National Bridge Inventory (NBI) Statistics
Number of bridges: 19
Total length: 91 meters (299ft)
Total costs: $29,449,000
Total average daily traffic: 153,470
Total average daily truck traffic: 18,194
Total future (year 2027) average daily traffic: 242,375
National Bridge Inventory (NBI) Registered Bridges for Holden

New bridges - Historical Statistics

  • 1900-1909: 2
  • 1910-1919: 0
  • 1920-1929: 1
  • 1930-1939: 2
  • 1940-1949: 2
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 5
  • 1980-1989: 3
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: H18002223MHD634,  Location: .5 MI W OF ST 122A (Lat: 42.347697,  Lng: -71.865356),  Route carried "on" structure: State highway 31,  Year Built: 1983,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 16,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,427 (year 2028),  Design Load: HS 20,  Features Intersected: RR PWRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.054,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $83,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $125,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H18003224MHD634,  Location: .3 MI N OF JCT RTE 31 (Lat: 42.352500,  Lng: -71.871667),  Route carried "on" structure: Alternate State highway 122A,  Year Built: 1900,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 11,000 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,372 (year 2027),  Design Load: H 20,  Features Intersected: RR PWRR,  Facility Carried by Structure: ST122 A/MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.146,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $851,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H18004225MHD634,  Location: 400 FT SOUTH OF RTE 122-A (Lat: 42.342450,  Lng: -71.852208),  Route carried "on" structure: State highway ,  Year Built: 1907,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 4,300 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,791 (year 2027),  Features Intersected: RR PWRR,  Facility Carried by Structure: HWY SALISBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.377,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $991,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H18008209MHDNBI,  Location: 0.3 MI S MANNING ST-HOLDN (Lat: 42.381389,  Lng: -71.852500),  Route carried "on" structure: State highway 31,  Year Built: 1922,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 15,500 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,479 (year 2027),  Design Load: H 20,  Features Intersected: WATER QUINAPOXET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.477,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2008,  Underwater Inspection Date: May 2005,  Other Special Inspection Date: March 2008,  Bridge Improvement Cost: $674,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,012,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H180091BXMUNNBI,  Location: 1 MI W OF W BOYLSTON LINE (Lat: 42.383414,  Lng: -71.837889),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,600 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,423 (year 2027),  Design Load: H 20,  Features Intersected: WATER TROUT BROOK,  Facility Carried by Structure: HWY MANNING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H180101FTMUNNBI,  Location: 0.7 MI. S. RT. 31 (Lat: 42.373186,  Lng: -71.853669),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2028),  Design Load: H 20,  Features Intersected: WATER ASNEBUMSKIT RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $629,000 ( Estimate for 2006)
Find on map >>

Structure Number: H180111FUMUNNBI,  Location: 0.1 MI. W. RT. 31 (Lat: 42.380531,  Lng: -71.856633),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 150 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 237 (year 2028),  Features Intersected: WATER QUINAPOXET RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Other Special Inspection Date: August 2007,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,081,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H180121FVMUNNBI,  Location: 0.4 MI. N. OF RTE 122A (Lat: 42.365294,  Lng: -71.882683),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,450 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,290 (year 2028),  Design Load: H 20,  Features Intersected: WATER ASNEBUMSKIT BROOK,  Facility Carried by Structure: HWY PRINCETON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $316,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H18013ACKMUNNBI,  Location: .1 MI N OF RESERVOIR ST (Lat: 42.296667,  Lng: -71.866667),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 150 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 237 (year 2028),  Design Load: HS 20,  Features Intersected: WATER RESERVOIR OUT,  Facility Carried by Structure: HWY STONEHSE HLL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $667,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H180141BYMUNNBI,  Location: .3 MI E OF RTE 122A (Lat: 42.364606,  Lng: -71.882961),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,600 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,106 (year 2027),  Design Load: H 20,  Features Intersected: WATER ASNEBUMSKIT BROOK,  Facility Carried by Structure: HWY MT PLSANT AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $196,000 ( Estimate for 2006)
Find on map >>

Structure Number: H180151YPMHDNBI,  Location: .5 MILES SOUTH OF ST-68 (Lat: 42.360908,  Lng: -71.884800),  Route carried "on" structure: Alternate State highway 122A,  Year Built: 1948,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 16,380 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,869 (year 2028),  Design Load: H 20,  Features Intersected: WATER ASNEBUMSKIT BROOK,  Facility Carried by Structure: ST122 A/MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.683,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $509,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H18016ATGMUNNBI,  Location: .19 MI EAST OF RTE 31 (Lat: 42.367489,  Lng: -71.842461),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 2.55m (8.37ft),  Average Daily Traffic: 400 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 632 (year 2027),  Design Load: HS 20,  Features Intersected: WATER QUINAPOXET RIVER,  Facility Carried by Structure: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.3m (76.4ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H180201FYMUNNBI,  Location: 1.0 MI. W. OF RT. 190 (Lat: 42.373103,  Lng: -71.827883),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 2,840 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,485 (year 2027),  Design Load: H 15,  Features Intersected: WATER QUINAPOXET RIVER,  Facility Carried by Structure: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2006,  Other Special Inspection Date: October 2007,  Bridge Improvement Cost: $1,356,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $2,035,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H180221G0MUNNBI,  Location: 0.2 M. S OF ELMWOOD AVE (Lat: 42.387539,  Lng: -71.879800),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 400 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 632 (year 2028),  Features Intersected: WATER QUINAPXT RES OTLT,  Facility Carried by Structure: HWY PRINCETON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.476,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Superstructure: Poor,  Substructure: Serious,  Channel: Good,  Inventory Rating: 78.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2007,  Other Special Inspection Date: January 2008,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $479,000 ( Estimate for 2006)
Find on map >>

Structure Number: H180271VJMHDNBI,  Location: 1.7MI. S OF W BOYLSTN T/L (Lat: 42.359614,  Lng: -71.813308),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 790 (year 2028),  Design Load: HS 20,  Features Intersected: I 190,  Facility Carried by Structure: HWY MALDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.50m (31.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $977,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,466,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H180281VKMHDNBI,  Location: 3.5 MI.NTH.OF WORC.CTY.LN (Lat: 42.380131,  Lng: -71.818189),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 26,000 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 41,062 (year 2027),  Design Load: HS 20,  Features Intersected: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.975,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $127,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H180281VLMHDNBI,  Location: 3.5 MI.NTH.OF WORC.CTY.LN (Lat: 42.380325,  Lng: -71.817931),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 13,000 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 20,531 (year 2027),  Design Load: HS 20,  Features Intersected: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.975,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $131,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H180291VMMHDNBI,  Location: 300 FEET NO OF RIVER ST (Lat: 42.382922,  Lng: -71.818153),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 25.42m (83.40ft),  Average Daily Traffic: 18,000 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 28,427 (year 2027),  Design Load: HS 20,  Features Intersected: WATER QUINAPOXET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.040,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.50m (83.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $6,100,000,  Roadway Improvement Cost: $611,000,  Total Project Cost: $9,151,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H180291VNMHDNBI,  Location: 300 FT NORTH OF RIVER ST (Lat: 42.382950,  Lng: -71.817897),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 25.42m (83.40ft),  Average Daily Traffic: 18,000 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 28,427 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: WATER QUINAPOXET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.040,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.50m (83.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $6,236,000,  Roadway Improvement Cost: $624,000,  Total Project Cost: $9,355,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up

Discuss this city on our hugely popular Massachusetts forum

Back to: Holden, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.