Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Helena, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 151ft / 46.5mTotal length
  • $16,386,000Total costs
  • 74,870Total average daily traffic
  • 7,492Total average daily truck traffic
  • 99,133Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Helena
  • No street view available for this location

New bridges in Helena, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 21980-1989
  • 41990-1999
  • 52000-2009
Average Bridge Daily Traffic in Helena, AL
Average Bridge Truck Traffic in Helena, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 50.0%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 8.3%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Very good
  • 33.3%Good
  • 55.6%Satisfactory
Find on map >>   Show street view

Structure Number: 1261,  Location: 5 MILE SW OF LOVELACE (Lat: 33.260258,  Lng: -86.990828),  Route carried "on" structure: County highway 53,  Year Built: 1993,  Status: Open,  Structure Length: 1.11m (3.64ft),  Average Daily Traffic: 1,560 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,125 (year 2041),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLUFF RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.78m (5.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $513,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $564,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 238,  Location: 3 MI. W. HELENA (Lat: 33.284867,  Lng: -86.882678),  Route carried "on" structure: County highway 52,  Year Built: 1940,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 12,090 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 16,930 (year 2041),  Design Load: H 15,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.96m (32.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $1,913,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,104,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5355,  Location: HELENA (Lat: 33.296650,  Lng: -86.843383),  Route carried "on" structure: State highway 261,  Year Built: 1955,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 11,570 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,118 (year 2040),  Design Load: H 15,  Features Intersected: BUCK CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,853,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,038,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8796,  Location: 2 MILES S OF LOVELACE (Lat: 33.295033,  Lng: -86.982800),  Route carried "on" structure: County highway 53,  Year Built: 1965,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 3,157 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 3,590 (year 2041),  Design Load: H 20,  Features Intersected: SHADES CREEK,  Facility Carried by Structure: POCAHONTAS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.05m (29.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,862,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,048,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12628,  Location: 3 MILES S OF GREENWOOD (Lat: 33.307533,  Lng: -86.963817),  Route carried "on" structure: County highway 464,  Year Built: 1981,  Status: Posted for load,  Structure Length: 3.85m (12.63ft),  Average Daily Traffic: 330 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: HS 20,  Features Intersected: SHADES CREEK,  Facility Carried by Structure: LINDSEY LOOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.79m (15.72ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13603,  Location: 3.9 MI W JCT CO 52 (Lat: 33.257792,  Lng: -86.936933),  Route carried "on" structure: County highway 13,  Year Built: 1985,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 1,125 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,739 (year 2040),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $340,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14319,  Location: .1 MI.NO.VULCAN MAT'L (Lat: 33.306433,  Lng: -86.830483),  Route carried "on" structure: State highway 261,  Year Built: 1925,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 11,100 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,544 (year 2041),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.854,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15221,  Location: 2.3MI S.JCT. COS 52* 17 (Lat: 33.256314,  Lng: -86.879056),  Route carried "on" structure: County highway 91,  Year Built: 1990,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $472,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16666,  Location: 3.5 MI N US 31 (Lat: 33.306533,  Lng: -86.833056),  Route carried "on" structure: State highway 261,  Year Built: 1996,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 11,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,544 (year 2040),  Design Load: HS 20,  Features Intersected: VULCAN MATL HAUL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.693,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 38.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,957,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17179,  Location: INTERSECTION CR 95/52 (Lat: 33.290575,  Lng: -86.835439),  Route carried "on" structure: County highway 52,  Year Built: 1997,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 12,538 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,553 (year 2042),  Design Load: HS 20,  Features Intersected: LEE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $553,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19245,  Location: RIVERWOODS SUBDIVISION (Lat: 33.296667,  Lng: -86.865278),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 3.76m (12.34ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 210 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: RIVERWOODS PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.6m (123.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,319,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,451,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19787,  Location: 0.2 MI FROM MULLINS ST (Lat: 33.292972,  Lng: -86.835722),  Route carried "on" structure: Business City street ,  Year Built: 2004,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 450 (year 2020),  Average Future Daily Traffic: 630 (year 2040),  Design Load: HS 20,  Features Intersected: PRAIRIE BROOK,  Facility Carried by Structure: ELM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.7m (5.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $220,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20189,  Location: OLD CAHABA SUBDIVISION (Lat: 33.282989,  Lng: -86.876431),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 910 (year 2040),  Design Load: HS 20,  Features Intersected: LAKE SPILLWAY,  Facility Carried by Structure: OLD CAHABA PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,604,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,764,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20278,  Location: 0.7 MI WEST AL 261 (Lat: 33.289428,  Lng: -86.860475),  Route carried "on" structure: County highway 52,  Year Built: 2009,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 8,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,900 (year 2041),  Design Load: HS 20,  Features Intersected: WALKING TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.1m (23.3ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Culverts: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.35m (4.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $823,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21613,  Location: _INT of Quail ridge road (Lat: 33.275300,  Lng: -86.928408),  Route carried "on" structure: City street 751,  Year Built: 2000,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 140 (year 2041),  Design Load: HS 20,  Features Intersected: Unnamed creek,  Facility Carried by Structure: Quail creek road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022)
Discuss Helena, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.