Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Holcomb, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 253ft / 76.8mTotal length
  • $4,022,538,000Total costs
  • 25,800Total average daily traffic
  • 3,037Total average daily truck traffic
  • 28,550Total future (year 2035) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Holcomb
  • No street view available for this location

New bridges in Holcomb, MS - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 51950-1959
  • 31970-1979
  • 21980-1989
  • 31990-1999
Average Bridge Daily Traffic in Holcomb, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 50.0%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 33.3%Good
  • 41.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 58.3%Good
  • 8.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 31000070220574,  Location: 7.0 MI N CARROLL CL (Lat: 33.755258,  Lng: -89.997292),  Route carried "on" structure: State highway 7,  Year Built: 1948,  Status: Posted for load,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,600 (year 2040),  Design Load: HS 15,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.207,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.77m (41.90ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $120,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31000070220618,  Location: 11.3 MI N CARROLL CL (Lat: 33.773864,  Lng: -89.926608),  Route carried "on" structure: State highway 7,  Year Built: 1951,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,100 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,800 (year 2040),  Design Load: HS 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.514,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $10,000,000,  Roadway Improvement Cost: $8,000,000,  Total Project Cost: $22,000,000
Find on map >>   Show street view

Structure Number: 31000070220625,  Location: 12.1 MI N CARROLL CL (Lat: 33.778394,  Lng: -89.914994),  Route carried "on" structure: State highway 7,  Year Built: 1951,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 7,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,700 (year 2040),  Design Load: HS 15,  Features Intersected: TURNBULL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.702,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 41.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $392,000,000,  Roadway Improvement Cost: $39,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31000080220641,  Location: 1.6 MI N SR 7 (Lat: 33.777161,  Lng: -90.000678),  Route carried "on" structure: State highway 8,  Year Built: 1953,  Status: Open,  Structure Length: 15.54m (50.98ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 15,  Features Intersected: YALOBUSHA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.028,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.36m (63.52ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $185,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000080220649,  Location: 1.2 MI N SR 7 (Lat: 33.774636,  Lng: -89.993717),  Route carried "on" structure: State highway 8,  Year Built: 1955,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 15,  Features Intersected: YALOBUSHA RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.731,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.08m (23.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $649,000,000,  Roadway Improvement Cost: $65,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31000350222184,  Location: 1.6 MI S SR 8 (Lat: 33.734147,  Lng: -89.969872),  Route carried "on" structure: State highway 35,  Year Built: 1976,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.912,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.5m (34.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000350222327,  Location: 1.0 MI S TALLAHATCHIE CL (Lat: 33.792742,  Lng: -90.039383),  Route carried "on" structure: State highway 35,  Year Built: 1956,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: H 15,  Features Intersected: HARPER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.486,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 3,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: SA2200000000002,  Location: SEC 9 T21N R 3E B (Lat: 33.702194,  Lng: -89.995806),  Route carried "on" structure: County highway 1737,  Year Built: 1982,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 180 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 270 (year 2035),  Design Load: HS 15,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.115,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000016,  Location: SEC 2 T22N R 3E (Lat: 33.802750,  Lng: -89.959028),  Route carried "on" structure: County highway 58,  Year Built: 1998,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 30 (year 2015),  Average Future Daily Traffic: 45 (year 2035),  Design Load: HS 20,  Features Intersected: LONG CREEK,  Facility Carried by Structure: TURKEY FOOT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000017,  Location: SEC 2 T22N R 3E B (Lat: 33.805833,  Lng: -89.958333),  Route carried "on" structure: County highway 184,  Year Built: 1997,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 150 (year 2035),  Design Load: HS 20,  Features Intersected: RATTLE SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.081,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000018,  Location: SEC 28 T22N R 3E B (Lat: 33.741306,  Lng: -89.980861),  Route carried "on" structure: County highway 108,  Year Built: 1971,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 180 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 270 (year 2035),  Design Load: HS 15,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000019,  Location: SEC 31 T22N R 3E (Lat: 33.733500,  Lng: -90.030778),  Route carried "on" structure: County highway 11,  Year Built: 1992,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 30 (year 2015),  Average Future Daily Traffic: 45 (year 2035),  Design Load: H 15,  Features Intersected: RELIEF DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 32.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $126,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000053,  Location: SEC 34 T23N R 3E B (Lat: 33.812444,  Lng: -89.970000),  Route carried "on" structure: County highway 184,  Year Built: 1975,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 150 (year 2035),  Design Load: H 15,  Features Intersected: LONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $314,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6800000000032,  Location: SEC 28 T23N R 3E (Lat: 33.826083,  Lng: -89.986639),  Route carried "on" structure: County highway 319,  Year Built: 1981,  Status: Posted for load,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 120 (year 2035),  Design Load: H 15,  Features Intersected: RATTLESNAKE CREEK,  Facility Carried by Structure: LONG CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.3m (17.4ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $73,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $102,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels
Discuss Holcomb, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.