWART BRANCH,  Facility Carried by Structure: GREENVILLE PIKE
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $446,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19177,  Location: .5 MI.WEST OF HWY. 231-N? (Lat: 34.902731,  Lng: -86.586989),  Route carried "on" structure: County highway 137,  Year Built: 2005,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 2,522 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,750 (year 2035),  Design Load: HS 20,  Features Intersected: BRIAR FORK CREK,  Facility Carried by Structure: GRIMWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.04m (42.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,219,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $3,541,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 20377,  Location: 1.1 MI E JCT FAS RT 45 04 (Lat: 34.976881,  Lng: -86.630156),  Route carried "on" structure: County highway 274,  Year Built: 2010,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,196 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,455 (year 2040),  Features Intersected: COPELAND CREEK,  Facility Carried by Structure: ELKWOOD SECTION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 19.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $358,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2046,  Location: 0.3 MI W US HWY 231 (Lat: 34.960861,  Lng: -86.571808),  Route carried "on" structure: County highway 142,  Year Built: 2010,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 150 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: HS 20,  Features Intersected: WEST FORK FLINT RIVER,  Facility Carried by Structure: FLOOD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21573,  Location: 1.2MI E JCT US 231 HWY (Lat: 34.961447,  Lng: -86.551372),  Route carried "on" structure: County highway 244,  Year Built: 1957,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 17.02m (55.84ft),  Average Daily Traffic: 1,949 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,338 (year 2035),  Design Load: HS 20,  Features Intersected: Flint River,  Facility Carried by Structure: Carriger Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.75m (58.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,164,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,480,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place