National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 12 meters (39ft)
Total costs: $2,955,000
Total average daily traffic: 5,513
Total average daily truck traffic: 279
Total future (year 2018) average daily traffic: 6,888
National Bridge Inventory (NBI) Registered Bridges for Mansfield

New bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 6
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 2
  • 2000-2009: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 221207,  Location: 2.2 MILES SE OF OTTO (Lat: 42.331942,  Lng: -78.802819),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 383 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 477 (year 2026),  Design Load: HS 20,  Features Intersected: JERSEY HOLLOW CRK,  Facility Carried by Structure: JERSEY HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 4 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 77.4 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $233,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332254,  Location: 2.3 MI NE OF LITTLE VLLEY (Lat: 42.270231,  Lng: -78.751869),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 170 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 212 (year 2027),  Design Load: H 20,  Features Intersected: DUBLIN CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $236,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 332256,  Location: .7 MILE N OF EDDYVILLE (Lat: 42.338872,  Lng: -78.757081),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 667 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 834 (year 2026),  Design Load: HS 25,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: TOAD HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $236,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 332257,  Location: .1 MI SOUTH OF EDDYVILLE (Lat: 42.329197,  Lng: -78.763525),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 723 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 904 (year 2023),  Design Load: H 20,  Features Intersected: EDDYVILLE CREEK,  Facility Carried by Structure: TOAD HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $222,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 332258,  Location: .2 MILE SOUTH OF MAPLES (Lat: 42.331428,  Lng: -78.735381),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 542 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 678 (year 2018),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: COUNTY ROAD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $222,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 332259,  Location: 1.0 MI S OF MAPLES (Lat: 42.319633,  Lng: -78.732269),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 633 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 791 (year 2018),  Design Load: HS 25,  Features Intersected: TRIB MANSFIELD CR,  Facility Carried by Structure: COUNTY ROAD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $222,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 332261,  Location: 0.2 MI E OF MAPLES (Lat: 42.333017,  Lng: -78.731486),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 393 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 491 (year 2025),  Design Load: H 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $231,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 332262,  Location: 0.5 MI SE OF MAPLES (Lat: 42.331844,  Lng: -78.725950),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 393 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 491 (year 2025),  Design Load: HS 25,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $231,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332263,  Location: 1.5 MI E OF MAPLES (Lat: 42.328681,  Lng: -78.708125),  Route carried "on" structure: City street ,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 212 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2025),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $231,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 332264,  Location: 0.8 MI SE. OF MAPLES (Lat: 42.330806,  Lng: -78.721431),  Route carried "on" structure: City street ,  Year Built: 1963,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 212 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2025),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $231,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336045,  Location: 1.4 MI NE OF LITTLE VLLEY (Lat: 42.263417,  Lng: -78.765139),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 371 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 462 (year 2027),  Features Intersected: DUBLIN CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $357,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336896,  Location: 2 MI N OF LITTLE VALLEY (Lat: 42.286014,  Lng: -78.806328),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 814 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,018 (year 2026),  Design Load: HS 25,  Features Intersected: BR LITTLE VALL CK,  Facility Carried by Structure: COUNTY ROAD 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 78.4 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $303,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Mansfield, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.