Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Justice, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 200ft / 60.6mTotal length
  • $22,039,000Total costs
  • 168,180Total average daily traffic
  • 51,120Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Justice
  • No street view available for this location

New bridges in Justice, OK - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 91950-1959
  • 11970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Justice, OK
Average Bridge Truck Traffic in Justice, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Very good
  • 63.6%Good
  • 18.2%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 36.4%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Very good
  • 27.3%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 7133,  Location: 1.9 MI S OF SH 20 (Lat: 36.280256,  Lng: -95.543147),  Route carried "on" structure: County highway N4190,  Year Built: 1939,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 375 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2040),  Features Intersected: DOG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $319,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1389,  Location: 13.51 MI.NE OF TP GATE (Lat: 36.300833,  Lng: -95.591111),  Route carried "on" structure: Ramp Other road 44,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 12,730 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 20,368 (year 2040),  Design Load: HS 20,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CLAREMORE INTERCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.756,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $674,000,  Roadway Improvement Cost: $1,011,000,  Total Project Cost: $1,928,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13992,  Location: 13.95 MI.NE OF TP GATE (Lat: 36.305261,  Lng: -95.581489),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.560,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 43.3m (142.1ft),  Out-to-Out Width: 43.9m (144.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.22m (10.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1413,  Location: 15.3 MI.NE OF T P GATE (Lat: 36.314444,  Lng: -95.560556),  Route carried "on" structure: County highway N4180,  Year Built: 1958,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.135,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $897,000,  Total Project Cost: $1,713,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14141,  Location: 17.57 MI.NE OF TP GATE (Lat: 36.329722,  Lng: -95.525556),  Route carried "on" structure: County highway N4200,  Year Built: 1958,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.479,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $936,000,  Total Project Cost: $1,787,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14181,  Location: 12.8 MI NE OF TP GATE (Lat: 36.296528,  Lng: -95.601519),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: HS 20,  Features Intersected: DOG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.792,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,300,000,  Roadway Improvement Cost: $1,950,000,  Total Project Cost: $3,704,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1906,  Location: 3.8 MI S JCT SH 66 (Lat: 36.271822,  Lng: -95.576569),  Route carried "on" structure: State highway 88,  Year Built: 1975,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 3,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,920 (year 2040),  Design Load: HS 20,  Features Intersected: PANTHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.129,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.7m (51.5ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $646,000,  Roadway Improvement Cost: $1,067,000,  Total Project Cost: $1,810,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21078,  Location: 2.8 MI S OF I-44 (Lat: 36.282867,  Lng: -95.543172),  Route carried "on" structure: County highway 6605,  Year Built: 1986,  Status: Posted for load,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 375 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 20,  Features Intersected: PANTHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.72m (25.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $612,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23673,  Location: N4180E0510001 (Lat: 36.277936,  Lng: -95.561081),  Route carried "on" structure: County highway N4180,  Year Built: 1993,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: DOG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $568,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24589,  Location: 2.3 MI E JCT SH 66 (Lat: 36.306944,  Lng: -95.577222),  Route carried "on" structure: State highway 20,  Year Built: 1994,  Status: Open,  Structure Length: 13.29m (43.60ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 18,080 (year 2040),  Design Load: HS 20,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.723,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.48m (50.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,840,000,  Roadway Improvement Cost: $3,035,000,  Total Project Cost: $5,151,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28114,  Location: 1S 3.5E JCT SH20/SH88 (Lat: 36.292778,  Lng: -95.535000),  Route carried "on" structure: County highway E0500,  Year Built: 2012,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: PANTHER CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $555,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 28594,  Location: 1.5S JCT SH66/SH88 (Lat: 36.294414,  Lng: -95.601397),  Route carried "on" structure: State highway 88,  Year Built: 2007,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 3,600 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,760 (year 2040),  Design Load: HL 93,  Features Intersected: DOG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.525,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,261,000,  Roadway Improvement Cost: $2,081,000,  Total Project Cost: $3,532,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13675,  Location: 1.4 MI S JCT. SH 66 (Lat: 36.296164,  Lng: -95.602336),  Route carried "under" structure: State highway 88,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 3,600 (year 2020),  Truck Traffic: 15%,  Features Intersected: S.H. 88 & UP R.R. UNDER,  Facility Carried by Structure: WILL ROGERS TPI-44
Minimum Vertical Clearance: 7.70m (25.26ft),  Kilometerpoint: 17.152,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 1389,  Location: 13.51 MI.NE OF TP GATE (Lat: 36.300833,  Lng: -95.591111),  Route carried "under" structure: Interstate 44,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 24,900 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CLAREMORE INTERCH
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 20.756,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 1413,  Location: 15.3 MI.NE OF T P GATE (Lat: 36.314444,  Lng: -95.560556),  Route carried "under" structure: Interstate 44,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 16,800 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CO. RD. N4180
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 23.974,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 14141,  Location: 17.57 MI.NE OF TP GATE (Lat: 36.329722,  Lng: -95.525556),  Route carried "under" structure: Interstate 44,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 16,800 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CO. RD. N4200
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 27.513,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 24589,  Location: 2.3 MI E JCT SH 66 (Lat: 36.306944,  Lng: -95.577222),  Route carried "under" structure: Interstate 44,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 16,800 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: S.H. 20
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 35.734,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Discuss Justice, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.