U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Jasper, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Jasper, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 41
Total length: 215 meters (705ft)
Total costs: $56,413,000
Total average daily traffic: 314,695
Total average daily truck traffic: 32,020
National Bridge Inventory (NBI) Registered Bridges for Jasper

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 3
  • 1960-1969: 6
  • 1970-1979: 3
  • 1980-1989: 4
  • 1990-1999: 19
  • 2000-2009: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 691,  Location: 1.1MI.NJCTAL118 (Lat: 33.850000,  Lng: -87.283333),  Route carried "on" structure: State highway 195,  Year Built: 1929,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 14,120 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,083 (year 2027),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.975,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $263,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 732,  Location: WILLIAMS ST & 14TH ST (Lat: 33.266667,  Lng: -87.783333),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 460 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2026),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: WILLIAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.7m (25.3ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.42m (4.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $191,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 757,  Location: 17TH ST & 1ST AVE (Lat: 33.766667,  Lng: -87.266667),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,000 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,000 (year 2026),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 17 TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $269,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1408,  Location: 3RD AVE & 25TH ST (Lat: 33.733333,  Lng: -87.216667),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,100 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2028),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: 3RD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 9.0 metric tons,  Inventory Rating: 6.3 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $351,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 319,  Location: 8 TH AVE & 19 TH ST (Lat: 33.783333,  Lng: -87.283333),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 300 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2026),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: 8 TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.4m (27.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3654,  Location: 26TH ST & 3RD AVE (Lat: 33.733333,  Lng: -87.233333),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,100 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2026),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 26TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.0m,  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.37m (11.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $779,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5458,  Location: US 78 & TOWN CREEK (Lat: 33.866667,  Lng: -87.300000),  Route carried "on" structure: State highway 5,  Year Built: 1956,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 7,360 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,382 (year 2027),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: US 78
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 280.375,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 0.8m (2.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $874,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5473,  Location: WRIGHT ST & 3RD AVE (Lat: 33.750000,  Lng: -87.283333),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 1,860 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2026),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: WRIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $266,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7638,  Location: US 78 & AL 5 (Lat: 33.837500,  Lng: -87.299167),  Route carried "on" structure: State highway 5,  Year Built: 1962,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 12,960 (year 2007),  Average Future Daily Traffic: 13,678 (year 2027),  Design Load: HS 20,  Features Intersected: US 78
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.585,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $811,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,216,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9816,  Location: 0.5 MI SO JCT AL 69 (Lat: 33.836389,  Lng: -87.290833),  Route carried "on" structure: State highway 269,  Year Built: 1968,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 10,600 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,960 (year 2027),  Design Load: HS 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.453,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Inventory Rating: 24.5 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $687,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 9997,  Location: 18TH ST & 2ND AVE (Lat: 33.766667,  Lng: -87.266667),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,000 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2026),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 18TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $581,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $871,000 ( Estimate for 2008)
Find on map >>

Structure Number: 10113,  Location: AL 269 & BURLINGTON RR (Lat: 33.808333,  Lng: -87.287222),  Route carried "on" structure: State highway 269,  Year Built: 1967,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 10,600 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,960 (year 2027),  Design Load: HS 20,  Features Intersected: BURLINGTON RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.374,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,081,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,621,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10272,  Location: 18TH ST & AL 69 (Lat: 33.783333,  Lng: -87.283333),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2026),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: 18TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $369,000 ( Estimate for 2008)
Find on map >>

Structure Number: 10306,  Location: 18TH ST & SOU RR (Lat: 33.766667,  Lng: -87.266667),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 7,500 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,000 (year 2026),  Design Load: HS 20,  Features Intersected: SOUTHERN RAILROAD,  Facility Carried by Structure: 18TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.019,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.74m (18.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,555,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $2,333,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10741,  Location: RUSSELVILLE RD & CHEROKEE (Lat: 33.750000,  Lng: -87.250000),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 400 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2026),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: RUSSELVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $180,000 ( Estimate for 2008)
Find on map >>

Structure Number: 13348,  Location: AL 69 & 19TH ST (Lat: 33.839722,  Lng: -87.295556),  Route carried "on" structure: State highway 69,  Year Built: 1984,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 8,200 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,935 (year 2027),  Design Load: HS 20,  Features Intersected: TANYARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 322.834,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.12m (6.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $891,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 13563,  Location: 20 TH STREET & 8TH AVE (Lat: 33.816667,  Lng: -87.283333),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,000 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,000 (year 2026),  Design Load: HS 20,  Features Intersected: TANYHARD CREEK,  Facility Carried by Structure: 20 TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $578,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 13618,  Location: 20TH ST & TOWN CREEK (Lat: 33.816667,  Lng: -87.266667),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 6,000 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,000 (year 2026),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 20TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000 ( Estimate for 2008)
Find on map >>

Structure Number: 14254,  Location: 1.7 MILES NORTH AL 269 (Lat: 33.859444,  Lng: -87.306389),  Route carried "on" structure: State highway 69,  Year Built: 1987,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,190 (year 2007),  Truck Traffic: 22%,  Average Future Daily Traffic: 4,935 (year 2027),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.570,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $852,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,278,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16281,  Location: 19TH STREET & AL. AVE (Lat: 33.750000,  Lng: -87.283333),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 8,600 (year 2006),  Average Future Daily Traffic: 12,000 (year 2026),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 19TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.9m (42.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 40.9 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $717,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,076,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16324,  Location: CORR X @ IND ACC.RD. (Lat: 33.797778,  Lng: -87.243611),  Route carried "on" structure: US 78,  Year Built: 1997,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 5,815 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,583 (year 2027),  Design Load: HS 20,  Features Intersected: INDUSTRIAL ACCESS RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.200,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.97m (26.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,868,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,802,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16325,  Location: CORR X @ IND ACC.RD (Lat: 33.792778,  Lng: -87.252778),  Route carried "on" structure: US 78,  Year Built: 1997,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 5,815 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,583 (year 2027),  Design Load: HS 20,  Features Intersected: INDUSTRIAL ACCESS RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.200,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.97m (26.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,899,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $2,849,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1642,  Location: AL 269 @ CORR X (Lat: 33.810278,  Lng: -87.268333),  Route carried "on" structure: State highway 269,  Year Built: 1995,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 7,200 (year 2007),  Truck Traffic: 14%,  Average Future Daily Traffic: 7,214 (year 2027),  Design Load: HS 20,  Features Intersected: CORRIDOR X
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 63.730,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.33m (43.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $5,343,000,  Roadway Improvement Cost: $534,000,  Total Project Cost: $8,014,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16429,  Location: .1 MI. W CORRIDOR X (Lat: 33.832222,  Lng: -87.325833),  Route carried "on" structure: State highway 69,  Year Built: 1995,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 4,990 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,935 (year 2027),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 319.484,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $2,971,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $4,456,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16898,  Location: CORRIDOR X OVER HOLLEY (Lat: 33.824444,  Lng: -87.325556),  Route carried "on" structure: US 78,  Year Built: 1996,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 4,375 (year 2007),  Truck Traffic: 26%,  Average Future Daily Traffic: 2,583 (year 2027),  Design Load: HS 20,  Features Intersected: HOLLEY GROVE RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.659,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 40.8 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.19m (33.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,739,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,609,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16899,  Location: CORRIDOR X OVER HOLLEY (Lat: 33.832778,  Lng: -87.318056),  Route carried "on" structure: US 78,  Year Built: 1996,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 4,375 (year 2007),  Truck Traffic: 26%,  Average Future Daily Traffic: 2,583 (year 2027),  Design Load: HS 20,  Features Intersected: HOLLEY GROVE RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.659,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 40.8 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.19m (33.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,739,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,609,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16902,  Location: 0.2MI W MOON ROAD (Lat: 33.855556,  Lng: -87.358333),  Route carried "on" structure: US 78,  Year Built: 1996,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,750 (year 2007),  Truck Traffic: 26%,  Average Future Daily Traffic: 18,000 (year 2027),  Design Load: HS 20,  Features Intersected: CANE CREEK,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.052,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $4,604,000,  Roadway Improvement Cost: $460,000,  Total Project Cost: $6,906,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16903,  Location: 0.1MI S AL 118 (Lat: 33.859444,  Lng: -87.336667),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 14.60m (47.90ft),  Average Daily Traffic: 200 (year 2001),  Truck Traffic: 20%,  Average Future Daily Traffic: 400 (year 2027),  Design Load: HS 20,  Features Intersected: CORRIDOR X,  Facility Carried by Structure: SO FRONTAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.37m (50.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $2,239,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $3,359,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 17036,  Location: CORR X OVER SR 69 (Lat: 33.817778,  Lng: -87.300833),  Route carried "on" structure: US 78,  Year Built: 1995,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 4,680 (year 2007),  Truck Traffic: 24%,  Average Future Daily Traffic: 2,583 (year 2027),  Design Load: HS 20,  Features Intersected: AL 69,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.623,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.93m (29.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,513,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $2,269,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 17037,  Location: CORR X OVER SR 69 (Lat: 33.837778,  Lng: -87.300556),  Route carried "on" structure: US 78,  Year Built: 1996,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 4,680 (year 2007),  Truck Traffic: 24%,  Average Future Daily Traffic: 2,583 (year 2027),  Design Load: HS 20,  Features Intersected: AL 69,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.623,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.92m (29.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,522,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $2,283,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 17214,  Location: B & N RR (Lat: 33.812222,  Lng: -87.236667),  Route carried "on" structure: State highway ,  Year Built: 2001,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 8,390 (year 2003),  Truck Traffic: 34%,  Average Future Daily Traffic: 16,690 (year 2027),  Design Load: HS 20,  Features Intersected: B&N RR,  Facility Carried by Structure: INDUSTRIAL ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.9 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $2,276,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $3,414,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 7088,  Location: AL 69&I C RR (Lat: 33.861944,  Lng: -87.315278),  Route carried "under" structure: Other road 69,  Year Built: 1960,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 10,740 (year 2007),  Truck Traffic: 20%,  Features Intersected: AL 69,  Facility Carried by Structure: RR
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 326.407,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>

Structure Number: 7638,  Location: U.S. 78 & AL 69 (Lat: 33.837500,  Lng: -87.299167),  Route carried "under" structure: State highway 69,  Year Built: 1962,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 10,050 (year 2007),  Truck Traffic: 19%,  Features Intersected: AL.69,  Facility Carried by Structure: AL 5
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 328.145,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>

Structure Number: 16324,  Location: INDUSTRIAL ACCESS ROAD (Lat: 33.797778,  Lng: -87.243611),  Route carried "under" structure: Business County highway ,  Year Built: 1997,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 100,000 (year 1997),  Truck Traffic: 1%,  Features Intersected: IND ACCESS RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>

Structure Number: 16325,  Location: INDUSTRIAL ACCESS ROAD (Lat: 33.792778,  Lng: -87.252778),  Route carried "under" structure: Business County highway ,  Year Built: 1997,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 100 (year 1997),  Features Intersected: INDUSTRIAL ACCESS RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>

Structure Number: 1642,  Location: CORR X @ AL 269 (Lat: 33.810278,  Lng: -87.268333),  Route carried "under" structure: US 78,  Year Built: 1995,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 11,630 (year 2007),  Truck Traffic: 20%,  Features Intersected: CORRIDOR X,  Facility Carried by Structure: AL 269
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 101.179,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>

Structure Number: 16898,  Location: CORR X OVER HOLLEY DR (Lat: 33.824444,  Lng: -87.325556),  Route carried "under" structure: County highway ,  Year Built: 1996,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 200 (year 2001),  Truck Traffic: 1%,  Features Intersected: HOLLEY DR,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 0.65m (2.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>

Structure Number: 16899,  Location: CORR X OVER HOLLEY GROVE (Lat: 33.832778,  Lng: -87.318056),  Route carried "under" structure: County highway ,  Year Built: 1996,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 200 (year 2001),  Truck Traffic: 1%,  Features Intersected: HOLLEY GROVE RD,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 0.65m (2.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>

Structure Number: 16903,  Location: .1 MI.SO.AL 118 (Lat: 33.859444,  Lng: -87.336667),  Route carried "under" structure: US 78,  Year Built: 1996,  Structure Length: 14.60m (47.90ft),  Average Daily Traffic: 8,750 (year 2007),  Truck Traffic: 26%,  Features Intersected: CORRIDOR X,  Facility Carried by Structure: SO FRONTAGE ROAD
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 92.442,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>

Structure Number: 17036,  Location: CORR X & AL 69 (JASPER) (Lat: 33.817778,  Lng: -87.300833),  Route carried "under" structure: State highway 69,  Year Built: 1995,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 6,110 (year 2007),  Truck Traffic: 8%,  Features Intersected: AL 69,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 319.617,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>

Structure Number: 17037,  Location: CORR X & AL 69 (JASPER) (Lat: 33.837778,  Lng: -87.300556),  Route carried "under" structure: State highway 69,  Year Built: 1996,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 2,495 (year 2007),  Truck Traffic: 12%,  Features Intersected: AL 69,  Facility Carried by Structure: CORRIDOR X
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 319.616,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss this city on our hugely popular Alabama forum

Back to: Jasper, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.