Bridge Statistics for Idabel, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 148ft / 45.2mTotal length
  • $16,849,000Total costs
  • 51,074Total average daily traffic
  • 5,724Total average daily truck traffic
  • 81,718Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Idabel
  • No street view available for this location

New bridges in Idabel, OK - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 71930-1939
  • 51940-1949
  • 31950-1959
  • 41960-1969
  • 21970-1979
  • 21980-1989
  • 11990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Idabel, OK
Average Bridge Truck Traffic in Idabel, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 62.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Good
  • 50.0%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 12.5%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
  • 12.5%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.1%Excellent
  • 9.4%Very good
  • 31.3%Good
  • 37.5%Satisfactory
  • 18.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 37.5%Good
  • 16.7%Satisfactory
  • 4.2%Fair
  • 4.2%Serious
  • 4.2%Failed
Find on map >>   Show street view

Structure Number: 1353,  Location: 2.6N OF IDABEL (Lat: 33.935497,  Lng: -94.828928),  Route carried "on" structure: County highway 4560C,  Year Built: 1923,  Status: Posted for load,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: H 15,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 3.76m (12.34ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 12.95m (42.49ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $661,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $1,038,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4963,  Location: 1.0 S 3.3 W IDABEL (Lat: 33.881036,  Lng: -94.885406),  Route carried "on" structure: County highway E2160,  Year Built: 1936,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: PERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $387,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5157,  Location: 5.0 E 1.3 S IDABEL (Lat: 33.876969,  Lng: -94.739442),  Route carried "on" structure: County highway 4568C,  Year Built: 1937,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.443,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 5158,  Location: 5.0 E 2.0 S IDABEL (Lat: 33.867117,  Lng: -94.739444),  Route carried "on" structure: County highway 4568C,  Year Built: 1937,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.790,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $241,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 5315,  Location: 5.0 E 3.0 S IDABEL (Lat: 33.849606,  Lng: -94.739422),  Route carried "on" structure: County highway 4568C,  Year Built: 1937,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $298,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6165,  Location: 4.0 N IDABEL (Lat: 33.958269,  Lng: -94.824889),  Route carried "on" structure: County highway 4560C,  Year Built: 1938,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.833,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6166,  Location: 3.6 N IDABEL (Lat: 33.950228,  Lng: -94.826575),  Route carried "on" structure: County highway 4560C,  Year Built: 1938,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.180,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 702,  Location: 2.0 W 2.0 S IDABEL (Lat: 33.865997,  Lng: -94.861122),  Route carried "on" structure: County highway 4558C,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.481,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $285,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8199,  Location: 15.4 N TX S/L (Lat: 33.849508,  Lng: -94.826353),  Route carried "on" structure: US 259,  Year Built: 1940,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.811,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 844,  Location: 3.2 N IDABEL (Lat: 33.943792,  Lng: -94.826131),  Route carried "on" structure: County highway 4560C,  Year Built: 1940,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.135,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 8719,  Location: 14.6 N TX S/L (Lat: 33.837178,  Lng: -94.826356),  Route carried "on" structure: US 259,  Year Built: 1940,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.443,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 8721,  Location: 14.7 N TX S/L (Lat: 33.838444,  Lng: -94.826358),  Route carried "on" structure: US 259,  Year Built: 1940,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.604,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 10377,  Location: 2.0 W; 0.5 S IDABEL (Lat: 33.888133,  Lng: -94.861164),  Route carried "on" structure: County highway N4600,  Year Built: 1946,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13317,  Location: 9.4 N-E TX S/L (Lat: 33.895622,  Lng: -94.906458),  Route carried "on" structure: State highway 37,  Year Built: 1955,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,360 (year 2040),  Design Load: HS 20,  Features Intersected: BOKCHITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.157,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13439,  Location: 10.5 N-E TX S/L (Lat: 33.895550,  Lng: -94.887769),  Route carried "on" structure: State highway 37,  Year Built: 1955,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,360 (year 2040),  Design Load: HS 20,  Features Intersected: PERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.895,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $717,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14037,  Location: 1.0 E JCT SH37/US70B (Lat: 33.895483,  Lng: -94.834681),  Route carried "on" structure: County highway E2150,  Year Built: 1958,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,750 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 12.2m (40.0ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1462,  Location: 4.6 S; 2.0 W IDABEL (Lat: 33.828647,  Lng: -94.861186),  Route carried "on" structure: County highway N4600,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14911,  Location: 4.0 S; 2.0 W IDABEL (Lat: 33.834094,  Lng: -94.861200),  Route carried "on" structure: County highway N4600,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17408,  Location: 1.4 E JCT US-259 (Lat: 33.880828,  Lng: -94.801594),  Route carried "on" structure: State highway 70,  Year Built: 1969,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,760 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17434,  Location: 50' E JCT US-259 (Lat: 33.880933,  Lng: -94.827056),  Route carried "on" structure: State highway 70,  Year Built: 1969,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.919,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 19437,  Location: 0.1 S JCT SH-70 TRK (Lat: 33.880061,  Lng: -94.826350),  Route carried "on" structure: US 259,  Year Built: 1978,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 3,900 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,240 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.221,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 21438,  Location: 3.0 W; 1.0 S IDABEL (Lat: 33.881025,  Lng: -94.878264),  Route carried "on" structure: County highway E2160,  Year Built: 1987,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24182,  Location: 4.0 S; 1.2 W IDABEL (Lat: 33.837417,  Lng: -94.847567),  Route carried "on" structure: County highway E2190,  Year Built: 1998,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: WATERFALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27024,  Location: 1.9MI W JCT US259/US70 (Lat: 33.919836,  Lng: -94.811731),  Route carried "on" structure: US 70,  Year Built: 2000,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.738,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27025,  Location: 1.4MI W JCT US259/US70 (Lat: 33.919694,  Lng: -94.802839),  Route carried "on" structure: US 70,  Year Built: 2000,  Status: Open,  Structure Length: 1.41m (4.63ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.558,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27026,  Location: 1.0MI W JCT US259/US70 (Lat: 33.919725,  Lng: -94.794728),  Route carried "on" structure: US 70,  Year Built: 2000,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.299,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27027,  Location: 0.1MI W JCT US259/US70 (Lat: 33.919328,  Lng: -94.774272),  Route carried "on" structure: US 70,  Year Built: 2000,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.198,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 28696,  Location: 4.6 N; 4.0 E HAWORTH (Lat: 33.919919,  Lng: -94.722231),  Route carried "on" structure: County highway N4680,  Year Built: 2006,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 38 (year 2040),  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 30246,  Location: 0.02 E GUTHRIE ST (Lat: 33.894608,  Lng: -94.833961),  Route carried "on" structure: County highway E2151,  Year Built: 1985,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: HASKELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.7m (5.6ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: April 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,000,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 30249,  Location: 0.3 W DIXIE ST (Lat: 33.888297,  Lng: -94.831353),  Route carried "on" structure: City street E2156,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 640 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: VAN BUREN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Serious,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $99,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3089,  Location: 100' N OF HASKELL PL (Lat: 33.894983,  Lng: -94.841308),  Route carried "on" structure: City street N4616,  Year Built: 2007,  Status: Closed,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: NW GUTHRIE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.0m (6.6ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Satisfactory,  Culverts: Failed,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,000,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 3111,  Location: .5S 1.5W OF BROKEN BOW (Lat: 33.982500,  Lng: -94.811667),  Route carried "on" structure: County highway 4530C,  Year Built: 2015,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: HL 93,  Features Intersected: HOLLY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Total Project Cost: $225,000