![]() |
Bridge Statistics for Jackson, Minnesota (MN) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Jackson, MN, Minnesota, Minnesota forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 58 meters (190ft) Total costs: $2,769,000 Total average daily traffic: 30,079 Total average daily truck traffic: 2,841 National Bridge Inventory (NBI) Registered Bridges for Jackson
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 3254, Location: 0.1 MI E OF 3RD ST (Lat: 43.623333, Lng: -94.985000), Route carried "on" structure: City street 15, Year Built: 1985, Status: Open, Structure Length: 6.93m (22.74ft), Average Daily Traffic: 500 (year 1988), Design Load: HS 20, Features Intersected: DES MOINES RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.9m (85.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 37.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.60m (24.93ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,011,000, Roadway Improvement Cost: $20,000, Total Project Cost: $496,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 32811, Location: AT JCT TH 71 (Lat: 43.640561, Lng: -94.994786), Route carried "on" structure: Interstate 90, Year Built: 1971, Status: Open, Structure Length: 9.36m (30.71ft), Average Daily Traffic: 3,950 (year 2004), Truck Traffic: 14%, Design Load: HS 20, Features Intersected: TH 71 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.3m (37.1ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.3m (79.7ft), Curb-To-Curb Width: 12.3m (40.4ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 70.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete Find on map >>
Structure Number: 32812, Location: AT JCT TH 71 (Lat: 43.640497, Lng: -94.995100), Route carried "on" structure: Interstate 90, Year Built: 1971, Status: Open, Structure Length: 9.36m (30.71ft), Average Daily Traffic: 3,950 (year 2004), Truck Traffic: 14%, Design Load: HS 20, Features Intersected: TH 71 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.3m (37.1ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.3m (79.7ft), Curb-To-Curb Width: 12.3m (40.4ft), Out-to-Out Width: 13.6m (44.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 71.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete Find on map >>
Structure Number: 32J37, Location: 0.5 MI W OF JCT TH 71 (Lat: 43.615886, Lng: -95.002119), Route carried "on" structure: County highway 34, Year Built: 2006, Status: Open, Structure Length: 0.43m (1.41ft), Average Daily Traffic: 610 (year 2006), Average Future Daily Traffic: 610 (year 2026), Design Load: HS 25, Features Intersected: NELSON CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.3m (14.1ft) Condition: Channel: Good, Culverts: Excellent, Operating Rating: 68.6 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 12 months, Inspection Date: December 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 3491, Location: 0.6 MI S OF JACKSON (Lat: 43.614161, Lng: -94.994369), Route carried "on" structure: US 71, Year Built: 1924, Status: Open, Structure Length: 1.04m (3.41ft), Average Daily Traffic: 3,050 (year 2004), Truck Traffic: 10%, Design Load: H 15, Features Intersected: PHART CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.5m (50.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.4m (11.2ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 39.2 metric tons, Inventory Rating: 29.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 6741, Location: 0.4 MI N OF JACKSON (Lat: 43.626903, Lng: -94.991672), Route carried "on" structure: US 71, Year Built: 1954, Status: Open, Structure Length: 5.12m (16.80ft), Average Daily Traffic: 6,700 (year 2004), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: DES MOINES RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.4m (60.4ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 70.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 17.60m (57.74ft), Designated Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Other Special Inspection Frequency: Every 48 months, Inspection Date: August 2007, Underwater Inspection Date: April 2004, Other Special Inspection Date: August 2007, Bridge Improvement Cost: $1,714,000, Total Project Cost: $1,764,000 ( Estimate for 2004), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete Find on map >>
Structure Number: 7105, Location: IN JACKSON (Lat: 43.620958, Lng: -94.985881), Route carried "on" structure: County highway 14, Year Built: 1955, Year Reconstructed: 1982, Status: Open, Structure Length: 6.33m (20.77ft), Average Daily Traffic: 3,700 (year 2004), Design Load: HS 20, Features Intersected: DES MOINES RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 27.6m (90.6ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.1m (39.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 52.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 26.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 7.00m (22.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $749,000, Roadway Improvement Cost: $30,000, Total Project Cost: $509,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 95059, Location: 1.7 MI N OF JCT CSAH 32 (Lat: 43.844111, Lng: -95.355694), Route carried "on" structure: County highway 181, Year Built: 2003, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 19 (year 2003), Design Load: HS 25, Features Intersected: STREAM Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Very good, Culverts: Excellent, Operating Rating: 58.8 metric tons, Inventory Rating: 39.2 metric tons, Structural Evaluation: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Wearing Surface/Protective System: Wearing Surface: Gravel Find on map >>
Structure Number: 32811, Location: AT JCT TH 71 (Lat: 43.640561, Lng: -94.994786), Route carried "under" structure: US 71, Year Built: 1971, Structure Length: 9.36m (30.71ft), Average Daily Traffic: 3,800 (year 2004), Truck Traffic: 10%, Features Intersected: TH 71, Facility Carried by Structure: I 90 WB Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.3m (79.7ft) Find on map >>
Structure Number: 32812, Location: AT JCT TH 71 (Lat: 43.640497, Lng: -94.995100), Route carried "under" structure: US 71, Year Built: 1971, Structure Length: 9.36m (30.71ft), Average Daily Traffic: 3,800 (year 2004), Truck Traffic: 10%, Features Intersected: TH 71, Facility Carried by Structure: I 90 EB Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.3m (79.7ft) Discuss this city on our hugely popular Minnesota forum Back to: Jackson, MN, Minnesota, All US cities.
|
![]() |