U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Marilla, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Marilla, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 30 meters (98ft)
Total costs: $14,057,000
Total average daily traffic: 14,143
Total average daily truck traffic: 891
Total future (year 2013) average daily traffic: 17,700
National Bridge Inventory (NBI) Registered Bridges for Marilla

New bridges - Historical Statistics

  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 2
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 104651,  Location: 2.2 MI W OF CROWLESVILLE (Lat: 42.857733,  Lng: -78.504856),  Route carried "on" structure: State highway 354,  Year Built: 1947,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 2,649 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,409 (year 2026),  Design Load: H 20,  Features Intersected: CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.242,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 84.2 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $893,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $1,424,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 104657,  Location: 1.1 MI S JCT SH358 &SH354 (Lat: 42.841114,  Lng: -78.555372),  Route carried "on" structure: State highway 954G,  Year Built: 1931,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,964 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,663 (year 2022),  Features Intersected: LIT BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.651,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $595,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 332686,  Location: .5 MILE SE OF MARILLA (Lat: 42.837047,  Lng: -78.546436),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 336 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 419 (year 2018),  Design Load: HS 20,  Features Intersected: LIT BUFFALO CREEK,  Facility Carried by Structure: EAST AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $471,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 332728,  Location: NORTH END OF MARILLA (Lat: 42.841711,  Lng: -78.549008),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 2,431 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,039 (year 2027),  Design Load: HS 25,  Features Intersected: LITTLE BUFFALO CR,  Facility Carried by Structure: BULLIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.8m (71.5ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $3,794,000,  Roadway Improvement Cost: $2,201,000,  Total Project Cost: $5,995,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 33279,  Location: 1.3 MI SE JCT SH422&BF CK (Lat: 42.792208,  Lng: -78.577053),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 6.97m (22.87ft),  Average Daily Traffic: 1,632 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,040 (year 2018),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: PORTERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.97m (22.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $2,107,000,  Roadway Improvement Cost: $1,222,000,  Total Project Cost: $3,329,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 332805,  Location: 1.3 MILES SE OF MARILLA (Lat: 42.824094,  Lng: -78.536286),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1968,  Status: Posted for load-capacity,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 677 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 846 (year 2018),  Features Intersected: LIT BUFFALO CREEK,  Facility Carried by Structure: FOUR ROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $380,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332829,  Location: 2.9 KM NW JCT 20A & BUF C (Lat: 42.788103,  Lng: -78.553608),  Route carried "on" structure: Other road 954G,  Year Built: 1998,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 1,988 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,457 (year 2026),  Design Load: HS 25,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.481,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $429,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 332871,  Location: 1.2 MILES SE OF MARILLA (Lat: 42.827200,  Lng: -78.538431),  Route carried "on" structure: County highway ,  Year Built: 1932,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 718 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 895 (year 2018),  Design Load: HS 20,  Features Intersected: LIT BUFFALO CREEK,  Facility Carried by Structure: WILLISTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Critical Feature Inspection Date: August 2006,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $318,000,  Total Project Cost: $852,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 33677,  Location: 1.5 MI NE OF WALES CENTER (Lat: 42.793500,  Lng: -78.515725),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 248 (year 1993),  Truck Traffic: 6%,  Average Future Daily Traffic: 309 (year 2013),  Design Load: HS 20,  Features Intersected: TRIB LIT BUFF CRK,  Facility Carried by Structure: THREE ROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 78.6 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $295,000 ( Estimate for 2007)
Find on map >>

Structure Number: 337012,  Location: 1 MILE N OF LIBERIA RD (Lat: 42.803436,  Lng: -78.515939),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 500 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 623 (year 2020),  Design Load: HS 25,  Features Intersected: LIT BUFFALO CREEK,  Facility Carried by Structure: THREE ROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.68m (2.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $287,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Marilla, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.