U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Industry, California (CA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Industry, CA, California, California forum, All US cities.





Parts: 1, 2


National Bridge Inventory (NBI) Statistics
Number of bridges: 68
Total length: 501 meters (1,644ft)
Total costs: $5,137,000
Total average daily traffic: 4,346,779
Total average daily truck traffic: 359,799
National Bridge Inventory (NBI) Registered Bridges for Industry

New bridges - Historical Statistics

  • 1910-1919: 2
  • 1920-1929: 0
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 4
  • 1960-1969: 47
  • 1970-1979: 5
  • 1980-1989: 5
  • 1990-1999: 4

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 3
  • 1980-1989: 5
  • 1990-1999: 3

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Channel

Find on map >>

Structure Number: 53 1477,  Location: 07-LA-605-R16.65-IDY (Lat: 34.026667,  Lng: -118.036667),  Route carried "under" structure: Interstate 605,  Year Built: 1963,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 237,090 (year 2006),  Truck Traffic: 13%,  Features Intersected: ROUTE 605 & RAMP,  Facility Carried by Structure: PECK ROAD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 1.665,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>

Structure Number: 53 1534G,  Location: 07-LA-060-11.65-IDY (Lat: 34.033333,  Lng: -118.028333),  Route carried "under" structure: Interstate 605,  Year Built: 1967,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 8,500 (year 2006),  Truck Traffic: 2%,  Features Intersected: I 605 & CONN,  Facility Carried by Structure: EBND ROUTE 60
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.732,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>

Structure Number: 53 1534G,  Location: 07-LA-060-11.65-IDY (Lat: 34.033333,  Lng: -118.028333),  Route carried "under" structure: Interstate 60,  Year Built: 1967,  Structure Length: 9.45m (31.00ft),  Features Intersected: I 605 & CONN
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>

Structure Number: 53 1535,  Location: 07-LA-060-11.67-IDY (Lat: 34.033333,  Lng: -118.026667),  Route carried "under" structure: Interstate 605,  Year Built: 1967,  Structure Length: 14.30m (46.92ft),  Average Daily Traffic: 249,200 (year 1997),  Truck Traffic: 13%,  Features Intersected: INTERSTATE 605,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 1.741,  Lanes on structure: 10,  Lanes under structure: 12,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>

Structure Number: 53 1535,  Location: 07-LA-060-11.67-IDY (Lat: 34.033333,  Lng: -118.026667),  Route carried "under" structure: Interstate 60,  Year Built: 1967,  Structure Length: 14.30m (46.92ft),  Features Intersected: INTERSTATE 605
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>

Structure Number: 53 1535,  Location: 07-LA-060-11.67-IDY (Lat: 34.033333,  Lng: -118.026667),  Route carried "under" structure: Interstate 605,  Year Built: 1967,  Structure Length: 14.30m (46.92ft),  Features Intersected: INTERSTATE 605,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>

Structure Number: 53 1535,  Location: 07-LA-060-11.67-IDY (Lat: 34.033333,  Lng: -118.026667),  Route carried "under" structure: Interstate 60,  Year Built: 1967,  Structure Length: 14.30m (46.92ft),  Features Intersected: INTERSTATE 605
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>

Structure Number: 53 1535,  Location: 07-LA-060-11.67-IDY (Lat: 34.033333,  Lng: -118.026667),  Route carried "under" structure: US 605,  Year Built: 1967,  Structure Length: 14.30m (46.92ft),  Features Intersected: INTERSTATE 605,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>

Structure Number: 53 1536F,  Location: 07-LA-060-11.75-IDY (Lat: 34.036667,  Lng: -118.026667),  Route carried "under" structure: Interstate 605,  Year Built: 1967,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 62,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: 605 & CONN,  Facility Carried by Structure: NORTH CONN OC
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.175,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 53 1537,  Location: 07-LA-605-R19.39-IDY (Lat: 34.055000,  Lng: -118.001667),  Route carried "under" structure: Ramp Interstate 605,  Year Built: 1964,  Structure Length: 17.16m (56.30ft),  Average Daily Traffic: 35,000 (year 2006),  Truck Traffic: 2%,  Features Intersected: RIVERGRADE OH
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 53 1537,  Location: 07-LA-605-R19.39-IDY (Lat: 34.055000,  Lng: -118.001667),  Route carried "under" structure: City street L353,  Year Built: 1964,  Structure Length: 17.16m (56.30ft),  Average Daily Traffic: 38,500 (year 2006),  Truck Traffic: 2%,  Features Intersected: RIVERGRADE OH,  Facility Carried by Structure: INTERSTATE 605
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 53 1537,  Location: 07-LA-605-R19.39-IDY (Lat: 34.055000,  Lng: -118.001667),  Route carried "under" structure: City street ,  Year Built: 1964,  Structure Length: 17.16m (56.30ft),  Average Daily Traffic: 2,500 (year 2006),  Truck Traffic: 2%,  Features Intersected: RIVERGRADE OH,  Facility Carried by Structure: INTERSTATE 605
Minimum Vertical Clearance: 9.68m (31.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 53 1562,  Location: 07-LA-605-R17.75-IDY (Lat: 34.038333,  Lng: -118.023333),  Route carried "under" structure: Bypass Other road 605,  Year Built: 1964,  Structure Length: 0.52m (1.71ft),  Features Intersected: SAN JOSE CREEK ACCESS RD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.775,  Lanes on structure: 9,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 4.9m (16.1ft)

Find on map >>

Structure Number: 53 1618,  Location: 07-LA-605-R18.67-IDY (Lat: 34.045000,  Lng: -118.010000),  Route carried "under" structure: Bypass Other road 605,  Year Built: 1964,  Structure Length: 0.43m (1.41ft),  Features Intersected: GOLF COURSE PUC
Minimum Vertical Clearance: 0.24m (0.79ft),  Kilometerpoint: 1.867,  Lanes on structure: 8,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 4.0m (13.1ft)

Find on map >>

Structure Number: 53 1773,  Location: 07-LA-060-19.1-IDY (Lat: 33.995000,  Lng: -117.895000),  Route carried "under" structure: Bypass City street 60,  Year Built: 1966,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 4,000 (year 1990),  Truck Traffic: 4%,  Features Intersected: STONER CREEK ROAD
Minimum Vertical Clearance: 0.61m (2.00ft),  Kilometerpoint: 0.191,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>

Structure Number: 53 1786,  Location: 07-LA-060-19.46-IDY (Lat: 33.993333,  Lng: -117.890000),  Route carried "under" structure: City street Q976,  Year Built: 1967,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 33,600 (year 1998),  Truck Traffic: 2%,  Features Intersected: FULLERTON RD,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 0.46m (1.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 53 1788,  Location: 07-LA-060-R21.48-IDY (Lat: 33.995000,  Lng: -117.870000),  Route carried "under" structure: City street Q963,  Year Built: 1970,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 15,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: FAIRWAY DR,  Facility Carried by Structure: RTE 60
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>

Structure Number: 53 266,  Location: 07-LA-060-12.63-IDY (Lat: 34.028333,  Lng: -118.010000),  Route carried "under" structure: State highway 60,  Year Built: 1981,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 265,000 (year 1998),  Features Intersected: ROUTE 60,  Facility Carried by Structure: CROSSINGROADS PKWY
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 1.263,  Lanes on structure: 4,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>

Structure Number: 53C0032,  Location: 0.1 M W/O SAN GAB R FWY (Lat: 34.055000,  Lng: -118.006667),  Route carried "under" structure: Ramp Interstate 605,  Year Built: 1916,  Structure Length: 28.74m (94.29ft),  Average Daily Traffic: 186,600 (year 1997),  Truck Traffic: 4%,  Features Intersected: SAN GABRIEL RIVER,  Facility Carried by Structure: VALLEY BLVD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.194,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>

Structure Number: 53C0138,  Location: 1/4 MI NW WORKMAN MILL RD (Lat: 34.023333,  Lng: -118.036667),  Route carried "under" structure: City street L368,  Year Built: 1962,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 27,132 (year 2002),  Truck Traffic: 4%,  Features Intersected: SAN JOSE CRK UP(PECK RD),  Facility Carried by Structure: UPRR
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 53C0289,  Location: 1 MI N POMONA FWY (Lat: 34.008333,  Lng: -117.925000),  Route carried "under" structure: City street L353,  Year Built: 1967,  Structure Length: 22.56m (74.02ft),  Average Daily Traffic: 29,700 (year 1998),  Truck Traffic: 4%,  Features Intersected: VALLEY BL/ARENTH AV/SPRR,  Facility Carried by Structure: AZUSA AVE
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>

Structure Number: 53C0448,  Location: 3/8 MI N POMONA FWY (Lat: 34.001667,  Lng: -117.921667),  Route carried "under" structure: City street L379,  Year Built: 1971,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 54,572 (year 2002),  Truck Traffic: 4%,  Features Intersected: AZUSA AVENUE,  Facility Carried by Structure: UPRR
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>

Structure Number: 53C0873,  Location: 1/4 MI N VALLEY BLVD (Lat: 34.021667,  Lng: -117.955000),  Route carried "under" structure: City street L683,  Year Built: 1977,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 45,857 (year 2002),  Truck Traffic: 4%,  Features Intersected: HACIENDA BLVD,  Facility Carried by Structure: SPTCO
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.2m (63.0ft)


Parts: 1, 2

Discuss this city on our hugely popular California forum

Back to: Industry, CA, California, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.