Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lincoln, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 374ft / 114mTotal length
  • $64,903,000Total costs
  • 467,170Total average daily traffic
  • 28,082Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lincoln
  • No street view available for this location

New bridges in Lincoln, RI - historical statistics
  • New bridges - historical statistics
  • 4Before 1900
  • 11900-1909
  • 21920-1929
  • 91950-1959
  • 71960-1969
  • 41990-1999
  • 12000-2009
  • 12010-2019
  • 22020-2022
Reconstructed bridges in Lincoln, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 31990-1999
  • 32000-2009
Average Bridge Daily Traffic in Lincoln, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 45.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
  • 15.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 16.7%Good
  • 20.8%Satisfactory
  • 25.0%Fair
  • 16.7%Poor
  • 4.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.2%Very good
  • 29.2%Good
  • 29.2%Satisfactory
  • 29.2%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 41.7%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 163,  Location: 0.8 Mi W of JCT RI 122 (Lat: 41.952419,  Lng: -71.453339),  Route carried "on" structure: City street ,  Year Built: 1887,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,034 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,437 (year 2041),  Design Load: HS 20,  Features Intersected: OLD WORC & BOSTON CANAL,  Facility Carried by Structure: SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.197,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,500,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 179,  Location: 0.5 MI W of JCT RI 122 (Lat: 41.937592,  Lng: -71.434456),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 1998,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 57 (year 2021),  Average Future Daily Traffic: 63 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BLACKSTONE CANAL,  Facility Carried by Structure: LOWER RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.645,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.5m (34.4ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $954,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 188,  Location: 1.0 MI N of JCT I-295 (Lat: 41.953961,  Lng: -71.487897),  Route carried "on" structure: State highway 146,  Year Built: 1924,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 58,520 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 64,372 (year 2041),  Design Load: HS 20,  Features Intersected: CROOKFALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.960,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 37 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 94.5m (310.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 195,  Location: 0.2 Mi W of JCT RI 122 (Lat: 41.906500,  Lng: -71.406175),  Route carried "on" structure: State highway 123,  Year Built: 1885,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 15,352 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,423 (year 2036),  Features Intersected: MILL POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.642,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $186,000
Find on map >>   Show street view

Structure Number: 219,  Location: 0.5 Mi S of JCT RI 123 (Lat: 41.896394,  Lng: -71.413417),  Route carried "on" structure: State highway 126,  Year Built: 1887,  Year Reconstructed: 1927,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 6,200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,820 (year 2041),  Features Intersected: MOSHASSUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.470,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $47,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $71,000
Find on map >>   Show street view

Structure Number: 2762,  Location: at 116 (Lat: 41.934733,  Lng: -71.466000),  Route carried "on" structure: Ramp State highway 146,  Year Built: 2003,  Status: Open,  Structure Length: 4.89m (16.04ft),  Average Daily Traffic: 7,400 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,140 (year 2041),  Design Load: HL 93,  Features Intersected: RI 116 GEORGE WASH HWY
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.412,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2765,  Location: 1.5 Mi W of JCT RI 122 (Lat: 41.934800,  Lng: -71.466500),  Route carried "on" structure: State highway 146,  Year Built: 2020,  Status: Open,  Structure Length: 5.25m (17.22ft),  Average Daily Traffic: 31,584 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 37,083 (year 2042),  Design Load: HL 93,  Features Intersected: RI 116 GEORGE WASH HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.160,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.5m (83.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,955,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $4,433,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 2767,  Location: 1.5 Mi W of JCT RI 122 (Lat: 41.934778,  Lng: -71.466489),  Route carried "on" structure: State highway 146,  Year Built: 2020,  Status: Open,  Structure Length: 5.25m (17.22ft),  Average Daily Traffic: 35,616 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 41,817 (year 2042),  Design Load: HL 93,  Features Intersected: RI 116 GEORGE WASH HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.5m (83.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,955,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $4,433,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 377,  Location: 0.5 Mi W of JCT RI 122 (Lat: 41.891203,  Lng: -71.408067),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 300 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 360 (year 2036),  Design Load: HS 20,  Features Intersected: MOSHASSUCK RIVER,  Facility Carried by Structure: MOSHASSUCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.085,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $188,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3805,  Location: 0.9 Mi N of Albion Rd (Lat: 41.959964,  Lng: -71.471503),  Route carried "on" structure: State highway 126,  Year Built: 2017,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 4,907 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,398 (year 2041),  Design Load: HL 93,  Features Intersected: Mussey Brook
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.060,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $271,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 415,  Location: 0.1 Mi E of JCT RI 246 (Lat: 41.925875,  Lng: -71.458781),  Route carried "on" structure: City street ,  Year Built: 1953,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 3.67m (12.04ft),  Average Daily Traffic: 4,168 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,585 (year 2041),  Design Load: HL 93,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: WILBUR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.086,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.5m (80.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $561,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 416,  Location: 0.5 Mi E Jct RI 246 (Lat: 41.902517,  Lng: -71.447258),  Route carried "on" structure: Alternate State highway 123,  Year Built: 1951,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 13,500 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,850 (year 2041),  Design Load: HS 20,  Features Intersected: RI 146 EDDIE DOWLING HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.757,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $291,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 417,  Location: 2.0 Mi N of JCT RI 15 (Lat: 41.894928,  Lng: -71.443439),  Route carried "on" structure: City street ,  Year Built: 1952,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 9,900 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,890 (year 2041),  Design Load: H 20,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: TWIN RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.252,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $552,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $828,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 418,  Location: 2.0 Mi S of JCT RI 123 (Lat: 41.884156,  Lng: -71.436994),  Route carried "on" structure: State highway 146,  Year Built: 1956,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 47,393 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 56,872 (year 2036),  Design Load: HS 20,  Features Intersected: COBBLE HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.993,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.6m (97.1ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $2,032,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $3,048,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 493,  Location: 0.3 Mi E of JCT RI 126 (Lat: 41.886039,  Lng: -71.407644),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 6,464 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,757 (year 2036),  Design Load: HS 20,  Features Intersected: MOSHASSUCK RIVER,  Facility Carried by Structure: HIGGINSON AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.600,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.08m (3.54ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $704,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 748,  Location: 1.0 Mi N of JCT RI 116 (Lat: 41.942792,  Lng: -71.475747),  Route carried "on" structure: Interstate 295,  Year Built: 1969,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 27,992 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 33,591 (year 2036),  Design Load: HS 20,  Features Intersected: RI 146 EDDIE DOWLING HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.890,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.2m (125.3ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,362,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,543,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7482,  Location: 1. Mi N of JCT RI 116 (Lat: 41.943681,  Lng: -71.476875),  Route carried "on" structure: Interstate 295,  Year Built: 1969,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 27,992 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,591 (year 2036),  Design Load: HS 20,  Features Intersected: RI 146 EDDIE DOWLING HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.282,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,362,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,543,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 749,  Location: 0.5 Mi N of JCT RI 116 (Lat: 41.940711,  Lng: -71.456878),  Route carried "on" structure: State highway 126,  Year Built: 1969,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 14.14m (46.39ft),  Average Daily Traffic: 8,589 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,448 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 NB & SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.545,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.14m (46.39ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $3,533,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $5,299,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 769,  Location: 0.3 Mi W of JCT RI 122 (Lat: 41.927000,  Lng: -71.430900),  Route carried "on" structure: City street ,  Year Built: 1810,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 4.74m (15.55ft),  Average Daily Traffic: 2,958 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,254 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: MARTIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.366,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $986,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 774,  Location: 0.5 Mi W of JCT RI 126 (Lat: 41.926994,  Lng: -71.431469),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 2,958 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,254 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BLACKSTONE CANAL,  Facility Carried by Structure: MARTIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.318,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.2m (105.6ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 83.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,251,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 985,  Location: 0.5 Mi SW of RI 122 (Lat: 41.978244,  Lng: -71.485078),  Route carried "on" structure: Alternate State highway 99,  Year Built: 1993,  Status: Open,  Structure Length: 30.62m (100.46ft),  Average Daily Traffic: 35,200 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 38,720 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER, P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.587,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.2m (79.4ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 85.3m (279.9ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.38m (79.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $16,550,000,  Roadway Improvement Cost: $1,655,000,  Total Project Cost: $24,826,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 986,  Location: 0.5 Mi N of JCT RI 146 (Lat: 41.964475,  Lng: -71.484458),  Route carried "on" structure: State highway 99,  Year Built: 1991,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 25,179 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,215 (year 2036),  Design Load: HS 20,  Features Intersected: SAYLES HILL RD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 2.045,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,509,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $2,263,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 987,  Location: .65 Mi N of JCT I-295 (Lat: 41.950864,  Lng: -71.485050),  Route carried "on" structure: Ramp State highway 99,  Year Built: 1991,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 12,550 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,060 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: RI 146 EDDIE DOWLING HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.112,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,379,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $3,568,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 988,  Location: 0.1 Mi S of JCT RI 123 (Lat: 41.902431,  Lng: -71.422544),  Route carried "on" structure: City street ,  Year Built: 1927,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2036),  Design Load: HS 20,  Features Intersected: Barney Pond,  Facility Carried by Structure: Table Rock Rd
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.700,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,027,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,541,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 415,  Location: 0.1 Mi E of JCT RI 246 (Lat: 41.925875,  Lng: -71.458781),  Route carried "under" structure: Alternate State highway 146,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 4,168 (year 2021),  Truck Traffic: 5%,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: WILBUR RD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.5m (80.4ft)

Find on map >>   Show street view

Structure Number: 416,  Location: 0.5 Mi E Jct RI 246 (Lat: 41.902517,  Lng: -71.447258),  Route carried "under" structure: Alternate State highway 123,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 13,500 (year 2021),  Truck Traffic: 4%,  Features Intersected: RI 146 EDDIE DOWLING HWY
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 417,  Location: 2.0 Mi N of JCT RI 15 (Lat: 41.894928,  Lng: -71.443439),  Route carried "under" structure: Alternate State highway 146,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 9,900 (year 2021),  Truck Traffic: 4%,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: TWIN RIVER RD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 748,  Location: 1.0 Mi N of JCT RI 116 (Lat: 41.942792,  Lng: -71.475747),  Route carried "under" structure: State highway 146,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: I-295 NB
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.2m (125.3ft)

Find on map >>   Show street view

Structure Number: 7482,  Location: 1. Mi N of JCT RI 116 (Lat: 41.943681,  Lng: -71.476875),  Route carried "under" structure: State highway 146,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: I-295 SB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 749,  Location: 0.5 Mi N of JCT RI 116 (Lat: 41.940711,  Lng: -71.456878),  Route carried "under" structure: Interstate 295,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 8,589 (year 2021),  Truck Traffic: 4%,  Features Intersected: I-295 NB & SB,  Facility Carried by Structure: RI 126 OLD RIVERRD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 987,  Location: .65 Mi N of JCT I-295 (Lat: 41.950864,  Lng: -71.485050),  Route carried "under" structure: State highway 146,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: RI 146 EDDIE DOWLING HWY,  Facility Carried by Structure: RI 99 Ramp
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Discuss Lincoln, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.