U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Manchester, Tennessee (TN) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Manchester, TN, Tennessee, Tennessee forum, All US cities.


National Bridge Inventory (NBI) Statistics
Number of bridges: 32
Total length: 186 meters (610ft)
Total costs: $18,676,000
Total average daily traffic: 458,480
Total average daily truck traffic: 40,533
National Bridge Inventory (NBI) Registered Bridges for Manchester

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 1
  • 1930-1939: 3
  • 1940-1949: 2
  • 1950-1959: 4
  • 1960-1969: 13
  • 1970-1979: 4
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 4
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 16034100001,  Location: E. JCT. 3410 W / SR 53 (Lat: 35.499183,  Lng: -86.131083),  Route carried "on" structure: City street 3410,  Year Built: 1970,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,920 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,072 (year 2028),  Design Load: H 20,  Features Intersected: GREENBRIER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006
Find on map >>

Structure Number: 16034110001,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.485933,  Lng: -86.087033),  Route carried "on" structure: City street 3411,  Year Built: 1930,  Status: Posted for load,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 4,370 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,992 (year 2028),  Design Load: H 15,  Features Intersected: LITTLE DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,343,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,015,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16034120001,  Location: NEAR MANCHESTER TENN. (Lat: 35.484483,  Lng: -86.081200),  Route carried "on" structure: City street 3412,  Year Built: 1980,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 1,330 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,128 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: LITTLE DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 16034150001,  Location: 4 MI E OF I24 MCKELLAR DR (Lat: 35.474650,  Lng: -86.069983),  Route carried "on" structure: City street 152,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 900 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,440 (year 2028),  Features Intersected: LITTLE DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $568,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 160A1400001,  Location: .1 MI FROM I24 (Lat: 35.481300,  Lng: -86.064367),  Route carried "on" structure: City street 140,  Year Built: 1960,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 840 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,344 (year 2028),  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $89,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $134,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 160A2110001,  Location: IN CITY OF MANCHESTER (Lat: 35.453883,  Lng: -86.054867),  Route carried "on" structure: City street 211,  Year Built: 1940,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 300 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 480 (year 2028),  Features Intersected: HUNT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $343,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 160A2290001,  Location: 1 MI FROM SR 2 (Lat: 35.453250,  Lng: -86.056667),  Route carried "on" structure: City street 229,  Year Built: 1967,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 290 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 464 (year 2028),  Design Load: H 15,  Features Intersected: HUNT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $59,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 160A2390001,  Location: .5 MI FROM SR 2 (Lat: 35.454683,  Lng: -86.064950),  Route carried "on" structure: City street 4663,  Year Built: 1955,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,940 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,104 (year 2028),  Design Load: H 15,  Features Intersected: LITTLE DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $545,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 160A4060001,  Location: 2 MI FROM SR 2 (Lat: 35.467967,  Lng: -86.067300),  Route carried "on" structure: City street 406,  Year Built: 1965,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 150 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2028),  Features Intersected: LITTLE DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.0 metric tons,  Inventory Rating: 24.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $79,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $119,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 160A4060003,  Location: 2.1 MI FROM SR 2 (Lat: 35.468417,  Lng: -86.066817),  Route carried "on" structure: City street 406,  Year Built: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 150 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2028),  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $62,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 160B1880001,  Location: IN OLD STONE FORT ST PARK (Lat: 35.492350,  Lng: -86.104350),  Route carried "on" structure: City street 188,  Year Built: 1906,  Year Reconstructed: 1971,  Status: Posted for load,  Structure Length: 7.94m (26.05ft),  Average Daily Traffic: 50 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 80 (year 2028),  Features Intersected: DUCK RIVER (OSFSP)
Minimum Vertical Clearance: 4.25m (13.94ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.95m (29.36ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2006,  Critical Feature Inspection Date: May 2006,  Underwater Inspection Date: October 2007,  Bridge Improvement Cost: $1,010,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,516,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 16F00290001,  Location: IN MANCHESTER URBAN AREA (Lat: 35.479417,  Lng: -86.088583),  Route carried "on" structure: City street 1111,  Year Built: 1994,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,930 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,288 (year 2028),  Design Load: HS 20,  Features Intersected: GRINDSTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.650,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16I00240023,  Location: IN MANCHESTER (Lat: 35.499300,  Lng: -86.086700),  Route carried "on" structure: State highway 53,  Year Built: 1967,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 9,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,032 (year 2028),  Design Load: HS 20,  Features Intersected: I24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $619,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16I00240027,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.493750,  Lng: -86.077433),  Route carried "on" structure: Interstate 24,  Year Built: 1966,  Status: Open,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 43,040 (year 2007),  Truck Traffic: 31%,  Average Future Daily Traffic: 61,264 (year 2028),  Design Load: HS 20,  Features Intersected: NFA A092 & CFW RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.595,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16I00240028,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.493833,  Lng: -86.077117),  Route carried "on" structure: Interstate 24,  Year Built: 1966,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 43,040 (year 2007),  Truck Traffic: 31%,  Average Future Daily Traffic: 61,264 (year 2028),  Design Load: HS 20,  Features Intersected: NFA A092 & CFW RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.595,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16I00240029,  Location: SR55/I-24 IN MANCHESTER (Lat: 35.489283,  Lng: -86.074050),  Route carried "on" structure: State highway 55,  Year Built: 1973,  Status: Open,  Structure Length: 8.76m (28.74ft),  Average Daily Traffic: 13,650 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,728 (year 2028),  Design Load: HS 20,  Features Intersected: I24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.802,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 16SR0550,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16I0024003,  Location: SR55/I-24 IN MANCHESTER (Lat: 35.489650,  Lng: -86.074267),  Route carried "on" structure: State highway 55,  Year Built: 1966,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 8.57m (28.12ft),  Average Daily Traffic: 13,650 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,728 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.802,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 16SR0550,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.2m (79.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.57m (28.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $139,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16I00240033,  Location: 1 MI. SE JCT. I-24 & I-55 (Lat: 35.476200,  Lng: -86.063350),  Route carried "on" structure: City street 152,  Year Built: 1966,  Status: Open,  Structure Length: 7.26m (23.82ft),  Average Daily Traffic: 700 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,120 (year 2028),  Design Load: H 15,  Features Intersected: I24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.1m (69.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $236,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 16I00240035,  Location: IN MANCHESTER (Lat: 35.457567,  Lng: -86.519050),  Route carried "on" structure: State highway 2,  Year Built: 2000,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 14,390 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,592 (year 2028),  Design Load: HS 20,  Features Intersected: I24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.973,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 29.1m (95.5ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.4m (135.8ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16SR0020011,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.495000,  Lng: -86.105000),  Route carried "on" structure: US 41,  Year Built: 1931,  Status: Open,  Structure Length: 9.57m (31.40ft),  Average Daily Traffic: 9,090 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,928 (year 2028),  Design Load: H 15,  Features Intersected: DUCK RIVER,  Facility Carried by Structure: FAU 2
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 20.471,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Critical Feature Inspection Date: March 2006,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,324,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 16SR0020013,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.486783,  Lng: -86.091450),  Route carried "on" structure: US 41,  Year Built: 1958,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 13,950 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,552 (year 2028),  Design Load: HS 20,  Features Intersected: LITTLE DUCK RIVER,  Facility Carried by Structure: FAU 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 15 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.72m (31.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $761,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16SR0020014,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.486600,  Lng: -86.091150),  Route carried "on" structure: US 41,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 13,950 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,552 (year 2028),  Design Load: H 15,  Features Intersected: LITTLE DUCK RIVER,  Facility Carried by Structure: FAU 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 15 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.66m (34.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,954,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,932,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16SR0020015,  Location: IN MANCHESTER CITY LIMITS (Lat: 35.480283,  Lng: -86.085817),  Route carried "on" structure: US 41,  Year Built: 1928,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 16,050 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 26,672 (year 2028),  Design Load: H 15,  Features Intersected: CFW RAILROAD,  Facility Carried by Structure: FAU 2 349448N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.982,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,668,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $2,503,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16SR0020017,  Location: IN MANCHESTER (Lat: 35.462417,  Lng: -86.065050),  Route carried "on" structure: US 41,  Year Built: 1950,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 18,440 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 29,952 (year 2028),  Design Load: HS 20,  Features Intersected: LITTLE DUCK RIVER,  Facility Carried by Structure: FAU 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.717,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16SR0550013,  Location: IN MANCHESTER (Lat: 35.479650,  Lng: -86.079750),  Route carried "on" structure: State highway 55,  Year Built: 1941,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 15,880 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,408 (year 2028),  Design Load: H 15,  Features Intersected: LITTLE DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.595,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 16SR0550,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.59m (41.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $3,200,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $4,801,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16I00240023,  Location: IN MANCHESTER (Lat: 35.499517,  Lng: -86.086767),  Route carried "under" structure: Interstate 24,  Year Built: 1966,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 43,040 (year 2007),  Truck Traffic: 2%,  Features Intersected: SR 53,  Facility Carried by Structure: FAP 53
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 21.517,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>

Structure Number: 16I00240027,  Location: .1 MI OF SR55 (Lat: 35.493617,  Lng: -86.077333),  Route carried "under" structure: County highway 92,  Year Built: 1966,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 1,960 (year 2008),  Truck Traffic: 2%,  Features Intersected: I24 EBL,  Facility Carried by Structure: I24
Minimum Vertical Clearance: 4.09m (13.42ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>

Structure Number: 16I00240028,  Location: .1 MI OF SR55 (Lat: 35.493783,  Lng: -86.077083),  Route carried "under" structure: County highway 92,  Year Built: 1966,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 1,960 (year 2008),  Truck Traffic: 2%,  Features Intersected: I24 WBL,  Facility Carried by Structure: I24 WBL
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 1.529,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>

Structure Number: 16I00240029,  Location: SR55/I-24 IN MANCHESTER (Lat: 35.489683,  Lng: -86.074067),  Route carried "under" structure: Interstate 24,  Year Built: 1973,  Structure Length: 8.76m (28.74ft),  Average Daily Traffic: 42,130 (year 2007),  Truck Traffic: 2%,  Features Intersected: SR 55 NBL,  Facility Carried by Structure: FAP 55
Minimum Vertical Clearance: 5.42m (17.78ft),  Kilometerpoint: 23.142,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>

Structure Number: 16I0024003,  Location: SR55/I-24 IN MANCHESTER (Lat: 35.489933,  Lng: -86.074333),  Route carried "under" structure: Interstate 24,  Year Built: 1966,  Structure Length: 8.57m (28.12ft),  Average Daily Traffic: 43,040 (year 2007),  Truck Traffic: 2%,  Features Intersected: SR 55 SBL,  Facility Carried by Structure: FAP 55
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 2.311,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>

Structure Number: 16I00240033,  Location: 1.1 MI E OF SR-55 JCT. (Lat: 35.475000,  Lng: -86.063333),  Route carried "under" structure: Interstate 24,  Year Built: 1966,  Structure Length: 7.26m (23.82ft),  Average Daily Traffic: 42,130 (year 2007),  Truck Traffic: 2%,  Features Intersected: NFA A152,  Facility Carried by Structure: NFA A152
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 24.929,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>

Structure Number: 16I00240035,  Location: 2.5 MI FROM SR 55 (Lat: 35.457217,  Lng: -86.051483),  Route carried "under" structure: Interstate 24,  Year Built: 2000,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 38,220 (year 2007),  Truck Traffic: 2%,  Features Intersected: SR 2,  Facility Carried by Structure: FAU 2
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 27.214,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.4m (135.8ft)

Discuss this city on our hugely popular Tennessee forum

Back to: Manchester, TN, Tennessee, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.