![]() |
Bridge Statistics for Lake City, Florida (FL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Lake City, FL, Florida, Florida forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 64 meters (210ft) Total costs: $570,000 Total average daily traffic: 112,002 Total average daily truck traffic: 19,221 National Bridge Inventory (NBI) Registered Bridges for Lake City
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 290031, Location: US-41/ WASHINGTON ST. (Lat: 30.194722, Lng: -82.639444), Route carried "on" structure: US 41, Year Built: 1958, Status: Open, Structure Length: 2.99m (9.81ft), Average Daily Traffic: 14,100 (year 2006), Truck Traffic: 12%, Average Future Daily Traffic: 24,464 (year 2028), Design Load: HS 20, Features Intersected: WASHINGTON ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.584, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.4m (50.5ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.1m (33.1ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 16.6m (54.5ft), Out-to-Out Width: 21.1m (69.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 65.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 2.99m (9.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $264,000, Roadway Improvement Cost: $26,000, Total Project Cost: $395,000, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 290032, Location: US-41/ WILSON ST. & CSXRR (Lat: 30.196667, Lng: -82.639444), Route carried "on" structure: US 41, Year Built: 1958, Status: Open, Structure Length: 15.88m (52.10ft), Average Daily Traffic: 14,100 (year 2006), Truck Traffic: 12%, Average Future Daily Traffic: 24,464 (year 2028), Design Load: H 20, Features Intersected: WILSON ST. & CSXRR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.731, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.6m (51.2ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 26.2m (86.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 15.6m (51.2ft), Out-to-Out Width: 21.1m (69.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 73.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 290033, Location: 0.3 MI. N. SANTA FE RIVER (Lat: 29.855833, Lng: -82.608611), Route carried "on" structure: US 41, Year Built: 1960, Year Reconstructed: 2002, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 3,700 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 6,420 (year 2028), Design Load: H 15, Features Intersected: COLUMBIA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.253, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.9m (9.5ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 47.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006 Find on map >>
Structure Number: 290035, Location: I-75 NB OVER CR-341 (Lat: 30.146389, Lng: -82.671389), Route carried "on" structure: Interstate 75, Year Built: 1962, Year Reconstructed: 1997, Status: Open, Structure Length: 6.25m (20.51ft), Average Daily Traffic: 23,000 (year 2006), Truck Traffic: 26%, Average Future Daily Traffic: 39,905 (year 2028), Design Load: HS 20, Features Intersected: CR-341 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.302, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.6m (57.7ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.4m (57.1ft), Curb-To-Curb Width: 17.0m (55.8ft), Out-to-Out Width: 18.0m (59.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Superior to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 29006, Location: I-75 SB OVER CR-341 (Lat: 30.146389, Lng: -82.671389), Route carried "on" structure: Interstate 75, Year Built: 1962, Year Reconstructed: 1997, Status: Open, Structure Length: 6.25m (20.51ft), Average Daily Traffic: 23,000 (year 2006), Truck Traffic: 26%, Average Future Daily Traffic: 39,905 (year 2028), Design Load: HS 20, Features Intersected: CR-341 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.282, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.5m (57.4ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.4m (57.1ft), Curb-To-Curb Width: 17.0m (55.8ft), Out-to-Out Width: 18.1m (59.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 46.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Superior to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 2955, Location: E. OF S. MARION STREET (Lat: 30.170000, Lng: -82.637333), Route carried "on" structure: County highway , Year Built: 1970, Status: Closed, Structure Length: 0.76m (2.49ft), Truck Traffic: 1%, Design Load: H 10, Features Intersected: OVERFLOW OF ALLIGATOR LK, Facility Carried by Structure: SE LOQUAY WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.0m (16.4ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.8m (12.5ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Imminent failure, Channel: Satisfactory, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 1999, Bridge Improvement Cost: $110,000, Roadway Improvement Cost: $30,000, Total Project Cost: $175,000, Deck Structure Type: Concrete Precast Panels Find on map >>
Structure Number: 290031, Location: US-41/ WASHINGTON ST. (Lat: 30.194722, Lng: -82.639444), Route carried "under" structure: City street , Year Built: 1958, Structure Length: 2.99m (9.81ft), Average Daily Traffic: 16,000 (year 2002), Truck Traffic: 10%, Features Intersected: WASHINGTON ST., Facility Carried by Structure: US-41 (SR-25) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.772, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 10.1m (33.1ft) Find on map >>
Structure Number: 290032, Location: US-41/ WILSON ST. & CSXRR (Lat: 30.196667, Lng: -82.639444), Route carried "under" structure: City street , Year Built: 1958, Structure Length: 15.88m (52.10ft), Average Daily Traffic: 14,100 (year 2006), Truck Traffic: 12%, Features Intersected: WILSON ST. & CSXRR, Facility Carried by Structure: US-41 (SR-25) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.731, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft) Find on map >>
Structure Number: 290035, Location: I-75 NB OVER CR-341 (Lat: 30.146389, Lng: -82.671389), Route carried "under" structure: County highway 341, Year Built: 1962, Structure Length: 6.25m (20.51ft), Average Daily Traffic: 2,001 (year 2003), Truck Traffic: 10%, Features Intersected: CR-341, Facility Carried by Structure: I-75 NB (SR-93) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.072, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.4m (57.1ft) Find on map >>
Structure Number: 29006, Location: I-75 SB OVER CR-341 (Lat: 30.146389, Lng: -82.671389), Route carried "under" structure: County highway 341, Year Built: 1962, Structure Length: 6.25m (20.51ft), Average Daily Traffic: 2,001 (year 2003), Truck Traffic: 10%, Features Intersected: CR-341, Facility Carried by Structure: I-75 SB (SR-93) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.043, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.4m (57.1ft) Discuss this city on our hugely popular Florida forum Back to: Lake City, FL, Florida, All US cities.
|
![]() |