U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Marlborough, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Marlborough, MA, Massachusetts, Massachusetts forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 28
Total length: 168 meters (551ft)
Total costs: $31,033,000
Total average daily traffic: 1,085,470
Total average daily truck traffic: 121,334
National Bridge Inventory (NBI) Registered Bridges for Marlborough

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 20
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 0
  • 2000-2009: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: M06003253MUNNBI,  Location: .2 MI NE OF NORTHBORO (Lat: 42.346747,  Lng: -71.615092),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 2,600 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,106 (year 2027),  Design Load: H 20,  Features Intersected: WATER ASSABET RIVER,  Facility Carried by Structure: HWY ROBIN HLL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2006,  Underwater Inspection Date: November 2006,  Other Special Inspection Date: August 2007,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,252,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M06004254MUNNBI,  Location: 100 FT. S.E. OF NTBRO T.L (Lat: 42.341736,  Lng: -71.616464),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,400 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,949 (year 2027),  Design Load: H 20,  Features Intersected: WATER ASSABET RIVER,  Facility Carried by Structure: HWY BOUNDARY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Poor,  Superstructure: Critical,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2006,  Underwater Inspection Date: November 2006,  Other Special Inspection Date: Febuary 2008,  Bridge Improvement Cost: $865,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,298,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M060061K9MUNNBI,  Location: .2 MI. E. OF BOUNDARY ST. (Lat: 42.340678,  Lng: -71.606853),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 650 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,027 (year 2028),  Features Intersected: WATER MILLHAM BROOK,  Facility Carried by Structure: HWY MILLHAM ST
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $290,000 ( Estimate for 2006)
Find on map >>

Structure Number: M06007281MHDNBI,  Location: .1MI. N.W. OF I-290 (Lat: 42.367200,  Lng: -71.594411),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 4.22m (13.85ft),  Average Daily Traffic: 98,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 154,771 (year 2028),  Design Load: H 20,  Features Intersected: HWY N ROBIN HILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.200,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.3m (66.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,313,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,970,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M06007282MHDNBI,  Location: .1MI. N.W. OF I-290 (Lat: 42.366942,  Lng: -71.594561),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 98,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 154,771 (year 2028),  Design Load: H 20,  Features Intersected: HWY N ROBIN HILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.200,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,787,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M06008217MHDNBI,  Location: .6 MI.STH.OF US20 (Lat: 42.332803,  Lng: -71.576028),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 3,000 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,738 (year 2028),  Design Load: H 20,  Features Intersected: I 495,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 49.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Other Special Inspection Date: April 2008,  Bridge Improvement Cost: $2,090,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $3,136,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M060091L4MHDNBI,  Location: 1.8 MI.E.OF NORTHBORO TL. (Lat: 42.341214,  Lng: -71.575936),  Route carried "on" structure: State highway 20,  Year Built: 1962,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 36,400 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 57,487 (year 2027),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 204.521,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $2,822,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $4,234,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M060091L5MHDNBI,  Location: 1.8 MI.E.OF NORTHBORO TL. (Lat: 42.341214,  Lng: -71.575936),  Route carried "on" structure: State highway 20,  Year Built: 1962,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 34,000 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 53,696 (year 2027),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 204.521,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $2,822,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $4,234,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M06010298MHDNBI,  Location: 0.5 MI N RT 20 (Lat: 42.347219,  Lng: -71.576444),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 2.39m (7.84ft),  Average Daily Traffic: 10,400 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,425 (year 2028),  Design Load: H 20,  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $643,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $965,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: M06010299MHDNBI,  Location: 0.5 MI N RT 20 (Lat: 42.347225,  Lng: -71.576183),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 2.39m (7.84ft),  Average Daily Traffic: 10,400 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,425 (year 2028),  Design Load: H 20,  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $643,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $965,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: M0601227YMHDNBI,  Location: .5 MI. S. OF I-290 (Lat: 42.358842,  Lng: -71.586114),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 84,600 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 133,609 (year 2028),  Design Load: H 20,  Features Intersected: HWY BERLIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.057,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $617,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $926,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M06012280MHDNBI,  Location: 0.5 MI S. I-290 (Lat: 42.358906,  Lng: -71.586508),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 84,600 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 133,609 (year 2028),  Design Load: H 20,  Features Intersected: HWY BERLIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.057,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $617,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $926,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M060141TUMHDNBI,  Location: .5 MI E. OF SOLOMON PD RD (Lat: 42.352358,  Lng: -71.614503),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 71,200 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 112,446 (year 2028),  Design Load: HS 20,  Features Intersected: WATER ASSABET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.226,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 58.8m (192.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2007,  Underwater Inspection Date: December 2003
Find on map >>

Structure Number: M060151TVMHDNBI,  Location: .1 M WEST OF I-495 (Lat: 42.361119,  Lng: -71.597275),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 35,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 55,276 (year 2028),  Design Load: HS 20,  Features Intersected: HWY BIGELOW ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.832,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $449,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M060151TWMHDNBI,  Location: .1MI. W. OF I-495 (Lat: 42.361275,  Lng: -71.597439),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 35,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 55,276 (year 2028),  Design Load: HS 20,  Features Intersected: HWY BIGELOW ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.832,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,100,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M060161TXMHDNBI,  Location: 2 MILES NORTH OF ROUTE 20 (Lat: 42.362953,  Lng: -71.590750),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 72,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 113,710 (year 2028),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.701,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,121,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M060161TYMHDNBI,  Location: 2 MILES NORTH OF ROUTE 20 (Lat: 42.363114,  Lng: -71.590917),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 72,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 113,710 (year 2028),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.701,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $2,638,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $3,958,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M0601828VMHDNBI,  Location: 1 MI E RT 495 (Lat: 42.369475,  Lng: -71.576839),  Route carried "on" structure: State highway 290,  Year Built: 1978,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 26,200 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 41,378 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $217,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M0601927EMHDNBI,  Location: .2 MILES EAST OF 495 (Lat: 42.364483,  Lng: -71.587103),  Route carried "on" structure: Ramp Interstate 290,  Year Built: 1978,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 42,500 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 67,120 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: HWY WB CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $980,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,471,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up
Find on map >>

Structure Number: M06021AM0MHDNBI,  Location: .6 MI NTH OF SOUTHBORO TL (Lat: 42.322222,  Lng: -71.571944),  Route carried "on" structure: Ramp Interstate 495,  Year Built: 2000,  Status: Open,  Structure Length: 22.01m (72.21ft),  Average Daily Traffic: 20,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,586 (year 2028),  Design Load: HS 20,  Features Intersected: I 495 & RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: M06022AM2MHDNBI,  Location: .5 MI N. OF SOUTHBORO T.L (Lat: 42.320556,  Lng: -71.571111),  Route carried "on" structure: Ramp Interstate 495,  Year Built: 2000,  Status: Open,  Structure Length: 17.59m (57.71ft),  Average Daily Traffic: 20,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,586 (year 2028),  Design Load: HS 20,  Features Intersected: I 495 & RAMP D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: M06023AX4MUNNBI,  Location: ENTRANCE TO SOL POND MALL,  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 29,120 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 45,989 (year 2027),  Design Load: HS 20,  Features Intersected: WATER ASSABET RIVER,  Facility Carried by Structure: HWY DONALD LYNCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.856,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $489,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $734,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: M06008217MHDNBI,  Location: FOREST ST/I-495 (Lat: 42.333333,  Lng: -71.583333),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 27,000 (year 0 ),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>

Structure Number: M06008217MHDNBI,  Location: FOREST ST/I-495 (Lat: 42.333333,  Lng: -71.583333),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 27,000 (year 0 ),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>

Structure Number: M060091L4MHDNBI,  Location: US 20 EB/I-495 (Lat: 42.350000,  Lng: -71.583333),  Route carried "under" structure: Interstate 495,  Year Built: 1962,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 27,000 (year 0 ),  Features Intersected: I 495 NB,  Facility Carried by Structure: US 20
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>

Structure Number: M060091L4MHDNBI,  Location: US 20 EB/I-495 (Lat: 42.350000,  Lng: -71.583333),  Route carried "under" structure: Interstate 495,  Year Built: 1962,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 27,000 (year 0 ),  Features Intersected: I 495 SB,  Facility Carried by Structure: US 20
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>

Structure Number: M06010298MHDNBI,  Location: 000063 STATUTORY (Lat: 42.350000,  Lng: -71.583333),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 43,700 (year 0 ),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>

Structure Number: M06010299MHDNBI,  Location: 000063 STATUTORY (Lat: 42.350000,  Lng: -71.583333),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 43,700 (year 0 ),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Discuss this city on our hugely popular Massachusetts forum

Back to: Marlborough, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.