National Bridge Inventory (NBI) Statistics
Number of bridges: 50
Total length: 515 meters (1,690ft)
Total costs: $8,062,000
Total average daily traffic: 567,880
Total average daily truck traffic: 105,980
National Bridge Inventory (NBI) Registered Bridges for Laurel

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 10
  • 1960-1969: 18
  • 1970-1979: 3
  • 1980-1989: 4
  • 1990-1999: 5
  • 2000-2010: 8

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 11000590340916A,  Location: 2.2 MI N US 11 (Lat: 31.661856,  Lng: -89.159792),  Route carried "on" structure: Interstate 59,  Year Built: 1960,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 27,000 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.860,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $351,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340916B,  Location: 2.2 MI N US 11 (Lat: 31.661856,  Lng: -89.159792),  Route carried "on" structure: Interstate 59,  Year Built: 1960,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 27,000 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.860,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $351,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340920A,  Location: I 59 OVER US 11 (Lat: 31.663925,  Lng: -89.159233),  Route carried "on" structure: Interstate 59,  Year Built: 1960,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 27,000 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: US 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.357,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $335,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340920B,  Location: I 59 OVER US 11 (Lat: 31.663925,  Lng: -89.159233),  Route carried "on" structure: Interstate 59,  Year Built: 1960,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 27,000 (year 2027),  Design Load: HS 20,  Features Intersected: US 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.357,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $335,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340940A,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.684167,  Lng: -89.139167),  Route carried "on" structure: Interstate 59,  Year Built: 2009,  Status: Open,  Structure Length: 60.33m (197.93ft),  Average Daily Traffic: 18,500 (year 2008),  Truck Traffic: 30%,  Average Future Daily Traffic: 27,750 (year 2028),  Design Load: HS 20,  Features Intersected: US 11/AL GREAT SOUTH RR
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 34.900,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340940B,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.684167,  Lng: -89.139167),  Route carried "on" structure: Interstate 59,  Year Built: 2009,  Status: Open,  Structure Length: 60.33m (197.93ft),  Average Daily Traffic: 18,500 (year 2008),  Truck Traffic: 30%,  Average Future Daily Traffic: 27,750 (year 2028),  Design Load: HS 20,  Features Intersected: US 11/AL GREAT SOUTH RR
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 34.900,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340947,  Location: 0.9 MI N JCT US 84/SR 15 (Lat: 31.684767,  Lng: -89.130547),  Route carried "on" structure: Interstate 59,  Year Built: 1960,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 39,000 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 58,500 (year 2027),  Design Load: HS 20,  Features Intersected: 4TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.669,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $317,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340948,  Location: 1.0 MI N JCT US 84/SR 15 (Lat: 31.685258,  Lng: -89.128744),  Route carried "on" structure: Interstate 59,  Year Built: 1960,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 39,000 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 58,500 (year 2027),  Design Load: HS 20,  Features Intersected: MASONITE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.845,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $317,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340951,  Location: 1.3 MI N JCT US84/SR15 (Lat: 31.686347,  Lng: -89.125156),  Route carried "on" structure: Interstate 59,  Year Built: 1959,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 39,000 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 58,500 (year 2027),  Design Load: HS 20,  Features Intersected: WALTERS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.200,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $559,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340952,  Location: I 59 OVER SR 15 SOUTH (Lat: 31.687161,  Lng: -89.123175),  Route carried "on" structure: Interstate 59,  Year Built: 1959,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 39,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 58,500 (year 2027),  Design Load: HS 20,  Features Intersected: SR 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.405,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,200,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340961,  Location: I 59 OVER US 84 EAST (Lat: 31.697325,  Lng: -89.117047),  Route carried "on" structure: Interstate 59,  Year Built: 1959,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 39,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 58,500 (year 2027),  Design Load: HS 20,  Features Intersected: US 84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.801,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $359,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340970A,  Location: 1.0 MI N US 84 (Lat: 31.709672,  Lng: -89.112578),  Route carried "on" structure: Interstate 59,  Year Built: 1959,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 11,000 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 16,500 (year 2027),  Design Load: HS 20,  Features Intersected: TALLAHALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.256,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.29m (60.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $630,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $760,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11000590340970B,  Location: 1.0 MI N US 84 (Lat: 31.709672,  Lng: -89.112578),  Route carried "on" structure: Interstate 59,  Year Built: 1959,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 11,000 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 16,500 (year 2027),  Design Load: HS 20,  Features Intersected: TALLAHALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.256,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.29m (60.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $630,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $760,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 17000590340940C,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.685556,  Lng: -89.136667),  Route carried "on" structure: Ramp Interstate 59,  Year Built: 2009,  Status: Open,  Structure Length: 11.10m (36.42ft),  Average Daily Traffic: 1,000 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2028),  Design Load: HS 20,  Features Intersected: PEDESTRIAN/BICYCLE PATH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 17000590340940D,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.685556,  Lng: -89.136389),  Route carried "on" structure: Ramp Interstate 59,  Year Built: 2009,  Status: Open,  Structure Length: 14.88m (48.82ft),  Average Daily Traffic: 1,000 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2028),  Design Load: HS 20,  Features Intersected: MAGNOLIA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.000,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 17000590340940E,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.683889,  Lng: -89.137500),  Route carried "on" structure: Ramp Interstate 59,  Year Built: 2009,  Status: Open,  Structure Length: 15.09m (49.51ft),  Average Daily Traffic: 1,000 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2028),  Design Load: HS 20,  Features Intersected: ROYAL/MAGNOLIA STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.000,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.2m (135.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 21000840341515,  Location: 0.3 MI E I 59 (Lat: 31.697325,  Lng: -89.112908),  Route carried "on" structure: US 84,  Year Built: 1981,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 17,000 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 25,500 (year 2027),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.457,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 10,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 21000840341517,  Location: 0.5 MI E I 59 (Lat: 31.697111,  Lng: -89.110119),  Route carried "on" structure: US 84,  Year Built: 1981,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 20.18m (66.21ft),  Average Daily Traffic: 17,000 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 25,500 (year 2027),  Design Load: HS 20,  Features Intersected: TALLAHALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.725,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 90.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 10,  Underwater Inspection Date: June 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 31000150340801,  Location: 0.6 MI S I 59 (Lat: 31.681111,  Lng: -89.115833),  Route carried "on" structure: State highway 15,  Year Built: 1983,  Status: Open,  Structure Length: 20.79m (68.21ft),  Average Daily Traffic: 5,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,650 (year 2027),  Design Load: HS 20,  Features Intersected: TALLAHALLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.970,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 15,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.79m (68.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 10,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $277,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 31000150340804,  Location: 0.3 MI S I 59 (Lat: 31.682778,  Lng: -89.119444),  Route carried "on" structure: State highway 15,  Year Built: 1983,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 5,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,650 (year 2027),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.410,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 10,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $240,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 31000150340826,  Location: US84/SR15 OVER I 59 (Lat: 31.684167,  Lng: -89.146667),  Route carried "on" structure: State highway 15,  Year Built: 1960,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 2,650 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,975 (year 2027),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.150,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 10,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $353,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 31005370340021,  Location: 2.1 MI N OF 5TH AVE (Lat: 31.768333,  Lng: -89.099167),  Route carried "on" structure: State highway 537,  Year Built: 1999,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 2,700 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,050 (year 2027),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.376,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 10,  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 51000590340925,  Location: 1.2 MI S JCT US 84/SR 15 (Lat: 31.670833,  Lng: -89.174444),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 2,000 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2027),  Design Load: H 15,  Features Intersected: I 59,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 34.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $258,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 51000590340939,  Location: 0.2 MI E JCT US 84/SR 15 (Lat: 31.683908,  Lng: -89.142753),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 400 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 600 (year 2027),  Design Load: HS 20,  Features Intersected: I 59,  Facility Carried by Structure: 13TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: SA3400000000112,  Location: SEC 5 T 8N R11W (Lat: 31.695833,  Lng: -89.128444),  Route carried "on" structure: City street 1049,  Year Built: 1940,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 900 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,350 (year 2027),  Design Load: HS 15,  Features Intersected: GARDINER PARK TRIBUTARY,  Facility Carried by Structure: 6TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: SA3400000000113,  Location: SEC 5 T 8N R11W (Lat: 31.694806,  Lng: -89.119889),  Route carried "on" structure: City street 8104,  Year Built: 1993,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 400 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 600 (year 2027),  Design Load: HS 20,  Features Intersected: TRIB OF TALLAHALA CREEK,  Facility Carried by Structure: VICTORIA AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: SA3400000000114,  Location: SEC 6 T 8N R11W (Lat: 31.685833,  Lng: -89.131444),  Route carried "on" structure: City street 8098,  Year Built: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 900 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,350 (year 2027),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: JEFFERSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: SA340000000013,  Location: SEC 12 T 8N R12W (Lat: 31.667778,  Lng: -89.155306),  Route carried "on" structure: City street 1139,  Year Built: 1974,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,400 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,600 (year 2027),  Design Load: H 15,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: WEST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $74,000 ( Estimate for 2009),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: SA3400000000131,  Location: SEC 12 T 8N R12W (Lat: 31.670861,  Lng: -89.152778),  Route carried "on" structure: City street 8095,  Year Built: 2003,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,700 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,550 (year 2027),  Design Load: HS 20,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: AIRPORT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: SA3400000000132,  Location: SEC 13 T 8N R12W (Lat: 31.661278,  Lng: -89.155389),  Route carried "on" structure: City street 791,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 420 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 630 (year 2027),  Design Load: H 15,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: DONCURT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $95,000 ( Estimate for 2009),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: SA3400000000174,  Location: SEC 31 T 9N R11W (Lat: 31.701056,  Lng: -89.131250),  Route carried "on" structure: City street 853,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 4,600 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,900 (year 2027),  Design Load: H 15,  Features Intersected: GARDINER PARK TRIBUTARY,  Facility Carried by Structure: 5TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2009,  Other Special Inspection Date: November 2009,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $95,000 ( Estimate for 2009),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: SA3400000000175,  Location: SEC 32 T 9N R11W (Lat: 31.700556,  Lng: -89.130556),  Route carried "on" structure: City street 8069,  Year Built: 1970,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,900 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,850 (year 2027),  Design Load: HS 15,  Features Intersected: GARDINER TRIBUTARY,  Facility Carried by Structure: 10TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: SA3400000000176,  Location: SEC 32 T 9N R11W (Lat: 31.699694,  Lng: -89.129694),  Route carried "on" structure: City street 1050,  Year Built: 1999,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2007),  Average Future Daily Traffic: 150 (year 2027),  Design Load: HS 20,  Features Intersected: GARDINER PARK TRIBUTARY,  Facility Carried by Structure: 4TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: SA3400000000225,  Location: SEC 5 T 8N R11W (Lat: 31.694333,  Lng: -89.123361),  Route carried "on" structure: City street 9416,  Year Built: 1958,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,300 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,950 (year 2027),  Design Load: HS 15,  Features Intersected: TRIB.OF TALLAHALA CREEK,  Facility Carried by Structure: COOKS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.110,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: SA3400000000226,  Location: SEC 18 T 9N R11W (Lat: 31.748111,  Lng: -89.138694),  Route carried "on" structure: City street 8061,  Year Built: 1997,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,800 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,200 (year 2027),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: UNIVERSITY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.180,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: SA340000000023,  Location: SEC 32 T 9N R11W (Lat: 31.700472,  Lng: -89.130500),  Route carried "on" structure: City street 1850,  Year Built: 1972,  Status: Closed,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 15 (year 2027),  Design Load: H 10,  Features Intersected: GARDINER PARK TRIBUTARY,  Facility Carried by Structure: ALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.822,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Very good,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $26,000 ( Estimate for 2009),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 11000590340920A,  Location: I 59 OVER US 11 (Lat: 31.663925,  Lng: -89.159233),  Route carried "under" structure: US 11,  Year Built: 1960,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 8,100 (year 2007),  Truck Traffic: 8%,  Features Intersected: US 11,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 29.651,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 11000590340920B,  Location: I 59 OVER US 11 (Lat: 31.663925,  Lng: -89.159233),  Route carried "under" structure: US 11,  Year Built: 1960,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 8,100 (year 2007),  Truck Traffic: 8%,  Features Intersected: US 11,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 29.651,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 11000590340940A,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.684167,  Lng: -89.139167),  Route carried "under" structure: US 11,  Year Built: 2009,  Structure Length: 60.33m (197.93ft),  Average Daily Traffic: 6,000 (year 2008),  Truck Traffic: 8%,  Features Intersected: US 11/AL GREAT SOUTH RR,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 9.38m (30.77ft),  Kilometerpoint: 3.195,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>

Structure Number: 11000590340940B,  Location: 0.5 MI N JCT US 84/SR 15 (Lat: 31.684167,  Lng: -89.139167),  Route carried "under" structure: US 11,  Year Built: 2009,  Structure Length: 60.33m (197.93ft),  Average Daily Traffic: 6,000 (year 2008),  Truck Traffic: 8%,  Features Intersected: US 11/AL GREAT SOUTH RR,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 8.47m (27.79ft),  Kilometerpoint: 3.195,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>

Structure Number: 11000590340952,  Location: I 59 OVER SR 15 SOUTH (Lat: 31.687161,  Lng: -89.123175),  Route carried "under" structure: State highway 15,  Year Built: 1959,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 5,100 (year 2007),  Truck Traffic: 8%,  Features Intersected: SR 15,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 34.122,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>

Structure Number: 11000590340961,  Location: I 59 OVER US 84 EAST (Lat: 31.697325,  Lng: -89.117047),  Route carried "under" structure: US 84,  Year Built: 1959,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 7,500 (year 2007),  Truck Traffic: 8%,  Features Intersected: US 84,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 26.057,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>

Structure Number: 11000590340961,  Location: I 59 OVER US 84 EAST (Lat: 31.697325,  Lng: -89.117047),  Route carried "under" structure: US 84,  Year Built: 1959,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 7,500 (year 2007),  Truck Traffic: 8%,  Features Intersected: US 84,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 26.057,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>

Structure Number: 21000110341048,  Location: IN LAUREL (Lat: 31.695189,  Lng: -89.125025),  Route carried "under" structure: US 11,  Year Built: 1935,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 8,200 (year 2008),  Truck Traffic: 8%,  Features Intersected: US 11,  Facility Carried by Structure: ABANDONED RR
Minimum Vertical Clearance: 4.16m (13.65ft),  Kilometerpoint: 34.652,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>

Structure Number: 31000150340826,  Location: US84/SR15 OVER I 59 (Lat: 31.684167,  Lng: -89.146667),  Route carried "under" structure: Interstate 59,  Year Built: 1960,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 20%,  Features Intersected: I 59,  Facility Carried by Structure: US84/SR15
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 34.089,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: 31000150340826,  Location: US84/SR15 OVER I 59 (Lat: 31.684167,  Lng: -89.146667),  Route carried "under" structure: Interstate 59,  Year Built: 1960,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 20%,  Features Intersected: I 59,  Facility Carried by Structure: US84/SR15
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 34.089,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: 51000590340925,  Location: 1.2 MI S JCT US 84/SR 15 (Lat: 31.670833,  Lng: -89.174444),  Route carried "under" structure: Interstate 59,  Year Built: 1960,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 0.48m (1.57ft),  Kilometerpoint: 3.212,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>

Structure Number: 51000590340925,  Location: 1.2 MI S JCT US 84/SR 15 (Lat: 31.670833,  Lng: -89.174444),  Route carried "under" structure: Interstate 59,  Year Built: 1960,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 3.212,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>

Structure Number: 51000590340939,  Location: 0.2 MI E JCT US 84/SR 15 (Lat: 31.683908,  Lng: -89.142753),  Route carried "under" structure: Interstate 59,  Year Built: 1960,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 19,500 (year 2007),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: 13TH AVE
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 34.444,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: 51000590340939,  Location: 0.2 MI E JCT US 84/SR 15 (Lat: 31.683908,  Lng: -89.142753),  Route carried "under" structure: Interstate 59,  Year Built: 1960,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 19,500 (year 2007),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: 13TH AVE
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 34.444,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Mississippi forum

Back to: Laurel, MS, Mississippi, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.