![]() |
Bridge Statistics for Hoffman, Illinois (IL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Hoffman, IL, Illinois, Illinois forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 24 Total length: 132 meters (433ft) Total costs: $2,021,000 Total average daily traffic: 987,937 Total average daily truck traffic: 62,198 National Bridge Inventory (NBI) Registered Bridges for Hoffman
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 1605020418, Location: .65 M NW IL 59 (Lat: 42.077619, Lng: -88.201150), Route carried "on" structure: State highway 72, Year Built: 1938, Year Reconstructed: 1979, Status: Open, Structure Length: 4.79m (15.72ft), Average Daily Traffic: 14,750 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 16,808 (year 2021), Design Load: HS 20, Features Intersected: RR - EJ&E Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 141.946, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 68.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16050304181, Location: 1.5 M E IL 59 (Lat: 42.066503, Lng: -88.161428), Route carried "on" structure: State highway 72, Year Built: 1958, Year Reconstructed: 1980, Status: Open, Structure Length: 14.51m (47.60ft), Average Daily Traffic: 14,050 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 15,120 (year 2021), Design Load: HS 20, Features Intersected: I- 90 ADAMS TOLL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.470, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 6 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 57.0m (187.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 37.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2006, Critical Feature Inspection Date: August 2006, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 16052204196, Location: 6 M W IL 53 (Lat: 42.066508, Lng: -88.144575), Route carried "on" structure: Other road 362, Year Built: 1958, Status: Open, Structure Length: 6.64m (21.78ft), Average Daily Traffic: 45,500 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 59,670 (year 2021), Design Load: HS 20, Features Intersected: I- 90 ADAMS TOLL, Facility Carried by Structure: BARRINGTON RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.443, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 20 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 21.3m (69.9ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 68.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 16208724658, Location: .06 M W IL 59 (Lat: 42.045472, Lng: -88.194900), Route carried "on" structure: State highway 58, Year Built: 1977, Year Reconstructed: 2008, Status: Open, Structure Length: 2.93m (9.61ft), Average Daily Traffic: 13,600 (year 2007), Truck Traffic: 11%, Average Future Daily Traffic: 19,440 (year 2021), Design Load: HS 20, Features Intersected: POPLAR CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.937, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 34 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.6m (44.6ft), Curb-To-Curb Width: 17.2m (56.4ft), Out-to-Out Width: 22.6m (74.1ft) Condition: Deck: Critical, Superstructure: Critical, Substructure: Satisfactory, Channel: Good, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.93m (9.61ft), Designated Inspection Frequency: Every 12 months, Inspection Date: June 2007, Bridge Improvement Cost: $511,000, Roadway Improvement Cost: $51,000, Total Project Cost: $767,000 ( Estimate for 2000), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16208824657, Location: .01 M S IL 58 (Lat: 42.045147, Lng: -88.193986), Route carried "on" structure: State highway 59, Year Built: 1977, Status: Open, Structure Length: 1.98m (6.50ft), Average Daily Traffic: 41,600 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 48,330 (year 2021), Design Load: HS 20, Features Intersected: POPLAR CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 60.804, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Skew: 31 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 3.7m (12.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.4m (11.2ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 80.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006 Find on map >>
Structure Number: 1624692927, Location: 1.5 M E IL 59 (Lat: 42.066497, Lng: -88.161822), Route carried "on" structure: State highway 72, Year Built: 1979, Status: Open, Structure Length: 14.51m (47.60ft), Average Daily Traffic: 14,050 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 15,120 (year 2021), Design Load: HS 20, Features Intersected: I- 90 ADAMS TOLL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.502, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 6 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 57.0m (187.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Fair, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 61.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 30.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16250227918, Location: 0.2 M E BARRINGTON (Lat: 42.058214, Lng: -88.140600), Route carried "on" structure: State highway 72, Year Built: 1970, Status: Open, Structure Length: 1.23m (4.04ft), Average Daily Traffic: 31,100 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 30,240 (year 2021), Design Load: HS 20, Features Intersected: POPLAR CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 147.417, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.6m (77.4ft), Skew: 14 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.0m (13.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 61.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007 Find on map >>
Structure Number: 16259930065, Location: 1.5 M N IL 58 (Lat: 42.066478, Lng: -88.192853), Route carried "on" structure: State highway 59, Year Built: 1991, Status: Open, Structure Length: 7.59m (24.90ft), Average Daily Traffic: 30,100 (year 2007), Truck Traffic: 12%, Average Future Daily Traffic: 41,985 (year 2021), Features Intersected: I- 90 ADAMS TOLL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 63.234, Lanes on structure: 6, Lanes under structure: 9, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 45.7m (149.9ft), Skew: 31 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 39.0m (128.0ft), Curb-To-Curb Width: 36.9m (121.1ft), Out-to-Out Width: 45.7m (149.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16264832118, Location: E OF BARRINGTON RD (Lat: 42.088011, Lng: -88.107528), Route carried "on" structure: State highway 62, Year Built: 1997, Status: Open, Structure Length: 2.43m (7.97ft), Average Daily Traffic: 25,500 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 43,200 (year 2021), Design Load: HS 20, Features Intersected: POPLAR CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.462, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.7m (8.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 20.7m (67.9ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 72.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.17m (10.40ft), Designated Inspection Frequency: Every 36 months, Inspection Date: August 2007, Bridge Improvement Cost: $836,000, Roadway Improvement Cost: $84,000, Total Project Cost: $1,254,000, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16276233212, Location: 0.3 M E IL-72 (Lat: 42.066514, Lng: -88.160831), Route carried "on" structure: Interstate 90, Year Built: 1958, Status: Open, Structure Length: 0.81m (2.66ft), Average Daily Traffic: 117,400 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 147,000 (year 2021), Design Load: HS 20, Features Intersected: POPLAR CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 98.777, Lanes on structure: 6, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 36.6m (120.1ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007 Find on map >>
Structure Number: 16276533259, Location: 0.5 W BARRINGTON RD (Lat: 42.046408, Lng: -88.156731), Route carried "on" structure: State highway 58, Year Built: 2002, Status: Open, Structure Length: 4.27m (14.01ft), Average Daily Traffic: 19,600 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 27,000 , Design Load: HS 20, Features Intersected: POPLAR CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.203, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.0m (39.4ft), Skew: 7 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 14.0m (45.9ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 71.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 36 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16301004308, Location: 0.4 M N BODE RD P7 (Lat: 42.044750, Lng: -88.179039), Route carried "on" structure: Other road 2537, Year Built: 1936, Year Reconstructed: 1981, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 12,100 (year 2006), Truck Traffic: 2%, Average Future Daily Traffic: 8,370 (year 2022), Design Load: HS 20, Features Intersected: POPLAR CREEK, Facility Carried by Structure: BARTLETT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.594, Lanes on structure: 4, Owner: County Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.5m (41.0ft), Curb or Sidewalk Widths: Left: 3.4m (11.2ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 29.9m (98.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 30.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16632627564, Location: 1.3 M E BRNGTN RDP22 (Lat: 42.064142, Lng: -88.117900), Route carried "on" structure: City street 4108, Year Built: 1970, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 29 (year 2000), Average Future Daily Traffic: 29 (year 2021), Features Intersected: POPLAR CREEK, Facility Carried by Structure: HASSEL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.625, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 14.9m (48.9ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 33.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006 Find on map >>
Structure Number: 16632727563, Location: 1 M E BARGTN RD P22 (Lat: 42.061686, Lng: -88.125275), Route carried "on" structure: City street 4108, Year Built: 1970, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 29 (year 2000), Average Future Daily Traffic: 1 (year 2021), Features Intersected: POPLAR CREEK, Facility Carried by Structure: HASSEL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.172, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 28.0m (91.9ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 33.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16632827567, Location: 0.3 M E BARGTN RDP2 (Lat: 42.061433, Lng: -88.138164), Route carried "on" structure: City street 4108, Year Built: 1970, Status: Open, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 29 (year 2000), Average Future Daily Traffic: 3,000 , Features Intersected: POPLAR CREEK, Facility Carried by Structure: HASSEL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.298, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 26.5m (86.9ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 33.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: April 2004, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16632927566, Location: 0.25 M S I90 P22 (Lat: 42.063000, Lng: -88.122850), Route carried "on" structure: Other road 2562, Year Built: 1972, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 1,700 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 9,965 (year 2021), Features Intersected: POPLAR CREEK, Facility Carried by Structure: HUNTINGTON BLVD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.402, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 16.8m (55.1ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 29.0m (95.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 33.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16972903756, Location: 0.8 M W ILL 59 P7 (Lat: 42.066469, Lng: -88.205206), Route carried "on" structure: Interstate 90, Year Built: 1958, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 60,100 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 72,555 (year 2021), Features Intersected: EJ&E RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 95.156, Lanes on structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.9m (48.9ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 71.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16973003757, Location: 0.8 M W ILL 59 P7 (Lat: 42.066469, Lng: -88.205056), Route carried "on" structure: Interstate 90, Year Built: 1958, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 60,100 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 72,555 (year 2021), Features Intersected: EJ&E RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 95.172, Lanes on structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.9m (48.9ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 71.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16996804161, Location: 0.7 M E ILL 59 (Lat: 42.066481, Lng: -88.179628), Route carried "on" structure: Other road 2537, Year Built: 1958, Status: Open, Structure Length: 6.77m (22.21ft), Average Daily Traffic: 5,500 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 8,775 (year 2021), Design Load: HS 20, Features Intersected: I 90 (NW TOLL), Facility Carried by Structure: BARTLETT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.165, Lanes on structure: 2, Lanes under structure: 4, Owner: County Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.6m (41.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 16050304181, Location: 1.5 M E IL 59 (Lat: 42.066503, Lng: -88.161428), Route carried "under" structure: Interstate 90, Year Built: 1958, Structure Length: 14.51m (47.60ft), Average Daily Traffic: 117,400 (year 2006), Truck Traffic: 6%, Features Intersected: I- 90 ADAMS TOLL, Facility Carried by Structure: IL 72 WB Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 98.728, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.0m (187.0ft) Find on map >>
Structure Number: 16052204196, Location: 6 M W IL 53 (Lat: 42.066508, Lng: -88.144575), Route carried "under" structure: Interstate 90, Year Built: 1958, Structure Length: 6.64m (21.78ft), Average Daily Traffic: 70,200 (year 2006), Truck Traffic: 6%, Features Intersected: I- 90 ADAMS TOLL, Facility Carried by Structure: BARRINGTON RD Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 100.096, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.1m (65.9ft) Find on map >>
Structure Number: 1624692927, Location: 1.5 M E IL 59 (Lat: 42.066497, Lng: -88.161822), Route carried "under" structure: Interstate 90, Year Built: 1979, Structure Length: 14.51m (47.60ft), Average Daily Traffic: 117,400 (year 2006), Truck Traffic: 6%, Features Intersected: I- 90 ADAMS TOLL, Facility Carried by Structure: IL 72 EB Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 98.696, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.0m (187.0ft) Find on map >>
Structure Number: 16259930065, Location: 1.5 M N IL 58 (Lat: 42.066478, Lng: -88.192853), Route carried "under" structure: Interstate 90, Year Built: 1991, Structure Length: 7.59m (24.90ft), Average Daily Traffic: 117,400 (year 2006), Truck Traffic: 6%, Features Intersected: I- 90 ADAMS TOLL, Facility Carried by Structure: IL 59 (SUTTON RD) Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 96.073, Lanes on structure: 6, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft) Find on map >>
Structure Number: 16996804161, Location: 0.7 M E ILL 59 (Lat: 42.066481, Lng: -88.179628), Route carried "under" structure: Interstate 90, Year Built: 1958, Structure Length: 6.77m (22.21ft), Average Daily Traffic: 58,700 (year 2006), Truck Traffic: 6%, Features Intersected: I 90 (NW TOLL), Facility Carried by Structure: BARTLETT RD Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 0.972, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.1m (65.9ft) Discuss this city on our hugely popular Illinois forum Back to: Hoffman, IL, Illinois, All US cities.
|
![]() |