U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Holyoke, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Holyoke, MA, Massachusetts, Massachusetts forum, All US cities.





Parts: 1, 2


National Bridge Inventory (NBI) Statistics
Number of bridges: 49
Total length: 336 meters (1,102ft)
Total costs: $72,007,000
Total average daily traffic: 1,393,347
Total average daily truck traffic: 72,521
Total future (year 2027) average daily traffic: 2,246,710
National Bridge Inventory (NBI) Registered Bridges for Holyoke

New bridges - Historical Statistics

  • Before 1900: 8
  • 1900-1909: 1
  • 1910-1919: 1
  • 1920-1929: 5
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 3
  • 1960-1969: 26
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 2
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 12
  • 1990-1999: 3

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: H21001AA5MHDNBI,  Location: SOUTH HADLEY FALLS (Lat: 42.211703,  Lng: -72.596289),  Route carried "on" structure: State highway 116,  Year Built: 1990,  Status: Open,  Structure Length: 49.77m (163.29ft),  Average Daily Traffic: 6,300 (year 1997),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,950 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: COMB CONN RIVER & PVRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.288,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 53.6m (175.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 49.80m (163.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,645,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $2,468,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H21008124MHDNBI,  Location: AT JCT S CANAL ST. (Lat: 42.196744,  Lng: -72.603656),  Route carried "on" structure: State highway 116,  Year Built: 1894,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 10,086 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,929 (year 2027),  Features Intersected: WATER THIRD LEVEL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.587,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,618,000 ( Estimate for 2006)
Find on map >>

Structure Number: H21010132MHDNBI,  Location: N OF SOUTH ST. (Lat: 42.194058,  Lng: -72.613475),  Route carried "on" structure: City street ,  Year Built: 1902,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 13,060 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,626 (year 2027),  Design Load: H 20,  Features Intersected: WATER THIRD LEVEL CANAL,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,029,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,544,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H21011AH9MUNNBI,  Location: .3 MI NW OF 3RD CANAL (Lat: 42.196111,  Lng: -72.612500),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 2,809 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,436 (year 2027),  Design Load: HS 20,  Features Intersected: WATER SECOND LEVEL CANAL,  Facility Carried by Structure: HWY JACKSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $280,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H210120LUMUNNBI,  Location: .31 MI NW OF 3RD CANAL (Lat: 42.198289,  Lng: -72.611231),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1925,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 6,000 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,476 (year 2028),  Features Intersected: WATER SECOND LEVEL CANAL,  Facility Carried by Structure: HWY SARGEANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 13.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,618,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H210130LVMUNNBI,  Location: .4 MI NW OF 3RD CANAL (Lat: 42.200472,  Lng: -72.608925),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1924,  Status: Posted for load,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 3,491 (year 2001),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,513 (year 2028),  Features Intersected: WATER SECOND LEVEL CANAL,  Facility Carried by Structure: HWY CABOT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,176,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,765,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H21014130MHDNBI,  Location: N OF RACE ST. (Lat: 42.202639,  Lng: -72.606625),  Route carried "on" structure: State highway 141,  Year Built: 1921,  Status: Posted for load,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 4,526 (year 2002),  Average Future Daily Traffic: 7,148 (year 2027),  Features Intersected: WATER SECOND LEVEL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.115,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2006,  Other Special Inspection Date: September 2007,  Bridge Improvement Cost: $2,228,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $3,343,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H210150M1MUNNBI,  Location: JUST SE OF 1ST CANAL (Lat: 42.204814,  Lng: -72.604342),  Route carried "on" structure: City street ,  Year Built: 1889,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 4,762 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,521 (year 2028),  Design Load: HS 20,  Features Intersected: WATER SECOND LEVEL CANAL,  Facility Carried by Structure: HWY DWIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $310,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H21016125MHDNBI,  Location: AT JCT RACE ST. (Lat: 42.206944,  Lng: -72.601389),  Route carried "on" structure: City street ,  Year Built: 1922,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 7,200 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,371 (year 2028),  Features Intersected: WATER SECOND LEVEL CANAL,  Facility Carried by Structure: HWY LYMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Other Special Inspection Date: September 2007,  Bridge Improvement Cost: $2,519,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $3,779,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: H210170VGMHDNBI,  Location: .1 M S CONN RIVER (Lat: 42.208889,  Lng: -72.596944),  Route carried "on" structure: State highway 116,  Year Built: 1990,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 6,300 (year 1997),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,950 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: WATER SECOND LEVEL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.806,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H21018126MHDNBI,  Location: AT JCT E COURT ST. (Lat: 42.207789,  Lng: -72.603486),  Route carried "on" structure: City street ,  Year Built: 1921,  Status: Posted for load,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 7,200 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,371 (year 2027),  Design Load: H 20,  Features Intersected: WATER FIRST LEVEL CANAL,  Facility Carried by Structure: HWY LYMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2006,  Other Special Inspection Date: March 2008,  Bridge Improvement Cost: $3,197,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $4,796,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H210190M0MUNNBI,  Location: JUST NW OF 2ND CANAL (Lat: 42.205561,  Lng: -72.605722),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 5,948 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,394 (year 2028),  Design Load: HS 20,  Features Intersected: WATER FIRST LEVEL CANAL,  Facility Carried by Structure: HWY DWIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $476,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H21020131MHDNBI,  Location: N OF BIGELOW ST. (Lat: 42.203353,  Lng: -72.607906),  Route carried "on" structure: State highway 141,  Year Built: 1919,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,526 (year 2002),  Average Future Daily Traffic: 7,148 (year 2028),  Design Load: H 20,  Features Intersected: WATER FIRST LEVEL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.954,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Other Special Inspection Date: September 2007,  Bridge Improvement Cost: $2,124,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $3,187,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H210210LWMUNNBI,  Location: .5 MI NW OF 3RD CANAL (Lat: 42.201156,  Lng: -72.610181),  Route carried "on" structure: City street ,  Year Built: 1924,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 8,500 (year 1997),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,424 (year 2028),  Design Load: HS 20,  Features Intersected: WATER FIRST LEVEL CANAL,  Facility Carried by Structure: HWY CABOT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.143,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Other Special Inspection Date: October 2005,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $271,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210220LYMUNNBI,  Location: .4 MI NW OF 3RD CANAL (Lat: 42.199167,  Lng: -72.611944),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 7,020 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,087 (year 2027),  Design Load: HS 20,  Features Intersected: WATER FIRST LEVEL CANAL,  Facility Carried by Structure: HWY SARGEANT ST
Minimum Vertical Clearance: 3.45m (11.32ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $119,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $179,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: H21024146MHD634,  Location: 0.2 MI W OF US 5 (Lat: 42.172044,  Lng: -72.635603),  Route carried "on" structure: City street ,  Year Built: 1923,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,267 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,739 (year 2028),  Design Load: H 15,  Features Intersected: RR PVRR,  Facility Carried by Structure: HWY LWR WESTFLD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 29.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $96,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $145,000 ( Estimate for 2006),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: H210250U8MHDNBI,  Location: .3 M N JCT PELTIAH ST. (Lat: 42.180806,  Lng: -72.631589),  Route carried "on" structure: US 5,  Year Built: 1970,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 15,400 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,321 (year 2028),  Design Load: HS 20,  Features Intersected: RR PVRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.116,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,022,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,534,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H21026147MHD634,  Location: .2 M W JCT MAIN ST. (Lat: 42.195153,  Lng: -72.617314),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,590 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,090 (year 2027),  Design Load: H 20,  Features Intersected: RR PVRR,  Facility Carried by Structure: HWY SOUTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $71,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $107,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210350VPMHDNBI,  Location: JCT US 202 & CONN RIVER (Lat: 42.216156,  Lng: -72.608419),  Route carried "on" structure: US 202,  Year Built: 1958,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 44.01m (144.39ft),  Average Daily Traffic: 21,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,165 (year 2027),  Design Load: HS 20,  Features Intersected: WATER CONNECTICUT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.408,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 77.1m (253.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2006,  Underwater Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H210380VRMHDNBI,  Location: .1 M S BR # H-21-35 (Lat: 42.212900,  Lng: -72.612875),  Route carried "on" structure: US 202,  Year Built: 1958,  Status: Temporarily open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 21,207 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,492 (year 2028),  Design Load: HS 20,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.209,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2007,  Other Special Inspection Date: January 2008,  Bridge Improvement Cost: $2,516,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $3,775,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: H210390VQMHDNBI,  Location: JCT LYMAN ST. (Lat: 42.212669,  Lng: -72.610944),  Route carried "on" structure: US 202,  Year Built: 1958,  Status: Temporarily open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 10,500 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,583 (year 2028),  Design Load: HS 20,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.209,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2007,  Other Special Inspection Date: January 2008,  Bridge Improvement Cost: $1,553,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $2,330,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: H210400YTMHDNBI,  Location: 8.1 M N W SPRNGFLD T.L. (Lat: 42.273906,  Lng: -72.606875),  Route carried "on" structure: Interstate 91,  Year Built: 1964,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 63,800 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 100,759 (year 2028),  Design Load: HS 20,  Features Intersected: HWY GOLF COURSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.961,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $65,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H210400YUMHDNBI,  Location: 8.1 M N W SPRNGFLD T.L. (Lat: 42.273908,  Lng: -72.606617),  Route carried "on" structure: Interstate 91,  Year Built: 1964,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 31,900 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 50,380 (year 2028),  Design Load: HS 20,  Features Intersected: HWY GOLF COURSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.953,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $65,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H210410YQMHDNBI,  Location: 7.4 M N W SPRNGFLD T.L. (Lat: 42.266083,  Lng: -72.612797),  Route carried "on" structure: Interstate 91,  Year Built: 1964,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 26,900 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 42,483 (year 2027),  Design Load: HS 20,  Features Intersected: HWY RESERVATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.899,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $65,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210410YRMHDNBI,  Location: 7.4 M N W SPRNGFLD T.L. (Lat: 42.266236,  Lng: -72.612967),  Route carried "on" structure: Interstate 91,  Year Built: 1964,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 52,000 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 82,124 (year 2027),  Design Load: HS 20,  Features Intersected: HWY RESERVATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.899,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $65,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H2104213EMHDNBI,  Location: 0.5 MI W OF US 5 (Lat: 42.241219,  Lng: -72.630364),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2029),  Design Load: HS 20,  Features Intersected: I 91,  Facility Carried by Structure: HWY MTN PARK ACC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,402,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210460Y7MHDNBI,  Location: .65 M N W SPRNGFLD T.L. (Lat: 42.170997,  Lng: -72.644686),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 32,950 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 52,038 (year 2028),  Design Load: HS 20,  Features Intersected: RR PVRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.633,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $242,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210460Y8MHDNBI,  Location: .65 M N W SPRNGFLD T.L. (Lat: 42.170994,  Lng: -72.644944),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 59,000 (year 2000),  Truck Traffic: 5%,  Average Future Daily Traffic: 93,179 (year 2028),  Design Load: HS 20,  Features Intersected: RR PVRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.633,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $242,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210470Y9MHDNBI,  Location: .85 M N W SPRNGFLD T.L. (Lat: 42.174286,  Lng: -72.644564),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 59,000 (year 2000),  Truck Traffic: 5%,  Average Future Daily Traffic: 93,179 (year 2028),  Design Load: HS 20,  Features Intersected: HWY LWR WESTFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.971,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $805,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,208,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210470YAMHDNBI,  Location: .85 M N W SPRNGFLD T.L. (Lat: 42.174294,  Lng: -72.644822),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 32,950 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 52,038 (year 2028),  Design Load: HS 20,  Features Intersected: HWY LWR WESTFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.971,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $805,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,208,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210480YBMHDNBI,  Location: 2.1 M N W SPRNGFLD T.L. (Lat: 42.191281,  Lng: -72.638894),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 50,000 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 78,965 (year 2027),  Design Load: HS 20,  Features Intersected: HWY WESTFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.886,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,729,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $2,594,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210480YCMHDNBI,  Location: 2.1 M N W SPRNGFLD T.L. (Lat: 42.191164,  Lng: -72.639169),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 34,600 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,644 (year 2027),  Design Load: HS 20,  Features Intersected: HWY WESTFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.886,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,342,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,014,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210490YDMHDNBI,  Location: 2.6 M N W SPRNGFLD T.L. (Lat: 42.199900,  Lng: -72.639197),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 30,250 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 93,968 (year 2027),  Design Load: HS 20,  Features Intersected: US202 CHERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.852,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,439,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,159,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210490YEMHDNBI,  Location: 2.6 M N W SPRNGFLD T.L. (Lat: 42.200133,  Lng: -72.639475),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 53,300 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 84,177 (year 2027),  Design Load: HS 20,  Features Intersected: US202 CHERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.852,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,561,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $2,342,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210510YFMHDNBI,  Location: 4.8 K N W SPRNGFLD T.L. (Lat: 42.204858,  Lng: -72.639469),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 63,800 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 100,759 (year 2028),  Design Load: HS 20,  Features Intersected: HWY PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.496,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $298,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H210510YGMHDNBI,  Location: 3.0 M N W SPRINGFLD T.L. (Lat: 42.205011,  Lng: -72.639683),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 63,800 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 100,759 (year 2028),  Design Load: HS 20,  Features Intersected: HWY PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.496,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $194,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: H210520YJMHDNBI,  Location: 3.3 M N W SPRNGFLD T.L. (Lat: 42.211100,  Lng: -72.634606),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 63,800 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 100,759 (year 2028),  Design Load: HS 20,  Features Intersected: ST141 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.300,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $991,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210520YKMHDNBI,  Location: 3.3 M N W SPRNGFLD T.L. (Lat: 42.211300,  Lng: -72.634764),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 63,800 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 100,759 (year 2028),  Design Load: HS 20,  Features Intersected: ST141 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.300,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $991,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: H210530YLMHDNBI,  Location: 3.3 M N W SPRNGFLD T.L. (Lat: 42.212819,  Lng: -72.633742),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 71,900 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 113,552 (year 2028),  Design Load: HS 20,  Features Intersected: ST141 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.494,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.3m (86.3ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $214,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: H210530YMMHDNBI,  Location: 3.3 M N W SPRNGFLD T.L. (Lat: 42.212889,  Lng: -72.633986),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 71,900 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 113,552 (year 2028),  Design Load: HS 20,  Features Intersected: ST141 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.494,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.3m (86.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 75.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $109,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing

Parts: 1, 2

Discuss this city on our hugely popular Massachusetts forum

Back to: Holyoke, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.