U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Junction City, Kansas (KS) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Junction City, KS, Kansas, Kansas forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 25
Total length: 204 meters (669ft)
Total costs: $7,328,000
Total average daily traffic: 226,945
Total average daily truck traffic: 38,063
National Bridge Inventory (NBI) Registered Bridges for Junction City

New bridges - Historical Statistics

  • 1940-1949: 2
  • 1950-1959: 6
  • 1960-1969: 9
  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 3
  • 2000-2009: 4

Reconstructed bridges - Historical Statistics

  • 1980-1989: 4
  • 1990-1999: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 31003,  Location: RUCKER ST. WEST EDGE J.C. (Lat: 39.033333,  Lng: -96.858333),  Route carried "on" structure: County highway 2201,  Year Built: 1965,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,005 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,010 (year 2024),  Features Intersected: PRICE RAVINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 310031,  Location: (E.BOUND) NE EDGE OF J.C. (Lat: 39.061667,  Lng: -96.805000),  Route carried "on" structure: County highway 2214,  Year Built: 1978,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 12,505 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,000 (year 2024),  Design Load: HS 20,  Features Intersected: REPUBLICAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 310032,  Location: (W.BOUND) NE EDGE OF J.C. (Lat: 39.061667,  Lng: -96.805000),  Route carried "on" structure: County highway 2214,  Year Built: 1993,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 12,505 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,000 (year 2024),  Design Load: HS 20,  Features Intersected: REPUBLICAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 414150312212001,  Location: .06 MI. W EISENHOWER ST. (Lat: 39.036944,  Lng: -96.850556),  Route carried "on" structure: City street 2212,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,790 (year 2004),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,000 (year 2024),  Features Intersected: REPUBLICAN RIVER DRAIN.,  Facility Carried by Structure: WEST 14TH. ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007
Find on map >>

Structure Number: 414150312216002,  Location: 0.95 W. OF GARFIELD (Lat: 39.033333,  Lng: -96.836667),  Route carried "on" structure: City street 2216,  Year Built: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 12,640 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,000 (year 2024),  Features Intersected: REPUBLICAN RIVER DRAIN.,  Facility Carried by Structure: 6TH. ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007
Find on map >>

Structure Number: 9999040B0310351,  Location: 0.23 MI E US77 BS (Lat: 39.028056,  Lng: -96.825278),  Route carried "on" structure: Business US 40,  Year Built: 1948,  Status: Open,  Structure Length: 17.29m (56.73ft),  Average Daily Traffic: 7,500 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,101 (year 2027),  Design Load: HS 20,  Features Intersected: UPRR, MONROE ST, RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 17.29m (56.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,018,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9999040B0310361,  Location: 0.70 MI E US77 BS (Lat: 39.028056,  Lng: -96.816944),  Route carried "on" structure: Business US 40,  Year Built: 1948,  Status: Open,  Structure Length: 12.64m (41.47ft),  Average Daily Traffic: 7,070 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,522 (year 2027),  Design Load: HS 20,  Features Intersected: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.573,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.64m (41.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $744,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999907000310051,  Location: 4.97 MI E DK COLN, WB (Lat: 39.000000,  Lng: -96.871944),  Route carried "on" structure: Interstate 70,  Year Built: 1959,  Status: Open,  Structure Length: 3.49m (11.45ft),  Average Daily Traffic: 8,300 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 14,702 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 465.863,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999907000310061,  Location: 4.96 MI E DK COLN, EB (Lat: 39.000000,  Lng: -96.871667),  Route carried "on" structure: Interstate 70,  Year Built: 1959,  Status: Open,  Structure Length: 3.49m (11.45ft),  Average Daily Traffic: 8,300 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 14,702 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 465.879,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999907000310071,  Location: JCT US77/I70, NL (Lat: 38.999444,  Lng: -96.861111),  Route carried "on" structure: Interstate 70,  Year Built: 1959,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 11,150 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,761 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: US77 HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.179,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $240,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999907000310081,  Location: JCT US77/I70, EB (Lat: 38.999167,  Lng: -96.860833),  Route carried "on" structure: Interstate 70,  Year Built: 1959,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 11,150 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,761 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: US77 HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.194,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $240,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999907000310091,  Location: WJCT US40 BS/I70 WB (Lat: 39.007500,  Lng: -96.835000),  Route carried "on" structure: Interstate 70,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.76m (15.62ft),  Average Daily Traffic: 11,150 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,761 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: US40 BS ROUTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 274.716,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.76m (15.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $215,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>

Structure Number: 999907000310101,  Location: WJCT US40 BS/I70 EB (Lat: 39.007500,  Lng: -96.834444),  Route carried "on" structure: Interstate 70,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 11,150 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,761 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: US40 BS ROUTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 274.732,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>

Structure Number: 999907000310141,  Location: 2.05 MI E WJCT 40 BS, WB (Lat: 39.025556,  Lng: -96.805278),  Route carried "on" structure: Interstate 70,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 27.41m (89.93ft),  Average Daily Traffic: 12,400 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 23,282 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: SMOKY HILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.024,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.41m (89.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,034,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,551,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 999907000310151,  Location: 2.04 MI E WJCT 40 BS, SL (Lat: 39.025278,  Lng: -96.805278),  Route carried "on" structure: Interstate 70,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 27.46m (90.09ft),  Average Daily Traffic: 12,400 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 23,282 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: SMOKY HILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.008,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.46m (90.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,243,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999907000310681,  Location: 0.27 MI E WJCT US40 BS NL (Lat: 39.009722,  Lng: -96.830556),  Route carried "on" structure: Interstate 70,  Year Built: 1992,  Status: Open,  Structure Length: 8.80m (28.87ft),  Average Daily Traffic: 11,700 (year 2007),  Truck Traffic: 19%,  Average Future Daily Traffic: 22,397 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: UP RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 275.158,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $498,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999907000310691,  Location: 0.27 MI E WJCT -40 BS SL (Lat: 39.009444,  Lng: -96.830556),  Route carried "on" structure: Interstate 70,  Year Built: 1992,  Status: Open,  Structure Length: 8.80m (28.87ft),  Average Daily Traffic: 11,700 (year 2007),  Truck Traffic: 19%,  Average Future Daily Traffic: 22,397 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: UP RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 275.142,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $398,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999907000310851,  Location: 3.1 MI E K-18/I-70 JCT (Lat: 39.020278,  Lng: -96.815833),  Route carried "on" structure: Interstate 70,  Year Built: 2006,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 11,700 (year 2007),  Truck Traffic: 19%,  Average Future Daily Traffic: 22,397 (year 2027),  Features Intersected: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.898,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $327,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 999907000310861,  Location: 3.1 MI E K-18/I-70 JCT (Lat: 39.020278,  Lng: -96.815833),  Route carried "on" structure: Interstate 70,  Year Built: 2006,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 11,700 (year 2007),  Truck Traffic: 19%,  Average Future Daily Traffic: 22,397 (year 2027),  Features Intersected: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.898,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $327,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 999907000310071,  Location: JCT US77/I70, NL (Lat: 38.999444,  Lng: -96.861111),  Route carried "under" structure: US 77,  Year Built: 1959,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 9,660 (year 2007),  Truck Traffic: 21%,  Features Intersected: US77 HIGHWAY,  Facility Carried by Structure: I70 HWY, NL
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 245.533,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.5m (47.6ft)

Find on map >>

Structure Number: 999907000310081,  Location: JCT US77/I70, EB (Lat: 38.999167,  Lng: -96.860833),  Route carried "under" structure: US 77,  Year Built: 1959,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 4,870 (year 2007),  Truck Traffic: 21%,  Features Intersected: US77 HIGHWAY,  Facility Carried by Structure: I70 HWY, EB
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 232.559,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.5m (47.6ft)

Find on map >>

Structure Number: 999907000310091,  Location: WJCT US40 BS/I70 WB (Lat: 39.007500,  Lng: -96.835000),  Route carried "under" structure: Business US 40,  Year Built: 1960,  Structure Length: 4.76m (15.62ft),  Average Daily Traffic: 7,500 (year 2007),  Truck Traffic: 21%,  Features Intersected: US40 BS ROUTE,  Facility Carried by Structure: I70 HWY, WB
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 999907000310101,  Location: WJCT US40 BS/I70 EB (Lat: 39.007500,  Lng: -96.834444),  Route carried "under" structure: Business US 40,  Year Built: 1960,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 7,500 (year 2007),  Truck Traffic: 21%,  Features Intersected: US40 BS ROUTE,  Facility Carried by Structure: I70 HWY, EB
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 999907000310851,  Location: 3.1 MI E K-18/I-70 JCT (Lat: 39.020278,  Lng: -96.815833),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 2,800 (year 2004),  Truck Traffic: 21%,  Features Intersected: EAST STREET,  Facility Carried by Structure: I-70 HWY EB
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>

Structure Number: 999907000310861,  Location: 3.1 MI E K-18/I-70 JCT (Lat: 39.020278,  Lng: -96.815833),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 2,800 (year 2004),  Truck Traffic: 21%,  Features Intersected: EAST STREET,  Facility Carried by Structure: I-70 HWY WB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 28.0m (91.9ft)

Discuss this city on our hugely popular Kansas forum

Back to: Junction City, KS, Kansas, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.