![]() |
Bridge Statistics for La Junta, Colorado (CO) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: La Junta, CO, Colorado, Colorado forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 120 meters (394ft) Total costs: $2,012,000 Total average daily traffic: 54,372 Total average daily truck traffic: 4,497 National Bridge Inventory (NBI) Registered Bridges for La Junta
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: LJ 1-THIRD ST., Location: IN LA JUNTA (Lat: 37.986000, Lng: -103.531861), Route carried "on" structure: City street 3RDST, Year Built: 1931, Year Reconstructed: 1949, Status: Open, Structure Length: 5.56m (18.24ft), Average Daily Traffic: 2,705 (year 2004), Truck Traffic: 12%, Average Future Daily Traffic: 2,705 (year 2024), Features Intersected: KING ARROYO, Facility Carried by Structure: THIRD ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.5m (57.4ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 35.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.56m (18.24ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $78,000, Roadway Improvement Cost: $16,000, Total Project Cost: $94,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: LJ 2-SIXTH ST., Location: IN LA JUNTA (Lat: 37.982722, Lng: -103.529778), Route carried "on" structure: City street 6THST, Year Built: 1973, Status: Open, Structure Length: 2.51m (8.23ft), Average Daily Traffic: 2,189 (year 2004), Truck Traffic: 12%, Average Future Daily Traffic: 2,189 (year 2024), Features Intersected: KING ARROYO, Facility Carried by Structure: SIXTH ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.9m (78.4ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 10.3m (33.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 36.3 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.51m (8.23ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $20,000, Roadway Improvement Cost: $17,000, Total Project Cost: $36,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: LJ 3-FIFTH ST., Location: IN LA JUNTA (Lat: 37.983917, Lng: -103.551194), Route carried "on" structure: City street 5THST, Year Built: 1915, Year Reconstructed: 1973, Status: Open, Structure Length: 3.29m (10.79ft), Average Daily Traffic: 3,600 (year 2004), Truck Traffic: 4%, Average Future Daily Traffic: 3,600 (year 2024), Features Intersected: ANDERSON ARROYO, Facility Carried by Structure: FIFTH ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.0m (52.5ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 36.3 metric tons, Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 3.29m (10.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $6,000, Total Project Cost: $6,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: LJ 4-THIRD ST., Location: IN LA JUNTA (Lat: 37.985972, Lng: -103.552194), Route carried "on" structure: City street 3RDST, Year Built: 1931, Year Reconstructed: 1934, Status: Open, Structure Length: 3.74m (12.27ft), Average Daily Traffic: 5,346 (year 2004), Truck Traffic: 12%, Average Future Daily Traffic: 5,346 (year 2024), Features Intersected: ANDERSON ARROYO, Facility Carried by Structure: THIRD ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 11.9m (39.0ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 15.3m (50.2ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Fair, Channel: Satisfactory, Operating Rating: 33.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.66m (15.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,703,000, Roadway Improvement Cost: $170,000, Total Project Cost: $1,874,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: LJ5-A, Location: IN LA JUNTA (Lat: 37.989111, Lng: -103.552694), Route carried "on" structure: City street PRING, Year Built: 1988, Status: Open, Structure Length: 3.14m (10.30ft), Average Daily Traffic: 132 (year 2004), Truck Traffic: 4%, Average Future Daily Traffic: 132 (year 2024), Features Intersected: ANDERSON ARROYO Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 29.9m (98.1ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 68.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.14m (10.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $2,000, Total Project Cost: $2,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: M-22-AY, Location: LA JUNTA (Lat: 37.988333, Lng: -103.532222), Route carried "on" structure: State highway 109A, Year Built: 1967, Status: Open, Structure Length: 44.14m (144.82ft), Average Daily Traffic: 6,100 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 8,662 (year 2025), Design Load: HS 20, Features Intersected: RDWY, RR, ARKANSAS RVR, Facility Carried by Structure: SH 109 ML Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 91.262, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 16, Number Of Approach Spans: 3, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Very good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: M-22-M, Location: IN LAJUNTA (Lat: 37.986944, Lng: -103.553333), Route carried "on" structure: US 50B, Year Built: 1961, Status: Open, Structure Length: 4.27m (14.01ft), Average Daily Traffic: 10,300 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 12,463 (year 2025), Design Load: HS 20, Features Intersected: ANDERSON ARROYO, Facility Carried by Structure: US 50 ML Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 610.036, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 28.3m (92.8ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.9m (45.6ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 22.6m (74.1ft), Out-to-Out Width: 28.0m (91.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: M-22-X, Location: IN LA JUNTA (Lat: 37.987222, Lng: -103.531111), Route carried "on" structure: US 50B, Year Built: 1961, Status: Open, Structure Length: 5.52m (18.11ft), Average Daily Traffic: 4,500 (year 2005), Truck Traffic: 11%, Average Future Daily Traffic: 5,760 (year 2025), Design Load: HS 20, Features Intersected: KING ARROYO, Facility Carried by Structure: US 50 ML Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 612.316, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 19.5m (64.0ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.7m (58.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 18.1m (59.4ft), Out-to-Out Width: 24.1m (79.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: LJ 6-POTTER DR., Location: IN LA JUNTA (Lat: 37.985917, Lng: -103.559889), Route carried "under" structure: City street , Year Built: 1940, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 100 (year 2003), Truck Traffic: 4%, Features Intersected: POTTER STREET, Facility Carried by Structure: AT & SF RR Minimum Vertical Clearance: 0.39m (1.28ft), Kilometerpoint: 3.219, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 6.1m (20.0ft) Find on map >>
Structure Number: LJ 6-POTTER DR., Location: IN LA JUNTA (Lat: 37.985917, Lng: -103.559889), Route carried "under" structure: City street , Year Built: 1940, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 100 (year 2003), Truck Traffic: 4%, Features Intersected: POTTER STREET, Facility Carried by Structure: AT & SF RR Minimum Vertical Clearance: 0.39m (1.28ft), Kilometerpoint: 1.609, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 6.1m (20.0ft) Find on map >>
Structure Number: M-22-AY, Location: LA JUNTA (Lat: 37.988333, Lng: -103.532222), Route carried "under" structure: US 50B, Year Built: 1967, Structure Length: 44.14m (144.82ft), Average Daily Traffic: 4,500 (year 2005), Truck Traffic: 11%, Features Intersected: RDWY, RR, ARKANSAS RVR, Facility Carried by Structure: SH 109 ML Minimum Vertical Clearance: 6.15m (20.18ft), Kilometerpoint: 612.118, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: M-22-R, Location: IN LA JUNTA (Lat: 37.985833, Lng: -103.559444), Route carried "under" structure: US 50B, Year Built: 1934, Structure Length: 2.74m (8.99ft), Average Daily Traffic: 14,800 (year 2005), Truck Traffic: 7%, Features Intersected: BNSF RR, Facility Carried by Structure: BNSF RR Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 609.386, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.4m (44.0ft) Discuss this city on our hugely popular Colorado forum Back to: La Junta, CO, Colorado, All US cities.
|
![]() |