Bridge Statistics for La Grange, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: La Grange, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 23
Total length: 31 meters (102ft)
Total costs: $14,505,000
Total average daily traffic: 171,768
Total average daily truck traffic: 11,124
National Bridge Inventory (NBI) Registered Bridges for La Grange

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 6
  • 1940-1949: 4
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 2
  • 1980-1989: 5
  • 1990-1999: 3
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 102715,  Location: 0.3 MI E JCT RTE 55+TSP (Lat: 41.670703,  Lng: -73.783400),  Route carried "on" structure: State highway 55,  Year Built: 1931,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 12,575 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,361 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: SPROUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.818,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $2,221,000,  Roadway Improvement Cost: $1,289,000,  Total Project Cost: $3,510,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 103232,  Location: 1.9 MI N JCT RTE 82+TSP (Lat: 41.650150,  Lng: -73.758100),  Route carried "on" structure: State highway 82,  Year Built: 1929,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 7,090 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,283 (year 2027),  Design Load: H 20,  Features Intersected: JACKSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.813,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $428,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $683,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 104701,  Location: 8.0 MI N JCT RTS 376 & 82 (Lat: 41.654075,  Lng: -73.873164),  Route carried "on" structure: State highway 376,  Year Built: 1992,  Status: Open,  Structure Length: 3.07m (10.07ft),  Average Daily Traffic: 22,527 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,350 (year 2022),  Design Load: HS 20,  Features Intersected: WAPPINGERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.719,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.3m (56.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $279,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 226287,  Location: 3.0 MI NE OF FREEDOM PLAI (Lat: 41.695867,  Lng: -73.771319),  Route carried "on" structure: Other road ,  Year Built: 1975,  Status: Open,  Structure Length: 0.60m (1.97ft),  Average Daily Traffic: 80 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 106 ,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: FREEDOM PK ENT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.3 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $196,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 23433,  Location: 1.3 MI.NE OF ARTHURSBURG (Lat: 41.646833,  Lng: -73.766186),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 809 (year 1996),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,076 (year 2016),  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: EMANS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 7.4m (24.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $206,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33432,  Location: 2MI SW OF VERBANK VILLAGE (Lat: 41.719453,  Lng: -73.746044),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 300 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 399 ,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: GIDLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Serious,  Operating Rating: 81.2 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $270,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334321,  Location: 3.1 MI NE OF FREEDOM PLNS (Lat: 41.708647,  Lng: -73.762889),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 381 (year 1996),  Truck Traffic: 8%,  Average Future Daily Traffic: 507 (year 2016),  Design Load: HS 20,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: SKIDMORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 83.8 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $558,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334322,  Location: 1.3 MI NE OF FREEDOM PLNS (Lat: 41.683942,  Lng: -73.777228),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 411 (year 1996),  Truck Traffic: 8%,  Average Future Daily Traffic: 547 (year 2016),  Design Load: HS 20,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: BARMORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.2 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $558,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334323,  Location: NE JCT OF SH55 & T S PKWY (Lat: 41.675367,  Lng: -73.784744),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 249 (year 1996),  Truck Traffic: 8%,  Average Future Daily Traffic: 331 (year 2016),  Design Load: HS 25,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: VELIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $558,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 334324,  Location: 0.6MI S OF FREEDOM PLNS (Lat: 41.660567,  Lng: -73.796589),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 2,806 (year 1996),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,732 (year 2016),  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: STRINGHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 84.7 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $669,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334325,  Location: 0.9MI S OF FREEDOM PLAINS (Lat: 41.658481,  Lng: -73.798764),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 1,014 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,349 (year 2018),  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: TODD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $542,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334326,  Location: 2.2 MI NW OF ARTHURSBURG (Lat: 41.644167,  Lng: -73.810617),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 11,263 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,336 (year 2026),  Design Load: HS 20,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: COUNTY ROAD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $721,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 334327,  Location: 1.4 MI NW OF ARTHURSBURG (Lat: 41.645172,  Lng: -73.785406),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 2,376 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,446 (year 2018),  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: COUNTY ROAD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $721,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334328,  Location: 1.4 MI NW OF ARTHURSBURG (Lat: 41.642556,  Lng: -73.791797),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 2,388 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,464 (year 2018),  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: COUNTY ROAD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.96m (3.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $340,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336901,  Location: 1.5 MI NW OF ARTHURSBURG (Lat: 41.640992,  Lng: -73.793411),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 2,277 (year 1973),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,028 (year 1993),  Design Load: HS 25,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: COUNTY ROAD 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $461,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 337034,  Location: 500' E JCT RTS.82 & CR 21 (Lat: 41.651667,  Lng: -73.753250),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 0.79m (2.59ft),  Truck Traffic: 8%,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: EAST NOXON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $289,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5027149,  Location: JCT TSP & RTE 55 (Lat: 41.670317,  Lng: -73.788597),  Route carried "on" structure: Other road 987G,  Year Built: 1947,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 21,955 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 28,364 (year 2026),  Design Load: HS 20,  Features Intersected: RTE 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.070,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.8 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $1,077,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5502379,  Location: 1.4 MI NW OF ARTHURSBURG (Lat: 41.644408,  Lng: -73.788003),  Route carried "on" structure: Other road 987G,  Year Built: 1937,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 18,405 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,719 (year 2027),  Design Load: H 20,  Features Intersected: COUNTY ROAD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.175,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.5 metric tons,  Inventory Rating: 25.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $838,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5502389,  Location: 1.4 MI NW OF ARTHURSBURG (Lat: 41.645211,  Lng: -73.788181),  Route carried "on" structure: Other road 987G,  Year Built: 1937,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 18,405 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,719 (year 2027),  Design Load: H 20,  Features Intersected: JACKSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.177,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.6 metric tons,  Inventory Rating: 27.5 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $428,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $683,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5502399,  Location: 0.4 MI SE OF FREEDOM PLNS (Lat: 41.665389,  Lng: -73.789989),  Route carried "on" structure: Other road 987G,  Year Built: 1937,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 18,405 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,719 (year 2027),  Design Load: H 20,  Features Intersected: SPROUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.428,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.7 metric tons,  Inventory Rating: 23.8 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $930,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 550241,  Location: 1.3 MI NE OF FREEDOM PLAI (Lat: 41.688225,  Lng: -73.786292),  Route carried "on" structure: State highway 987G,  Year Built: 1946,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 11,136 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,387 (year 2022),  Design Load: H 20,  Features Intersected: J BAIRD PK ENT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 184.037,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Inventory Rating: 26.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $416,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5027149,  Location: JCT TSP & RTE 55 (Lat: 41.670317,  Lng: -73.788597),  Route carried "under" structure: State highway 55,  Year Built: 1947,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 16,451 (year 2006),  Truck Traffic: 6%,  Features Intersected: RTE 55,  Facility Carried by Structure: RTE 987G
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 10.796,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: 5502379,  Location: 1.4 MI NW OF ARTHURSBURG (Lat: 41.644408,  Lng: -73.788003),  Route carried "under" structure: County highway ,  Year Built: 1937,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 465 (year 1972),  Truck Traffic: 6%,  Features Intersected: COUNTY ROAD 21,  Facility Carried by Structure: RTE 987G
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 11.8m (38.7ft)

Discuss this city on our hugely popular New York forum

Back to: La Grange, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.