Bridge Statistics for Hill, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Hill, NH, New Hampshire, New Hampshire forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 11 meters (36ft) Total costs: $15,000,000 Total average daily traffic: 3,960 Total average daily truck traffic: 155 Total future (year 2026) average daily traffic: 5,861 National Bridge Inventory (NBI) Registered Bridges for Hill
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 123007500151, Location: AT ALEXANDRIA TL (Lat: 43.558647, Lng: -71.794581), Route carried "on" structure: Other road , Year Built: 2000, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 150 (year 2005), Truck Traffic: 4%, Average Future Daily Traffic: 222 (year 2027), Design Load: HS 25, Features Intersected: SMITH RIVER, Facility Carried by Structure: NOYES ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.639, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.0m (68.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 4.7m (15.4ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Inventory Rating: 68.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.29m (7.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 123013000165, Location: AT BRISTOL TL (Lat: 43.568500, Lng: -71.740044), Route carried "on" structure: Other road , Year Built: 1930, Status: Temporarily open, Structure Length: 2.44m (8.01ft), Average Daily Traffic: 330 (year 1987), Truck Traffic: 4%, Average Future Daily Traffic: 488 (year 2026), Features Intersected: SMITH RIVER, Facility Carried by Structure: BOROUGH ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.959, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 4.4m (14.4ft) Condition: Deck: Imminent failure, Superstructure: Imminent failure, Substructure: Imminent failure, Channel: Very good, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: High priority of replacement, Length Of Structure Improvement: 2.44m (8.01ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: December 2007, Critical Feature Inspection Date: December 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 12301310008, Location: 0.8 MI FR CURRIER RD (Lat: 43.508625, Lng: -71.738458), Route carried "on" structure: Other road , Year Built: 1978, Status: Open, Structure Length: 0.52m (1.71ft), Average Daily Traffic: 160 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 237 (year 2027), Features Intersected: NEEDLE SHOP BROOK, Facility Carried by Structure: BUNKER HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.223, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 5.2m (17.1ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.52m (1.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 123013900162, Location: BRIDGE ON BRISTOL-HILL T (Lat: 43.568894, Lng: -71.735056), Route carried "on" structure: Federal lands road , Year Built: 1999, Status: Open, Structure Length: 1.63m (5.35ft), Average Daily Traffic: 50 (year 1985), Average Future Daily Traffic: 74 (year 2027), Design Load: HS 25, Features Intersected: SMITH RIVER, Facility Carried by Structure: OLD NH 3A Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Corps of Engineers (Civil), Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.1m (49.5ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 6.8m (22.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 40.6 metric tons, Inventory Rating: 24.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 123014000099, Location: 2.1 MI FR (Lat: 43.522228, Lng: -71.731542), Route carried "on" structure: Other road , Year Built: 1960, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 160 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 237 (year 2027), Design Load: H 15, Features Intersected: NEEDLE SHOP BROOK, Facility Carried by Structure: BUNKER HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.347, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.4m (24.3ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Channel: Good, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 123015700107, Location: .09 MI FR PEMI. VALLEY R (Lat: 43.528897, Lng: -71.714169), Route carried "on" structure: Other road , Year Built: 1930, Status: Closed, Structure Length: 0.55m (1.80ft), Features Intersected: NEEDLE SHOP BROOK, Facility Carried by Structure: QUIMBY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.145, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 4.6m (15.1ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 4.8m (15.7ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Deck: Poor, Superstructure: Imminent failure, Substructure: Imminent failure, Channel: Satisfactory, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.55m (1.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 123015700108, Location: 1.4 MI FROM FRANKLIN (Lat: 43.527983, Lng: -71.715367), Route carried "on" structure: State highway 3A, Year Built: 1940, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 2,800 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 4,144 (year 2026), Design Load: H 15, Features Intersected: NEEDLE SHOP BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.253, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 12.5m (41.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 123017100105, Location: 0.8 MI N NEW CHESTER RD (Lat: 43.527119, Lng: -71.701417), Route carried "on" structure: Other road , Year Built: 1930, Status: Posted for load, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 300 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 444 (year 2026), Features Intersected: NEEDLE SHOP BROOK, Facility Carried by Structure: SHOP ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.435, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.1m (33.1ft), Curb-To-Curb Width: 2.4m (7.9ft), Out-to-Out Width: 3.7m (12.1ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 10.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 1.07m (3.51ft), Designated Inspection Frequency: Every 12 months, Inspection Date: December 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 123017300106, Location: FRANKLIN FALLS (Lat: 43.526786, Lng: -71.699711), Route carried "on" structure: Federal lands road , Year Built: 1920, Status: Closed, Structure Length: 0.79m (2.59ft), Features Intersected: NEEDLE SHOP BROOK, Facility Carried by Structure: OLD MAIN STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Corps of Engineers (Civil), Approaching Roadway Width: 4.3m (14.1ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 5.6m (18.4ft), Out-to-Out Width: 6.0m (19.7ft) Condition: Deck: Imminent failure, Superstructure: Imminent failure, Substructure: Imminent failure, Channel: Fair, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Gravel Find on map >>
Structure Number: 123017500109, Location: 0.4 MI W SANBORNTON TL (Lat: 43.529214, Lng: -71.696133), Route carried "on" structure: Federal lands road , Year Built: 1924, Status: Posted for load, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 10 (year 1988), Average Future Daily Traffic: 15 (year 2027), Design Load: H 10, Features Intersected: LOWER MILL BROOK, Facility Carried by Structure: OLD NH 3A Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Corps of Engineers (Civil), Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.3m (27.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 12.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 9.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.01m (3.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Discuss this city on our hugely popular New Hampshire forum Back to: Hill, NH, New Hampshire, All US cities.
|
![]() |