U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Lawnside, New Jersey (NJ) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Lawnside, NJ, New Jersey, New Jersey forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 81 meters (266ft)
Total costs: $5,781,000
Total average daily traffic: 624,422
Total average daily truck traffic: 56,745
National Bridge Inventory (NBI) Registered Bridges for Lawnside

New bridges - Historical Statistics

  • 1950-1959: 6
  • 1960-1969: 5
  • 1970-1979: 0
  • 1980-1989: 5

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: 42915,  Location: AT I-295 EXIT 30 (Lat: 39.872500,  Lng: -75.037778),  Route carried "on" structure: County highway 669,  Year Built: 1962,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 13,370 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,720 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: I-295,  Facility Carried by Structure: WARWICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.516,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2003),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 429151,  Location: 1 MI.NORTH OF U.S.RT.30 (Lat: 39.871667,  Lng: -75.033333),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 320 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 425 (year 2026),  Design Load: HS 20,  Features Intersected: I-295,  Facility Carried by Structure: LUNDY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.0m (72.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 429154,  Location: 3.1 MI SOUTH OF RT 70 (Lat: 39.875000,  Lng: -75.016667),  Route carried "on" structure: Interstate 295,  Year Built: 1962,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 57,683 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 69,219 (year 2027),  Design Load: HS 20,  Features Intersected: I295 SB & RAMPB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.322,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 46D005,  Location: 1.5 MI S OF RT 295&561 JC (Lat: 39.859433,  Lng: -75.015950),  Route carried "on" structure: County highway 544,  Year Built: 1980,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 15,218 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,260 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: COOPER RIVER,  Facility Carried by Structure: EVESHAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.560,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M02771,  Location: 1.75 MI NORTH OF EXIT 3 (Lat: 39.865000,  Lng: -75.043333),  Route carried "on" structure: Other road NJTPK,  Year Built: 1950,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 64,310 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 89,390 (year 2026),  Design Load: HS 20,  Features Intersected: PRSL RR, ATLANTIC AVE,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.579,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $2,310,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $4,859,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: M02795,  Location: 2 MI NORTH OF EXIT 3 (Lat: 39.865000,  Lng: -75.038333),  Route carried "on" structure: Other road NJTPK,  Year Built: 1950,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 64,300 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 88,700 (year 2026),  Design Load: HS 20,  Features Intersected: US 30 (WHITE HORSE PIKE),  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.965,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: M02819,  Location: 2.2 MI NORTH OF EXIT 3 (Lat: 39.866667,  Lng: -75.035000),  Route carried "on" structure: County highway 669,  Year Built: 1950,  Status: Open,  Structure Length: 5.40m (17.72ft),  Average Daily Traffic: 3,000 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,100 (year 2026),  Design Load: H 20,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: WARRICK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.856,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $541,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: M0292,  Location: NEAR WOODCREST STATION (Lat: 39.871667,  Lng: -75.018333),  Route carried "on" structure: Other road NJTPK,  Year Built: 1982,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 64,310 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 89,390 (year 2026),  Design Load: HS 20,  Features Intersected: I-295 RAMPS AD, B, & C,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.961,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 40.5m (132.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 38.4m (126.0ft),  Out-to-Out Width: 40.3m (132.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.20m (49.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $380,000 ( Estimate for 2002),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: 42915,  Location: AT I-295 EXIT 30 (Lat: 39.872500,  Lng: -75.037778),  Route carried "under" structure: Interstate 295,  Year Built: 1962,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 115,366 (year 2007),  Truck Traffic: 9%,  Features Intersected: I-295,  Facility Carried by Structure: WARWICK ROAD
Minimum Vertical Clearance: 4.76m (15.62ft),  Kilometerpoint: 49.326,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>

Structure Number: 429151,  Location: 1 MI.NORTH OF U.S.RT.30 (Lat: 39.871667,  Lng: -75.033333),  Route carried "under" structure: Interstate 295,  Year Built: 1962,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 122,895 (year 2006),  Truck Traffic: 9%,  Features Intersected: I-295,  Facility Carried by Structure: LUNDY STREET
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 49.793,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.0m (72.2ft)

Find on map >>

Structure Number: M02771,  Location: 1.75 MI NORTH OF EXIT 3 (Lat: 39.865000,  Lng: -75.043333),  Route carried "under" structure: County highway 727,  Year Built: 1950,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 850 (year 2006),  Features Intersected: PRSL RR, ATLANTIC AVE,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 44.579,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>

Structure Number: M02795,  Location: 2 MI NORTH OF EXIT 3 (Lat: 39.865000,  Lng: -75.038333),  Route carried "under" structure: US 30,  Year Built: 1950,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 35,500 (year 2006),  Features Intersected: US 30 (WHITE HORSE PIKE),  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 4.71m (15.45ft),  Kilometerpoint: 14.211,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>

Structure Number: M02819,  Location: 2.2 MI NORTH OF EXIT 3 (Lat: 39.866667,  Lng: -75.035000),  Route carried "under" structure: Other road NJTPK,  Year Built: 1950,  Structure Length: 5.40m (17.72ft),  Average Daily Traffic: 64,300 (year 2006),  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: WARRICK RD
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 45.255,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.9m (52.2ft)

Find on map >>

Structure Number: M0292,  Location: NEAR WOODCREST STATION (Lat: 39.871667,  Lng: -75.018333),  Route carried "under" structure: Ramp Interstate 295,  Year Built: 1982,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 1,000 (year ),  Features Intersected: I-295 RAMPS AD, B, & C,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 51.081,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Slab,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: M0292,  Location: NEAR WOODCREST STATION (Lat: 39.871667,  Lng: -75.018333),  Route carried "under" structure: Ramp Interstate 295,  Year Built: 1982,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 1,000 (year ),  Features Intersected: I-295 RAMPS AD, B, & C,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 0.45m (1.48ft),  Kilometerpoint: 50.694,  Lanes on structure: 4,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Slab,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: M0292,  Location: NEAR WOODCREST STATION (Lat: 39.871667,  Lng: -75.018333),  Route carried "under" structure: Ramp Interstate 295,  Year Built: 1982,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 1,000 (year ),  Features Intersected: I-295 RAMPS AD, B, & C,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 0.47m (1.54ft),  Kilometerpoint: 50.694,  Lanes on structure: 4,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Slab,  Length of Maximum Span: 31.4m (103.0ft)

Discuss this city on our hugely popular New Jersey forum

Back to: Lawnside, NJ, New Jersey, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.