Bridge Statistics for Lyme, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Lyme, CT, Connecticut, Connecticut forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 14 meters (46ft) Total costs: $20,000 Total average daily traffic: 11,049 Total average daily truck traffic: 410 Total future (year 2026) average daily traffic: 5,526 National Bridge Inventory (NBI) Registered Bridges for Lyme
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 2508, Location: 0.1 MI W OF ROUTE 148 (Lat: 41.423333, Lng: -72.401667), Route carried "on" structure: State highway 82, Year Built: 1982, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 2,100 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 1,050 (year 2026), Design Load: HS 20, Features Intersected: ROARING BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.674, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 89.1 metric tons, Inventory Rating: 89.1 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000) Find on map >>
Structure Number: 4723, Location: 0.2 MI W OF ROUTE 156 (Lat: 41.405000, Lng: -72.345000), Route carried "on" structure: City street , Year Built: 1966, Status: Open, Structure Length: 1.89m (6.20ft), Average Daily Traffic: 287 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 144 (year 2026), Design Load: HS 20, Features Intersected: EIGHT MILE RIVER, Facility Carried by Structure: MOUNT ARCHER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.156, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.1m (56.1ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4724, Location: 100FT W OF OLD HAMBURG RD (Lat: 41.390000, Lng: -72.350000), Route carried "on" structure: City street , Year Built: 1920, Year Reconstructed: 1987, Status: Open, Structure Length: 2.62m (8.60ft), Average Daily Traffic: 460 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 230 (year 2026), Features Intersected: EIGHT MILE RIVER, Facility Carried by Structure: JOSHUATOWN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.981, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 3, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: November 2007, Underwater Inspection Date: November 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4726, Location: 500FT W OF ROUTE 156 (Lat: 41.405000, Lng: -72.338333), Route carried "on" structure: City street , Year Built: 1972, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 172 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 86 (year 2026), Features Intersected: EIGHT MILE RIVER, Facility Carried by Structure: MACINTOSH ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.772, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.9m (48.9ft), Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 19.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 11.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5395, Location: 1.5 MI W OF ROUTE 154 (Lat: 41.431667, Lng: -72.413333), Route carried "on" structure: State highway 148, Year Built: 1928, Year Reconstructed: 1986, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 300 (year 2005), Truck Traffic: 2%, Average Future Daily Traffic: 150 (year 2026), Design Load: HS 20, Features Intersected: WHALEBONE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.084, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 78.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 5396, Location: 0.3 E OF ROUTE 82 (Lat: 41.431667, Lng: -72.336667), Route carried "on" structure: State highway 156, Year Built: 1986, Status: Open, Structure Length: 1.43m (4.69ft), Average Daily Traffic: 2,200 (year 2005), Truck Traffic: 3%, Average Future Daily Traffic: 1,100 (year 2026), Design Load: HS 20, Features Intersected: EIGHT MILE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.515, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.1m (43.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 60.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: September 2006, Other Special Inspection Date: September 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 5672, Location: 0.6 MI E OF ROUTE 82 (Lat: 41.426667, Lng: -72.335000), Route carried "on" structure: State highway 156, Year Built: 1988, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 2,300 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 1,150 (year 2026), Design Load: HS 20, Features Intersected: E BRANCH EIGHT MILE RV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.014, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.6m (47.9ft), Curb-To-Curb Width: 11.2m (36.7ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 80.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 5677, Location: 1.9 MI E OF ROUTE 82 (Lat: 41.410000, Lng: -72.338333), Route carried "on" structure: State highway 156, Year Built: 1988, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 2,600 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 1,300 (year 2026), Design Load: HS 20, Features Intersected: BEAVER BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.073, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.0m (13.1ft), Curb or Sidewalk Widths: Left: 2.2m (7.2ft), Right: 2.2m (7.2ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 5818, Location: 0.3 MI N OF ROUTE 148 (Lat: 41.425000, Lng: -72.408333), Route carried "on" structure: City street , Year Built: 1989, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 285 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 143 (year 2026), Features Intersected: ROARING BROOK, Facility Carried by Structure: DAY HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.515, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.3m (14.1ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Poor, Inventory Rating: 68.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: May 2007, Other Special Inspection Date: May 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 6039, Location: 0.2 MI N. OF ROUTE 156 (Lat: 41.428333, Lng: -72.331667), Route carried "on" structure: City street , Year Built: 1991, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 345 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 173 (year 2026), Design Load: HS 25, Features Intersected: EAST BR EIGHT MILE RIVER, Facility Carried by Structure: SALEM ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.354, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 5.8m (19.0ft), Out-to-Out Width: 5.8m (19.0ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Good, Channel: Very good, Operating Rating: 63.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Discuss this city on our hugely popular Connecticut forum Back to: Lyme, CT, Connecticut, All US cities.
|
![]() |