![]() |
Bridge Statistics for Lakeville, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Lakeville, MA, Massachusetts, Massachusetts forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 26 meters (85ft) Total costs: $7,003,000 Total average daily traffic: 80,910 Total average daily truck traffic: 8,769 Total future (year 2027) average daily traffic: 127,780 National Bridge Inventory (NBI) Registered Bridges for Lakeville
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: L01001419MHD634, Location: 1.8 MI NW OF FRETWN T.L. (Lat: 41.798397, Lng: -70.997253), Route carried "on" structure: City street , Year Built: 1984, Status: Open, Structure Length: 2.35m (7.71ft), Average Daily Traffic: 2,350 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 3,711 (year 2028), Design Load: HS 20+Mod, Features Intersected: RR CSX, Facility Carried by Structure: HWY HOWLAND RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 14.8m (48.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $124,000, Roadway Improvement Cost: $13,000, Total Project Cost: $187,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: L01003AFEMUNNBI, Location: MIDDLEBORO TOWN LINE (Lat: 41.859325, Lng: -70.917350), Route carried "on" structure: City street , Year Built: 2002, Status: Open, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 1,300 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 2,053 (year 2027), Design Load: HS 20, Features Intersected: WATER NEMASKET RIVER, Facility Carried by Structure: HWY VAUGHN ST Minimum Vertical Clearance: 99.00m (324.80ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.3m (56.8ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 64.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: L0100547FMHDNBI, Location: .7 M S OF MIDDLEBORO TL (Lat: 41.886892, Lng: -70.956894), Route carried "on" structure: State highway 18, Year Built: 1931, Status: Open, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 15,900 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 25,111 (year 2028), Design Load: H 20, Features Intersected: RR MBTA/CSX Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.400, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 11.0m (36.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 12.3m (40.4ft), Out-to-Out Width: 14.9m (48.9ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 60.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.40m (11.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $905,000, Roadway Improvement Cost: $91,000, Total Project Cost: $1,358,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: L0100844FMUNNBI, Location: .5 MI SW OF PIERCE ST (Lat: 41.819969, Lng: -71.027442), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 2,460 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 3,885 (year 2028), Design Load: H 20, Features Intersected: WATER CEDAR SWAMP RIVER, Facility Carried by Structure: HWY MALBONE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.966, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 36.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: May 2007, Underwater Inspection Date: August 2007, Bridge Improvement Cost: $263,000, Roadway Improvement Cost: $27,000, Total Project Cost: $395,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: L010093NRMHDNBI, Location: AT ST 140 (Lat: 41.803964, Lng: -70.962625), Route carried "on" structure: State highway 140, Year Built: 1958, Status: Open, Structure Length: 2.96m (9.71ft), Average Daily Traffic: 20,000 (year 2008), Truck Traffic: 10%, Average Future Daily Traffic: 31,586 (year 2029), Design Load: H 20, Features Intersected: HWY COUNTY ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.627, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 15.5m (50.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 42.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 18.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.00m (9.84ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $831,000, Roadway Improvement Cost: $84,000, Total Project Cost: $1,247,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: L010103X6MHDNBI, Location: 1.2 MI NE OF COUNTY ST (Lat: 41.818758, Lng: -70.969025), Route carried "on" structure: Other road , Year Built: 1958, Year Reconstructed: 2005, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 5,300 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 8,370 (year 2027), Design Load: HS 20, Features Intersected: ST140 NB, Facility Carried by Structure: HWY HIGHLAND RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.575, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.4m (4.6ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $1,093,000, Roadway Improvement Cost: $110,000, Total Project Cost: $1,640,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: L010113YPMHDNBI, Location: 1.5 MI SE OF TAUNTON T.L. (Lat: 41.828214, Lng: -70.984839), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 1.92m (6.30ft), Average Daily Traffic: 2,200 (year 2006), Truck Traffic: 12%, Average Future Daily Traffic: 3,474 (year 2027), Design Load: H 20, Features Intersected: ST140 NB, Facility Carried by Structure: HWY PICKENS ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.0m (59.1ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.6m (41.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $309,000, Roadway Improvement Cost: $31,000, Total Project Cost: $464,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: L0101244EMUNNBI, Location: 0.7 M EAST OF RTE 105 (Lat: 41.870633, Lng: -70.914228), Route carried "on" structure: City street , Year Built: 1968, Status: Open, Structure Length: 2.47m (8.10ft), Average Daily Traffic: 3,200 (year 2008), Truck Traffic: 10%, Average Future Daily Traffic: 5,054 (year 2027), Design Load: H 20, Features Intersected: WATER NEMASKET RIVER, Facility Carried by Structure: HWY BRIDGE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.6m (41.3ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.50m (8.20ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: March 2008, Underwater Inspection Date: August 2007, Bridge Improvement Cost: $386,000, Roadway Improvement Cost: $39,000, Total Project Cost: $580,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: L010133NTMHDNBI, Location: AT ST140 (Lat: 41.803964, Lng: -70.962625), Route carried "on" structure: State highway 140, Year Built: 1969, Status: Open, Structure Length: 2.90m (9.51ft), Average Daily Traffic: 20,000 (year 2008), Truck Traffic: 11%, Average Future Daily Traffic: 31,586 (year 2029), Design Load: H 20, Features Intersected: HWY COUNTY ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.627, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.7m (90.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.00m (9.84ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $155,000, Roadway Improvement Cost: $16,000, Total Project Cost: $233,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: L010143X7MHDNBI, Location: 1.2 MI NE OF COUNTY ST (Lat: 41.818758, Lng: -70.969025), Route carried "on" structure: City street , Year Built: 1969, Year Reconstructed: 2005, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 6,000 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 9,476 (year 2027), Design Load: HS 20, Features Intersected: ST140 SB, Facility Carried by Structure: HWY HIGHLAND AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.575, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.7m (90.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 15.1m (49.5ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.90m (9.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $150,000, Roadway Improvement Cost: $16,000, Total Project Cost: $226,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: L010153YQMHDNBI, Location: 1.5 MI SE OF TAUNTON T.L. (Lat: 41.828214, Lng: -70.984839), Route carried "on" structure: City street , Year Built: 1969, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 2,200 (year 2006), Truck Traffic: 12%, Average Future Daily Traffic: 3,474 (year 2027), Design Load: H 20, Features Intersected: ST140 SB, Facility Carried by Structure: HWY PICKENS ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.6m (41.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.90m (9.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $448,000, Roadway Improvement Cost: $45,000, Total Project Cost: $673,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Discuss this city on our hugely popular Massachusetts forum Back to: Lakeville, MA, Massachusetts, All US cities.
|
![]() |