Bridge Statistics for Kechi, Kansas (KS) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Kechi, KS, Kansas, Kansas forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 75 meters (246ft) Total costs: $2,276,000 Total average daily traffic: 50,280 Total average daily truck traffic: 7,999 National Bridge Inventory (NBI) Registered Bridges for Kechi
Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 999925400872091, Location: 0.58 MI N 53RD ST, WB (Lat: 37.788056, Lng: -97.283056), Route carried "on" structure: State highway 254, Year Built: 1965, Status: Open, Structure Length: 3.12m (10.24ft), Average Daily Traffic: 4,860 (year 2007), Truck Traffic: 14%, Average Future Daily Traffic: 7,222 (year 2027), Design Load: HS 20, Features Intersected: MIDDLE FORK CHISHOLM CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.812, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 39.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.12m (10.24ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $94,000, Roadway Improvement Cost: $9,000, Total Project Cost: $141,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 999925400872101, Location: 0.57 MI N 53RD ST, EB (Lat: 37.787778, Lng: -97.283056), Route carried "on" structure: State highway 254, Year Built: 1965, Status: Open, Structure Length: 3.12m (10.24ft), Average Daily Traffic: 4,860 (year 2007), Truck Traffic: 14%, Average Future Daily Traffic: 7,222 (year 2027), Design Load: HS 20, Features Intersected: MIDDLE FORK CHISHOLM CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.796, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 39.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.12m (10.24ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $94,000, Roadway Improvement Cost: $9,000, Total Project Cost: $141,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 999925400872111, Location: JCT OLIVER ST/K254 (Lat: 37.791667, Lng: -97.280556), Route carried "on" structure: State highway 254, Year Built: 1965, Status: Open, Structure Length: 7.64m (25.07ft), Average Daily Traffic: 4,860 (year 2007), Truck Traffic: 14%, Average Future Daily Traffic: 7,222 (year 2027), Design Load: HS 20, Features Intersected: RS1904, OLIVER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.309, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.0m (68.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 7.64m (25.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $173,000, Roadway Improvement Cost: $17,000, Total Project Cost: $259,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete Find on map >>
Structure Number: 999925400872121, Location: 0.16 MI E OLIVER ST (Lat: 37.792778, Lng: -97.277778), Route carried "on" structure: State highway 254, Year Built: 1965, Year Reconstructed: 1997, Status: Open, Structure Length: 11.00m (36.09ft), Average Daily Traffic: 4,290 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 10,150 (year 2027), Design Load: HS 20, Features Intersected: OKT RAILROAD & STREAM Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.560, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 5 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 8, Length of Maximum Span: 15.9m (52.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.00m (36.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $332,000, Roadway Improvement Cost: $33,000, Total Project Cost: $498,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete Find on map >>
Structure Number: 999925400874451, Location: JCT OLIVER ST/K-254 (Lat: 37.791667, Lng: -97.280556), Route carried "on" structure: State highway 254, Year Built: 1997, Status: Open, Structure Length: 7.67m (25.16ft), Average Daily Traffic: 4,290 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 10,150 (year 2027), Design Load: HS 25, Features Intersected: RS1904, OLIVER ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.316, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 5 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.0m (68.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.67m (25.16ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $232,000, Roadway Improvement Cost: $23,000, Total Project Cost: $347,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete Find on map >>
Structure Number: 999925400874461, Location: 0.16 MI E OLIVER ST. (Lat: 37.792778, Lng: -97.277778), Route carried "on" structure: State highway 254, Year Built: 1997, Status: Open, Structure Length: 11.00m (36.09ft), Average Daily Traffic: 4,290 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 10,150 (year 2027), Design Load: HS 25, Features Intersected: RR/MID BR CHISHOLM CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.588, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 5 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 8, Length of Maximum Span: 15.9m (52.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 71.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.00m (36.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $332,000, Roadway Improvement Cost: $33,000, Total Project Cost: $498,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 999925400874471, Location: 1.05 MI E OLIVER ST. (Lat: 37.795278, Lng: -97.257222), Route carried "on" structure: City street 2192, Year Built: 1998, Status: Open, Structure Length: 7.79m (25.56ft), Average Daily Traffic: 2,430 (year 2003), Truck Traffic: 2%, Average Future Daily Traffic: 3,329 (year 2027), Design Load: HS 20, Features Intersected: K-254 HWY, Facility Carried by Structure: WOODLAWN ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.4m (86.6ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 85.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 7.79m (25.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $235,000, Roadway Improvement Cost: $24,000, Total Project Cost: $353,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 999925400874481, Location: 1.32 MI E OLIVER ST. (Lat: 37.795278, Lng: -97.253611), Route carried "on" structure: State highway 254, Year Built: 1997, Status: Open, Structure Length: 1.14m (3.74ft), Average Daily Traffic: 8,580 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 20,300 (year 2027), Design Load: HS 20, Features Intersected: TRIB MID FK CHISHOLM CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.414, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 68.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.14m (3.74ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $26,000, Roadway Improvement Cost: $3,000, Total Project Cost: $39,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 999925400872111, Location: JCT OLIVER ST/K254 (Lat: 37.791667, Lng: -97.280556), Route carried "under" structure: City street 1904, Year Built: 1965, Structure Length: 7.64m (25.07ft), Average Daily Traffic: 1,620 (year 2004), Truck Traffic: 21%, Features Intersected: RS1904, OLIVER ST, Facility Carried by Structure: K254 HWY EB Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.0m (68.9ft) Find on map >>
Structure Number: 999925400874451, Location: JCT OLIVER ST/K-254 (Lat: 37.791667, Lng: -97.280556), Route carried "under" structure: City street 1904, Year Built: 1997, Structure Length: 7.67m (25.16ft), Average Daily Traffic: 1,620 (year 2004), Truck Traffic: 21%, Features Intersected: RS1904, OLIVER ST., Facility Carried by Structure: K-254 HWY WB Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.0m (68.9ft) Find on map >>
Structure Number: 999925400874471, Location: 1.05 MI E OLIVER ST. (Lat: 37.795278, Lng: -97.257222), Route carried "under" structure: State highway 254, Year Built: 1998, Structure Length: 7.79m (25.56ft), Average Daily Traffic: 8,580 (year 2007), Truck Traffic: 21%, Features Intersected: K-254 HWY, Facility Carried by Structure: WOODLAWN ST. Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 6.983, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.4m (86.6ft) Discuss this city on our hugely popular Kansas forum Back to: Kechi, KS, Kansas, All US cities.
|
![]() |