U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Homer, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Homer, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 19
Total length: 61 meters (200ft)
Total costs: $16,469,000
Total average daily traffic: 97,721
Total average daily truck traffic: 19,339
Total future (year 2006) average daily traffic: 141,184
National Bridge Inventory (NBI) Registered Bridges for Homer

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 2
  • 1950-1959: 0
  • 1960-1969: 7
  • 1970-1979: 1
  • 1980-1989: 3
  • 1990-1999: 2
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 4

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 1008431,  Location: JCT OF RTS 11 + I-81 SB (Lat: 42.656083,  Lng: -76.172561),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 7.98m (26.18ft),  Average Daily Traffic: 12,510 (year 2005),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,097 (year 2025),  Design Load: HS 20,  Features Intersected: RTE 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.393,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.98m (26.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,844,000,  Roadway Improvement Cost: $1,097,000,  Total Project Cost: $2,941,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1008432,  Location: JCT OF RTS 11 + I-81 NB (Lat: 42.656725,  Lng: -76.172194),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 7.46m (24.48ft),  Average Daily Traffic: 12,510 (year 2005),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,097 (year 2025),  Design Load: HS 20,  Features Intersected: RTE 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.397,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.46m (24.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $880,000,  Roadway Improvement Cost: $510,000,  Total Project Cost: $1,390,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 101044,  Location: 3.6 MI NE JCT SH 13 & I81 (Lat: 42.649286,  Lng: -76.123592),  Route carried "on" structure: State highway 13,  Year Built: 2002,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,800 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,205 (year 2026),  Design Load: HS 25,  Features Intersected: TIOUGHNIOGA TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.638,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 0.3m (1.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 79.3 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $402,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101045,  Location: 5.2 MI NE JCT SH 13 & I81 (Lat: 42.666050,  Lng: -76.101569),  Route carried "on" structure: State highway 13,  Year Built: 2002,  Status: Open,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 3,201 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,542 (year 2026),  Design Load: HS 25,  Features Intersected: ALBRIGHT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.499,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.4m (47.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.54m (5.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $402,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 101046,  Location: 6.6 MI NE JCT RTS 13+I-81 (Lat: 42.675744,  Lng: -76.077797),  Route carried "on" structure: State highway 13,  Year Built: 1935,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,201 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,542 (year 2026),  Design Load: H 20,  Features Intersected: HAIGHTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.500,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $483,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 102493,  Location: 0.8 MI NW JCT RTS 41 +281 (Lat: 42.653714,  Lng: -76.197775),  Route carried "on" structure: State highway 41,  Year Built: 1940,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,546 (year 1999),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,143 (year 2019),  Design Load: HS 20,  Features Intersected: FACTORY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.977,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $424,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1031411,  Location: 4.3 MI N JCT I81 & SH 13 (Lat: 42.658600,  Lng: -76.173806),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 6.76m (22.18ft),  Average Daily Traffic: 12,510 (year 2005),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,097 (year 2025),  Design Load: HS 20,  Features Intersected: NY SUSQUEHANNA& W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.400,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.76m (22.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,567,000,  Roadway Improvement Cost: $932,000,  Total Project Cost: $2,499,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1031412,  Location: 4.3 MI N JCT I81 & SH 13 (Lat: 42.659278,  Lng: -76.173597),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 12,510 (year 2005),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,097 (year 2025),  Design Load: HS 20,  Features Intersected: NY SUSQUEHANNA& W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.398,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,666,000,  Roadway Improvement Cost: $991,000,  Total Project Cost: $2,657,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1031421,  Location: 7 MI N JCT I81 & SH 13 (Lat: 42.695642,  Lng: -76.157072),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 4.17m (13.68ft),  Average Daily Traffic: 12,510 (year 2005),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,097 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 109
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.425,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $975,000,  Roadway Improvement Cost: $580,000,  Total Project Cost: $1,555,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1031422,  Location: 7 MI N JCT I81 & SH 13 (Lat: 42.695564,  Lng: -76.156558),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 4.17m (13.68ft),  Average Daily Traffic: 12,510 (year 2005),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,097 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 109
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.425,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $786,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 104443,  Location: 3.0 MI N JCT RTS 41 + 281 (Lat: 42.685675,  Lng: -76.169339),  Route carried "on" structure: State highway 281,  Year Built: 1946,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 4,549 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,616 (year 2025),  Design Load: H 20,  Features Intersected: COLD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.646,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $592,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 109373,  Location: 1.4 MI NW JCT RTS 41 +281 (Lat: 42.661128,  Lng: -76.204956),  Route carried "on" structure: State highway 41,  Year Built: 1969,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,546 (year 1999),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,143 (year 2019),  Design Load: HS 20,  Features Intersected: FACTORY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.977,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $266,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 220739,  Location: 3.0 MILES N OF HOMER (Lat: 42.692406,  Lng: -76.177272),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 41 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 51 (year 2022),  Features Intersected: COLD BROOK,  Facility Carried by Structure: AYERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Wood or Timber,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 79.3 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $171,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331223,  Location: 4.8 MI N OF HOMER (Lat: 42.701697,  Lng: -76.185453),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.85m (6.07ft),  Average Daily Traffic: 687 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 793 (year 2022),  Design Load: HS 20,  Features Intersected: COLD BROOK,  Facility Carried by Structure: COLD BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $239,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331225,  Location: 3.4 MI NW OF HOMER (Lat: 42.696086,  Lng: -76.162306),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 796 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,000 (year 2026),  Features Intersected: LITTLE YORK CREEK,  Facility Carried by Structure: LITTLE YORK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.9 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $335,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331227,  Location: 4.5 MI N OF MCGRAW (Lat: 42.661369,  Lng: -76.101678),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 561 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 647 (year 2018),  Design Load: HS 20+Mod,  Features Intersected: E B TIOUGHNIOGA R,  Facility Carried by Structure: E HOMER CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.29m (14.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $335,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 331231,  Location: 4.5 MI NE OF CORTLAND (Lat: 42.645981,  Lng: -76.117458),  Route carried "on" structure: County highway ,  Year Built: 1913,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 204 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 256 (year 2018),  Features Intersected: E BR TIOUGHNIOGA,  Facility Carried by Structure: CR114A E.RIV.CROS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Critical Feature Inspection Date: October 2006,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $525,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 33125,  Location: 5.5 MI N OF MC GRAW (Lat: 42.676061,  Lng: -76.073800),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 4.87m (15.98ft),  Average Daily Traffic: 379 (year 1986),  Truck Traffic: 6%,  Average Future Daily Traffic: 476 (year 2006),  Design Load: HS 25,  Features Intersected: E BR TIOUGHNIOGA,  Facility Carried by Structure: YOUNGS CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.1m (157.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.87m (15.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $268,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 336724,  Location: 2.1 MI NE EAST HOMER (Lat: 42.686742,  Lng: -76.079103),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 150 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 188 (year 2018),  Features Intersected: ALBRIGHT CREEK,  Facility Carried by Structure: HAIGHTS GULF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $199,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Homer, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.