National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 26 meters (85ft)
Total costs: $7,003,000
Total average daily traffic: 80,910
Total average daily truck traffic: 8,769
Total future (year 2027) average daily traffic: 127,780
National Bridge Inventory (NBI) Registered Bridges for Lakeville

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 4
  • 1960-1969: 4
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 0
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: L01001419MHD634,  Location: 1.8 MI NW OF FRETWN T.L. (Lat: 41.798397,  Lng: -70.997253),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 2,350 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,711 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY HOWLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $187,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: L01003AFEMUNNBI,  Location: MIDDLEBORO TOWN LINE (Lat: 41.859325,  Lng: -70.917350),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 1,300 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,053 (year 2027),  Design Load: HS 20,  Features Intersected: WATER NEMASKET RIVER,  Facility Carried by Structure: HWY VAUGHN ST
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: L0100547FMHDNBI,  Location: .7 M S OF MIDDLEBORO TL (Lat: 41.886892,  Lng: -70.956894),  Route carried "on" structure: State highway 18,  Year Built: 1931,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 15,900 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 25,111 (year 2028),  Design Load: H 20,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.400,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $905,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,358,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: L0100844FMUNNBI,  Location: .5 MI SW OF PIERCE ST (Lat: 41.819969,  Lng: -71.027442),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,460 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,885 (year 2028),  Design Load: H 20,  Features Intersected: WATER CEDAR SWAMP RIVER,  Facility Carried by Structure: HWY MALBONE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2007,  Underwater Inspection Date: August 2007,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $395,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: L010093NRMHDNBI,  Location: AT ST 140 (Lat: 41.803964,  Lng: -70.962625),  Route carried "on" structure: State highway 140,  Year Built: 1958,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 20,000 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,586 (year 2029),  Design Load: H 20,  Features Intersected: HWY COUNTY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.627,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $831,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,247,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: L010103X6MHDNBI,  Location: 1.2 MI NE OF COUNTY ST (Lat: 41.818758,  Lng: -70.969025),  Route carried "on" structure: Other road ,  Year Built: 1958,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 5,300 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,370 (year 2027),  Design Load: HS 20,  Features Intersected: ST140 NB,  Facility Carried by Structure: HWY HIGHLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,093,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,640,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: L010113YPMHDNBI,  Location: 1.5 MI SE OF TAUNTON T.L. (Lat: 41.828214,  Lng: -70.984839),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 2,200 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,474 (year 2027),  Design Load: H 20,  Features Intersected: ST140 NB,  Facility Carried by Structure: HWY PICKENS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $464,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: L0101244EMUNNBI,  Location: 0.7 M EAST OF RTE 105 (Lat: 41.870633,  Lng: -70.914228),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 3,200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,054 (year 2027),  Design Load: H 20,  Features Intersected: WATER NEMASKET RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2008,  Underwater Inspection Date: August 2007,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $580,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: L010133NTMHDNBI,  Location: AT ST140 (Lat: 41.803964,  Lng: -70.962625),  Route carried "on" structure: State highway 140,  Year Built: 1969,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 20,000 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 31,586 (year 2029),  Design Load: H 20,  Features Intersected: HWY COUNTY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.627,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $155,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $233,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: L010143X7MHDNBI,  Location: 1.2 MI NE OF COUNTY ST (Lat: 41.818758,  Lng: -70.969025),  Route carried "on" structure: City street ,  Year Built: 1969,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 6,000 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,476 (year 2027),  Design Load: HS 20,  Features Intersected: ST140 SB,  Facility Carried by Structure: HWY HIGHLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $226,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: L010153YQMHDNBI,  Location: 1.5 MI SE OF TAUNTON T.L. (Lat: 41.828214,  Lng: -70.984839),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 2,200 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,474 (year 2027),  Design Load: H 20,  Features Intersected: ST140 SB,  Facility Carried by Structure: HWY PICKENS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $673,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up

Discuss this city on our hugely popular Massachusetts forum

Back to: Lakeville, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.