![]() |
Bridge Statistics for Layton, Utah (UT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Layton, UT, Utah, Utah forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 84 meters (276ft) Total costs: $9,865,000 Total average daily traffic: 546,935 Total average daily truck traffic: 108,562 National Bridge Inventory (NBI) Registered Bridges for Layton
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: C 483, Location: GENTILE ST IN LAYTON (Lat: 41.060056, Lng: -111.963694), Route carried "on" structure: State highway 109, Year Built: 1966, Status: Open, Structure Length: 8.81m (28.90ft), Average Daily Traffic: 21,865 (year 2002), Truck Traffic: 3%, Average Future Daily Traffic: 26,566 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) NBL & SBL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 16.5m (54.1ft), Skew: 24 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 29.0m (95.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 16.6m (54.5ft), Out-to-Out Width: 20.7m (67.9ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 9.80m (32.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,354,000, Roadway Improvement Cost: $135,000, Total Project Cost: $2,234,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: D 718, Location: SR-126 over I-15 (Lat: 41.055278, Lng: -111.961389), Route carried "on" structure: Ramp State highway 126, Year Built: 1966, Status: Open, Structure Length: 8.60m (28.22ft), Average Daily Traffic: 19,895 (year 2002), Truck Traffic: 4%, Average Future Daily Traffic: 24,172 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) NBL & SBL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 28.3m (92.8ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 9.60m (31.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $873,000, Roadway Improvement Cost: $87,000, Total Project Cost: $1,440,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: D 736, Location: CHURCH STREET IN LAYTON (Lat: 41.063083, Lng: -111.967250), Route carried "on" structure: City street , Year Built: 1966, Status: Open, Structure Length: 7.13m (23.39ft), Average Daily Traffic: 3,000 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 3,645 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: CHURCH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 532.259, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.20m (26.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $689,000, Roadway Improvement Cost: $69,000, Total Project Cost: $1,137,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: F 171, Location: Syracuse Int Antelope Dr. (Lat: 41.089111, Lng: -111.991111), Route carried "on" structure: State highway 108, Year Built: 1967, Year Reconstructed: 1982, Status: Open, Structure Length: 9.14m (29.99ft), Average Daily Traffic: 36,670 (year 2002), Truck Traffic: 4%, Average Future Daily Traffic: 44,554 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) NBL & SBL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.480, Lanes on structure: 5, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 25.0m (82.0ft), Skew: 23 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.1m (88.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.7m (8.9ft), Curb-To-Curb Width: 24.6m (80.7ft), Out-to-Out Width: 28.0m (91.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.10m (33.14ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,852,000, Roadway Improvement Cost: $185,000, Total Project Cost: $3,056,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1D 708, Location: N. Layton Intch Hillfield (Lat: 41.073889, Lng: -111.976389), Route carried "on" structure: Interstate 15, Year Built: 1965, Status: Open, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 39,415 (year 2002), Truck Traffic: 26%, Average Future Daily Traffic: 47,889 (year 2022), Design Load: HS 20, Features Intersected: SR-232 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 533.639, Lanes on structure: 3, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.9m (52.2ft), Skew: 10 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 23.8m (78.1ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.30m (17.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $605,000, Roadway Improvement Cost: $61,000, Total Project Cost: $999,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 3D 708, Location: N. Layton Intch Hillfield (Lat: 41.074056, Lng: -111.977053), Route carried "on" structure: Interstate 15, Year Built: 1965, Status: Open, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 39,415 (year 2002), Truck Traffic: 26%, Average Future Daily Traffic: 47,889 (year 2022), Design Load: HS 20, Features Intersected: SR-232 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 533.686, Lanes on structure: 3, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.9m (52.2ft), Skew: 10 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 23.8m (78.1ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.30m (17.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $605,000, Roadway Improvement Cost: $61,000, Total Project Cost: $999,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: C 483, Location: GENTILE ST IN LAYTON (Lat: 41.060056, Lng: -111.963694), Route carried "under" structure: Interstate 15, Year Built: 1966, Structure Length: 8.81m (28.90ft), Average Daily Traffic: 78,830 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: SR-109,GENTILE ST. Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 531.744, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft) Find on map >>
Structure Number: D 718, Location: SR-126 over I-15 (Lat: 41.055278, Lng: -111.961389), Route carried "under" structure: Interstate 15, Year Built: 1966, Structure Length: 8.60m (28.22ft), Average Daily Traffic: 78,830 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: SR-126 Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 531.404, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft) Find on map >>
Structure Number: D 736, Location: CHURCH STREET IN LAYTON (Lat: 41.063083, Lng: -111.967250), Route carried "under" structure: Interstate 15, Year Built: 1966, Structure Length: 7.13m (23.39ft), Average Daily Traffic: 78,830 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: CHURCH STREET Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 532.259, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 24.4m (80.1ft) Find on map >>
Structure Number: F 171, Location: Syracuse Int Antelope Dr. (Lat: 41.089111, Lng: -111.991111), Route carried "under" structure: Interstate 15, Year Built: 1967, Structure Length: 9.14m (29.99ft), Average Daily Traffic: 80,135 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: SR-108,SYRACUSE RD Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 535.727, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.1m (88.9ft) Find on map >>
Structure Number: 1D 708, Location: N. Layton Intch Hillfield (Lat: 41.073889, Lng: -111.976389), Route carried "under" structure: State highway 232, Year Built: 1965, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 35,025 (year 2002), Truck Traffic: 4%, Features Intersected: SR-232, Facility Carried by Structure: I-15 (SR-15) NBL Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.225, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 23.8m (78.1ft) Find on map >>
Structure Number: 3D 708, Location: N. Layton Intch Hillfield (Lat: 41.074056, Lng: -111.977053), Route carried "under" structure: State highway 232, Year Built: 1965, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 35,025 (year 2002), Truck Traffic: 4%, Features Intersected: SR-232, Facility Carried by Structure: I-15 (SR-15) SBL Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.193, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 23.8m (78.1ft) Discuss this city on our hugely popular Utah forum Back to: Layton, UT, Utah, All US cities.
|
![]() |