  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 308ft / 93.7mTotal length
  • $35,450,000Total costs
  • 349,408Total average daily traffic
  • 4,715Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Holly Springs
  • No street view available for this location

New bridges in Holly Springs, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 31950-1959
  • 31960-1969
  • 31970-1979
  • 61980-1989
  • 81990-1999
  • 22000-2009
  • 12020-2022
Reconstructed bridges in Holly Springs, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Holly Springs, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.3%Very good
  • 68.8%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Very good
  • 56.3%Good
  • 25.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 68.8%Good
  • 18.8%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Excellent
  • 34.8%Very good
  • 47.8%Good
  • 13.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Very good
  • 91.7%Good
Find on map >>   Show street view

Structure Number: 570001,  Location: 1.8 MI NE OF WOODSTOCK (Lat: 34.122389,  Lng: -84.504289),  Route carried "on" structure: City street 9018,  Year Built: 1947,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 13,600 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,400 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: MAIN STREET (M-901
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.31m (53.51ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 36 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,262,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,893,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 570003,  Location: 1.7 MI S OF HOLLY SPRINGS (Lat: 34.149778,  Lng: -84.510947),  Route carried "on" structure: County highway 2556,  Year Built: 1932,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,060 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,090 (year 2031),  Design Load: H 15,  Features Intersected: TOONIGH CREEK,  Facility Carried by Structure: OLD HIGHWAY 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 570004,  Location: @ N HOLLY SPRINGS CL. (Lat: 34.189239,  Lng: -84.505731),  Route carried "on" structure: County highway 2556,  Year Built: 1982,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 16,860 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,290 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 417 (I-575)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 56.1m (184.1ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,479,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $3,719,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 570028,  Location: 7 MI SE OF CANTON (Lat: 34.159847,  Lng: -84.408797),  Route carried "on" structure: State highway 140,  Year Built: 1976,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 12,290 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,435 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.015,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 570038,  Location: 1.5 MI S OF HOLLY SPRGS (Lat: 34.155519,  Lng: -84.511928),  Route carried "on" structure: County highway 404,  Year Built: 1982,  Status: Open,  Structure Length: 10.55m (34.61ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 417 (I-575),  Facility Carried by Structure: RABBIT HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 53.6m (175.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,352,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,028,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 570039,  Location: AT W HOLLY SPRINGS CL (Lat: 34.174608,  Lng: -84.512439),  Route carried "on" structure: City street 405,  Year Built: 1982,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 4,030 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,045 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 417 (I-575),  Facility Carried by Structure: HOLLY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 59.1m (193.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,348,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,022,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 570063,  Location: AT W HOLLY SPRINGS CL (Lat: 34.170319,  Lng: -84.513008),  Route carried "on" structure: City street 593,  Year Built: 1981,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 1,540 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,310 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 417 (I-575),  Facility Carried by Structure: MARBLE QUARRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,188,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,782,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 570068,  Location: 3.5 MI SE OF HOLLY SPRING (Lat: 34.143278,  Lng: -84.451039),  Route carried "on" structure: County highway 1018,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 9,360 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,040 (year 2031),  Design Load: H 15,  Features Intersected: AVERY CREEK,  Facility Carried by Structure: E. CHEROKEE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 570081,  Location: 2 MI S OF HOLLY SPRINGS (Lat: 34.149108,  Lng: -84.514928),  Route carried "on" structure: Interstate 575,  Year Built: 1983,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 58,280 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 87,420 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOONIGH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $355,000
Find on map >>   Show street view

Structure Number: 575024,  Location: 4 MI SE OF CANTON (Lat: 34.217939,  Lng: -84.417728),  Route carried "on" structure: County highway 281,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Features Intersected: CANTON CREEK,  Facility Carried by Structure: EPPERSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 41.24m (135.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 575027,  Location: 5 MI E OF HOLLY SPRINGS (Lat: 34.179650,  Lng: -84.404058),  Route carried "on" structure: County highway 295,  Year Built: 1976,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,910 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,365 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: L. UNION HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 575029,  Location: 6 MI E OF HOLLY SPRINGS (Lat: 34.169808,  Lng: -84.398700),  Route carried "on" structure: County highway 301,  Year Built: 1990,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: LOWER BIRMINGHAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $322,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 575034,  Location: 4 MI SE OF HOLLY SPRINGS (Lat: 34.137178,  Lng: -84.453128),  Route carried "on" structure: County highway 370,  Year Built: 1984,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: TRIPP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 575035,  Location: 5 MI SE OF HOLLY SPRINGS (Lat: 34.139697,  Lng: -84.430889),  Route carried "on" structure: County highway 372,  Year Built: 1961,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,040 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,560 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: WATERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 41.45m (135.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 575036,  Location: 5 MI SE OF HOLLY SPRINGS (Lat: 34.139228,  Lng: -84.423550),  Route carried "on" structure: County highway 375,  Year Built: 1961,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 450 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 675 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: VAUGHN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 41.39m (135.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $223,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 575043,  Location: 5 MI EAST OF CANTON (Lat: 34.222028,  Lng: -84.405128),  Route carried "on" structure: County highway 762,  Year Built: 1950,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 3,370 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,055 (year 2031),  Design Load: H 15,  Features Intersected: CANTON CREEK,  Facility Carried by Structure: U. UNION HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.66m (28.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $422,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 575061,  Location: 3 MI E OF HOLLY SPRINGS (Lat: 34.167939,  Lng: -84.449869),  Route carried "on" structure: County highway 778,  Year Built: 1991,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 9,540 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,310 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: AVERY CREEK,  Facility Carried by Structure: HICKORY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 575062,  Location: 3.8 MI E OF HOLLY SPRINGS (Lat: 34.166469,  Lng: -84.436097),  Route carried "on" structure: County highway 778,  Year Built: 1991,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 9,540 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,310 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: AVERY CREEK TRIB,  Facility Carried by Structure: HICKORY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 575065,  Location: IN SE HOLLY SPRINGS (Lat: 34.160600,  Lng: -84.485528),  Route carried "on" structure: County highway 832,  Year Built: 1991,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: TOONIGH CREEK,  Facility Carried by Structure: BRADSHAW LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 57507,  Location: 6 MI. E OF HOLLY SPRINGS (Lat: 34.166108,  Lng: -84.401700),  Route carried "on" structure: County highway 298,  Year Built: 1998,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: BATESVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 575072,  Location: 2 MI SW OF HOLLY SPRINGS (Lat: 34.150639,  Lng: -84.519597),  Route carried "on" structure: County highway 779,  Year Built: 1998,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 12,340 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,510 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOONIGH CREEK,  Facility Carried by Structure: SIXES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $507,000
Find on map >>   Show street view

Structure Number: 575073,  Location: 3 MI N OF WOODSTOCK (Lat: 34.145178,  Lng: -84.528458),  Route carried "on" structure: County highway 1999,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 10,  Features Intersected: TOONIGH CREEK,  Facility Carried by Structure: TRANSART PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 575079,  Location: 2 MI. NE OF WOOSSTOCK (Lat: 34.123489,  Lng: -84.492728),  Route carried "on" structure: County highway 362,  Year Built: 1999,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 5,600 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,400 (year 2031),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,618,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 57508,  Location: 4 MI SE OF CANTON (Lat: 34.209539,  Lng: -84.430828),  Route carried "on" structure: County highway 776,  Year Built: 2000,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: CANTON CREEK TRIB,  Facility Carried by Structure: AVERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $147,000
Find on map >>   Show street view

Structure Number: 575082,  Location: 2 MI S OF HOLLY SPRINGS (Lat: 34.142569,  Lng: -84.509739),  Route carried "on" structure: County highway 2556,  Year Built: 1998,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 15,040 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,560 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GEORGIA NORTHEASTERN RR,  Facility Carried by Structure: OLD HIGHWAY 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $996,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 57509,  Location: 3.8 MI E OF HOLLY SPRINGS (Lat: 34.163639,  Lng: -84.435850),  Route carried "on" structure: County highway 1933,  Year Built: 2003,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: AVERY CREEK TRIB,  Facility Carried by Structure: HICKORY FAIRWAY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 575103,  Location: 1.7 MI S OF HOLLY SPRINGS (Lat: 34.150900,  Lng: -84.506811),  Route carried "on" structure: County highway 351,  Year Built: 1960,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: H 10,  Features Intersected: TOONIGH CREEK,  Facility Carried by Structure: PALM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,776,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $2,664,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 575112,  Location: 6 MI EAST OR CANTON (Lat: 34.202219,  Lng: -84.387928),  Route carried "on" structure: County highway 762,  Year Built: 2021,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 4,014 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,619 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: U. UNION HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $8,969,000,  Roadway Improvement Cost: $897,000,  Total Project Cost: $13,453,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 570004,  Location: @ N HOLLY SPRINGS CL. (Lat: 34.189239,  Lng: -84.505731),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 34,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: FAS 2556 ( OLD SR 5 ),  Facility Carried by Structure: S-2556 (OLD SR 5)
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 24.140,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570038,  Location: 1.5 MI S OF HOLLY SPRGS (Lat: 34.155519,  Lng: -84.511928),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 404 RABBIT HILL ROAD,  Facility Carried by Structure: RABBIT HILL ROAD
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570039,  Location: AT W HOLLY SPRINGS CL (Lat: 34.174608,  Lng: -84.512439),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 405 HOLLY STREET,  Facility Carried by Structure: HOLLY STREET
Minimum Vertical Clearance: 8.68m (28.48ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570063,  Location: AT W HOLLY SPRINGS CL (Lat: 34.170319,  Lng: -84.513008),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 1999),  Truck Traffic: 1%,  Features Intersected: CS 593 MARBLE QUARRY RD,  Facility Carried by Structure: MARBLE QUARRY RD
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Holly Springs, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.