U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Lawrence, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Lawrence, MA, Massachusetts, Massachusetts forum, All US cities.





Parts: 1, 2


National Bridge Inventory (NBI) Statistics
Number of bridges: 42
Total length: 248 meters (814ft)
Total costs: $130,015,000
Total average daily traffic: 1,711,744
Total average daily truck traffic: 160,962
Total future (year 2031) average daily traffic: 2,666,087
National Bridge Inventory (NBI) Registered Bridges for Lawrence
No street view available for this location

New bridges - Historical Statistics

  • Before 1900: 4
  • 1900-1909: 2
  • 1910-1919: 4
  • 1920-1929: 3
  • 1930-1939: 8
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 13
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 6
  • 2010-2012: 1

Reconstructed bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 4
  • 1990-1999: 4
  • 2000-2009: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: L040012YHDOTNBI,  Location: AT MERRIMAC RIVER (Lat: 42.701258,  Lng: -71.165681),  Route carried "on" structure: State highway 28,  Year Built: 1935,  Status: Open,  Structure Length: 18.20m (59.71ft),  Average Daily Traffic: 24,350 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 38,456 (year 2032),  Design Load: H 20,  Features Intersected: WATER MERRIMACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 237.618,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.8m (147.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.30m (60.04ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 11,  Critical Feature Inspection Date: June 11,  Bridge Improvement Cost: $7,600,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $11,401,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040022PTMUNNBI,  Location: AT MERRIMACK RIVER (Lat: 42.703347,  Lng: -71.160769),  Route carried "on" structure: City street ,  Year Built: 1918,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 45.63m (149.70ft),  Average Daily Traffic: 17,000 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 26,848 (year 2032),  Design Load: HS 20,  Features Intersected: COMB MERIMAC RIV/ACCESS,  Facility Carried by Structure: HWY AMESBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 6,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 45.70m (149.93ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 11,  Underwater Inspection Date: September 2009,  Bridge Improvement Cost: $25,725,000,  Roadway Improvement Cost: $2,573,000,  Total Project Cost: $38,588,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040042PXMUNNBI,  Location: .32 KM NORTH MERRIMAC R (Lat: 42.705778,  Lng: -71.153856),  Route carried "on" structure: City street ,  Year Built: 1860,  Year Reconstructed: 1939,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 28,600 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 45,168 (year 2032),  Features Intersected: WATER NORTH CANAL,  Facility Carried by Structure: HWY UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.238,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.0m (72.2ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 11,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,264,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040052PYMUNNBI,  Location: AT NORTH CANAL (Lat: 42.704839,  Lng: -71.161561),  Route carried "on" structure: City street ,  Year Built: 1919,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.97m (9.74ft),  Average Daily Traffic: 37,000 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 58,434 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NORTH CANAL,  Facility Carried by Structure: HWY AMESBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.5m (60.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.2m (92.5ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 18.5m (60.7ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 11,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L040062YJDOTNBI,  Location: .16 KM N MERRIMAC RIVER (Lat: 42.702417,  Lng: -71.166403),  Route carried "on" structure: State highway 28,  Year Built: 1939,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 40,000 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 61,909 (year 2031),  Design Load: H 20,  Features Intersected: WATER NORTH CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 237.694,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 10,  Bridge Improvement Cost: $1,438,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,158,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040072YKDOTNBI,  Location: 1.1 MI N MERRIMAC RIVER (Lat: 42.715156,  Lng: -71.176694),  Route carried "on" structure: State highway 28,  Year Built: 1900,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 393,000 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 620,665 (year 2031),  Features Intersected: WATER SPICKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 239.303,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 10,  Underwater Inspection Date: Febuary 11,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $892,000 ( Estimate for 2012)
Find on map >>   Show street view

Structure Number: L040082Q0MUNNBI,  Location: 1.4 KM E ST28 (Lat: 42.714244,  Lng: -71.174025),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 6,350 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,029 (year 2031),  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY DAISY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 10,  Underwater Inspection Date: January 11,  Bridge Improvement Cost: $540,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $811,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L04009B7BMUNNBI,  Location: AT OLD COUNTY JAIL (Lat: 42.713514,  Lng: -71.170953),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 8,400 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,266 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY HAMPSHIRE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.3m (63.3ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 11,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L040102R8MUNNBI,  Location: .32 KM WEST ST 110 (Lat: 42.713869,  Lng: -71.167489),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 6,900 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,897 (year 2033),  Design Load: HS 20,  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY BENNINGTN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 12,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $964,000 ( Estimate for 2012),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L040112Q2MUNNBI,  Location: .8 KM WEST ST 110 (Lat: 42.714069,  Lng: -71.164367),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 11,000 (year 2010),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,372 (year 2031),  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY LAWRENCE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 10,  Underwater Inspection Date: November 2009,  Bridge Improvement Cost: $803,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,205,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040122R9MUNNBI,  Location: .16 KM. W. OF RT. 110 (Lat: 42.713356,  Lng: -71.161281),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 2,250 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,553 (year 2031),  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY SHORT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 10,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,159,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040132YEDOTNBI,  Location: .64 KM N LAWRENCE CENTER (Lat: 42.713558,  Lng: -71.158469),  Route carried "on" structure: State highway 110,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.93m (6.33ft),  Average Daily Traffic: 8,250 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,029 (year 2031),  Design Load: H 20,  Features Intersected: WATER SPICKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.503,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 3.3m (10.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 10,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,268,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040142Q3MUNNBI,  Location: 3.2 KM SW OF PROSPECT ST (Lat: 42.714511,  Lng: -71.156650),  Route carried "on" structure: City street ,  Year Built: 1866,  Year Reconstructed: 1889,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 14,900 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 23,532 (year 2032),  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY E HAVRHLL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 93.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 11,  Underwater Inspection Date: September 10,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $815,000 ( Estimate for 2012),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040152Q4MUNNBI,  Location: 0.8 KM EAST ST 110 (Lat: 42.711658,  Lng: -71.153106),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 7,900 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,476 (year 2031),  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY HAVERHILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 10,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,211,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040162PRMUNNBI,  Location: AT LAWRENCE GEN. HOSP. (Lat: 42.709108,  Lng: -71.151756),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 4,800 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,581 (year 2032),  Design Load: H 20,  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY GENERAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 11,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $550,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040172PVMUNNBI,  Location: JUST N OF NORTH CANAL (Lat: 42.707281,  Lng: -71.148636),  Route carried "on" structure: City street ,  Year Built: 1857,  Year Reconstructed: 1907,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 7,400 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,687 (year 2032),  Features Intersected: WATER SPICKET RIVER,  Facility Carried by Structure: HWY CANAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 14.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 11,  Underwater Inspection Date: November 11,  Other Special Inspection Date: Febuary 12,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,690,000 ( Estimate for 2012)
Find on map >>   Show street view

Structure Number: L040192Q5MUNNBI,  Location: JUST WEST I 495 EXIT 43 (Lat: 42.698956,  Lng: -71.145483),  Route carried "on" structure: City street ,  Year Built: 1916,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,200 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,371 (year 2031),  Features Intersected: WATER SHAWSHEEN RIVER,  Facility Carried by Structure: HWY LORING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 4.1m (13.5ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 10,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040212UJDOTNBI,  Location: .32 KM S I495 (Lat: 42.684306,  Lng: -71.139956),  Route carried "on" structure: State highway 114,  Year Built: 1900,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 51,200 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 80,860 (year 2032),  Design Load: H 20,  Features Intersected: WATER SHAWSHEEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 11,  Underwater Inspection Date: Febuary 10,  Bridge Improvement Cost: $466,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $700,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L0402232CDOT634,  Location: .64 KM N I495 (Lat: 42.684408,  Lng: -71.152989),  Route carried "on" structure: State highway ,  Year Built: 1995,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 10,300 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,267 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY S UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 36 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $232,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L0402332DDOT634,  Location: .8 KM SO MERRIMAC RIVER (Lat: 42.701417,  Lng: -71.153933),  Route carried "on" structure: State highway ,  Year Built: 1927,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 6,400 (year 2010),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,108 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY S UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $803,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,205,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L0402432EDOT634,  Location: .1MI E ST 28 (Lat: 42.697408,  Lng: -71.162089),  Route carried "on" structure: State highway ,  Year Built: 1928,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 9,500 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,003 (year 2032),  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY SALEM ST
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.6m (143.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 11,  Critical Feature Inspection Date: September 11,  Bridge Improvement Cost: $1,298,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,948,000 ( Estimate for 2012),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040252PUMUNNBI,  Location: JUST S OF MERRIMACK RIV (Lat: 42.702539,  Lng: -71.160353),  Route carried "on" structure: City street ,  Year Built: 1918,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 53,900 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 50,380 (year 2031),  Features Intersected: WATER SOUTH CANAL,  Facility Carried by Structure: HWY AMESBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 10,  Other Special Inspection Date: October 11,  Bridge Improvement Cost: $2,446,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $3,670,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040262YGDOTNBI,  Location: .16 KM S MERRIMAC RIVER (Lat: 42.700594,  Lng: -71.165269),  Route carried "on" structure: State highway 28,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 40,000 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 61,909 (year 2031),  Features Intersected: WATER SOUTH CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 237.504,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 10,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L0402732FDOT634,  Location: 0.16 KM W ST 28 (Lat: 42.705883,  Lng: -71.171797),  Route carried "on" structure: State highway ,  Year Built: 1927,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 5,314 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,392 (year 2032),  Features Intersected: RR BMRR,  Facility Carried by Structure: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 11,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,252,000 ( Estimate for 2012),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L040352X6DOTNBI,  Location: AT MERRIMAC RIVER (Lat: 42.706456,  Lng: -71.138828),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 29.47m (96.69ft),  Average Daily Traffic: 47,000 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 74,227 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MERRIMACK RIVER
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 163.556,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 29.50m (96.78ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 10,  Underwater Inspection Date: August 11,  Bridge Improvement Cost: $17,627,000,  Roadway Improvement Cost: $1,763,000,  Total Project Cost: $26,441,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040352XDDOTNBI,  Location: AT MERRIMAC RIVER (Lat: 42.706394,  Lng: -71.139067),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 31.97m (104.89ft),  Average Daily Traffic: 98,600 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 155,719 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 495 LOWER LEVEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.556,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 28.4m (93.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 11,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040362X5DOTNBI,  Location: 1 KM N ST114 (Lat: 42.693844,  Lng: -71.141964),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 90,000 (year 2010),  Truck Traffic: 12%,  Average Future Daily Traffic: 142,137 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER SHAWSHEEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.355,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 45.7m (149.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 10,  Underwater Inspection Date: August 11
Find on map >>   Show street view

Structure Number: L040372XBDOTNBI,  Location: .32 KM S MERRIMAC RIVER (Lat: 42.703539,  Lng: -71.139986),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 11.92m (39.11ft),  Average Daily Traffic: 94,800 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 149,718 (year 2032),  Design Load: HS 20,  Features Intersected: COMB MERRIMAC ST & MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.289,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.0m (88.6ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 11,  Bridge Improvement Cost: $8,029,000,  Roadway Improvement Cost: $803,000,  Total Project Cost: $12,044,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L040382X2DOTNBI,  Location: NEXT TO I495 (Lat: 42.703506,  Lng: -71.140275),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 27,900 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 44,062 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WATER SHAWSHEEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Out-to-Out Width: 198.1m (649.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 11,  Underwater Inspection Date: May 10,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $238,000 ( Estimate for 2012)
Find on map >>   Show street view

Structure Number: L040392X7DOTNBI,  Location: .3 MI N MERRIMAC RIVER (Lat: 42.711381,  Lng: -71.137756),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 80,200 (year 2010),  Truck Traffic: 13%,  Average Future Daily Traffic: 126,660 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY RAMPS A & B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.247,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 10,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,225,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040392X8DOTNBI,  Location: .3 MI N MERRIMAC RIVER (Lat: 42.711406,  Lng: -71.138014),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 80,200 (year 2010),  Truck Traffic: 13%,  Average Future Daily Traffic: 126,660 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY RAMPS A & B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.247,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 10,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,171,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040402X9DOTNBI,  Location: .4 MI N MERRIMAC RIVER (Lat: 42.713706,  Lng: -71.137628),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 84,000 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 132,661 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY COMMONWEALTH DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.514,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.5m (60.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 11,  Bridge Improvement Cost: $1,860,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,791,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040402XADOTNBI,  Location: .4 MI N MERRIMAC RIVER (Lat: 42.713775,  Lng: -71.137886),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 84,000 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 132,661 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY COMMONWEALTH DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.514,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 11,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $851,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L040412X3DOTNBI,  Location: .7 MI N ST28 (Lat: 42.686014,  Lng: -71.143450),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 82,000 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,503 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST114 WINTHROP AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.355,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 11,  Bridge Improvement Cost: $2,196,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $3,295,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L040412X4DOTNBI,  Location: .7 MI N ST28 (Lat: 42.685906,  Lng: -71.143231),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 82,000 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,503 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST114 WINTHROP AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.355,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 11,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,211,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L04042318DOTNBI,  Location: AT ANDOVER TOWN LINE (Lat: 42.683303,  Lng: -71.153369),  Route carried "on" structure: State highway ,  Year Built: 1962,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 12,600 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,899 (year 2032),  Design Load: H 20,  Features Intersected: HWY SOUTH ST,  Facility Carried by Structure: HWY S UNION CONN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 11,  Bridge Improvement Cost: $877,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,316,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L04043AJLDOTNBI,  Location: .25 MI. S. COMMONWEALTH D (Lat: 42.711528,  Lng: -71.139275),  Route carried "on" structure: Ramp Interstate 495,  Year Built: 2002,  Status: Open,  Structure Length: 5.20m (17.06ft),  Average Daily Traffic: 3,000 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 495 RAMPS A & K,  Facility Carried by Structure: HWY MARSTN ST NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 11,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $391,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L040442XCDOTNBI,  Location: .16 KM W I495 (Lat: 42.703333,  Lng: -71.140000),  Route carried "on" structure: Ramp Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 12.04m (39.50ft),  Average Daily Traffic: 12,700 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 20,057 (year 2032),  Design Load: H 20,  Features Intersected: COMB MERRIMAC ST & MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.289,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.10m (39.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 11,  Bridge Improvement Cost: $2,904,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $4,357,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L04047AQUMUNNBI,  Location: 1.6 KM FROM N ANDOVER (Lat: 42.706667,  Lng: -71.161664),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 3.28m (10.76ft),  Average Daily Traffic: 500 (year 2011),  Truck Traffic: 25%,  Average Future Daily Traffic: 790 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NORTH CANAL,  Facility Carried by Structure: HWY ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.2m (102.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 11,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $686,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing

Parts: 1, 2

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Massachusetts forum

Back to: Lawrence, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2013 Advameg, Inc.