![]() |
Bridge Statistics for Miles City, Montana (MT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Miles City, MT, Montana, Montana forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 66 meters (217ft) Total costs: $11,707,000 Total average daily traffic: 38,720 Total average daily truck traffic: 1,028 National Bridge Inventory (NBI) Registered Bridges for Miles City
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: I00094137+04601, Location: MILES CITY (Lat: 46.384792, Lng: -105.841664), Route carried "on" structure: Interstate 94, Year Built: 1961, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 3,660 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,172 (year 2026), Design Load: HS 20, Features Intersected: TONGUE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.122, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 34.1m (111.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Very good, Operating Rating: 35.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.80m (32.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $547,000, Roadway Improvement Cost: $547,000, Total Project Cost: $6,012,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: I00094137+04602, Location: MILES CITY (Lat: 46.385531, Lng: -105.842319), Route carried "on" structure: Interstate 94, Year Built: 1974, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 3,660 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,172 (year 2026), Design Load: HS 20, Features Intersected: TONGUE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.122, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 34.1m (111.9ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: I00094137+08981, Location: MILES CITY (Lat: 46.390411, Lng: -105.828600), Route carried "on" structure: Interstate 94, Year Built: 1961, Status: Open, Structure Length: 4.66m (15.29ft), Average Daily Traffic: 3,660 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,172 (year 2026), Design Load: HS 20, Features Intersected: SEP COUNTY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.191, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.6m (61.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.70m (18.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $255,000, Roadway Improvement Cost: $255,000, Total Project Cost: $2,802,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: I00094137+08982, Location: MILES CITY (Lat: 46.391211, Lng: -105.829061), Route carried "on" structure: Interstate 94, Year Built: 1974, Status: Open, Structure Length: 4.66m (15.29ft), Average Daily Traffic: 3,660 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,172 (year 2026), Design Load: HS 20, Features Intersected: SEP COUNTY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.191, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.6m (70.9ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 60.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: Febuary 2005, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: I00094138+03301, Location: MILES CITY (Lat: 46.393011, Lng: -105.822606), Route carried "on" structure: Interstate 94, Year Built: 1961, Status: Open, Structure Length: 4.82m (15.81ft), Average Daily Traffic: 3,680 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,195 (year 2026), Design Load: HS 20, Features Intersected: INT P-18 (MT 59) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.262, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Very good, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.80m (19.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $263,000, Roadway Improvement Cost: $263,000, Total Project Cost: $2,893,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: I00094138+03302, Location: MILES CITY (Lat: 46.394106, Lng: -105.822581), Route carried "on" structure: Interstate 94, Year Built: 1974, Status: Open, Structure Length: 5.15m (16.90ft), Average Daily Traffic: 3,680 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,195 (year 2026), Design Load: HS 20, Features Intersected: INT P-18 (MT 59) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.262, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 23.2m (76.1ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: Febuary 2005, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: I00094138+09121, Location: MILES CITY (Lat: 46.399481, Lng: -105.808578), Route carried "on" structure: Interstate 94, Year Built: 1962, Year Reconstructed: 1974, Status: Open, Structure Length: 0.65m (2.13ft), Average Daily Traffic: 3,680 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,195 (year 2026), Design Load: HS 20, Features Intersected: JR GRADE SEP Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 22.355, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.5m (21.3ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 37.8m (124.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: P00002002+02721, Location: MILES CITY (Lat: 46.403333, Lng: -105.851667), Route carried "on" structure: Business US 94, Year Built: 2007, Status: Open, Structure Length: 9.90m (32.48ft), Average Daily Traffic: 4,220 (year 2006), Truck Traffic: 2%, Average Future Daily Traffic: 4,642 (year 2026), Design Load: H 15, Features Intersected: TONGUE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.365, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 36.5m (119.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 2.2m (7.2ft), Curb-To-Curb Width: 15.6m (51.2ft), Out-to-Out Width: 18.1m (59.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 38.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 17.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Inspection Date: December 2006, Underwater Inspection Date: April 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: I00094137+08981, Location: MILES CITY (Lat: 46.390411, Lng: -105.828600), Route carried "under" structure: County highway 9227, Year Built: 1961, Structure Length: 4.66m (15.29ft), Average Daily Traffic: 100 (year 2000), Truck Traffic: 3%, Features Intersected: SEP COUNTY ROAD, Facility Carried by Structure: I 94 Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.6m (61.0ft) Find on map >>
Structure Number: I00094137+08982, Location: MILES CITY (Lat: 46.391211, Lng: -105.829061), Route carried "under" structure: County highway 9227, Year Built: 1974, Structure Length: 4.66m (15.29ft), Average Daily Traffic: 100 (year 2000), Truck Traffic: 3%, Features Intersected: SEP COUNTY ROAD, Facility Carried by Structure: I 94 Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft) Find on map >>
Structure Number: I00094138+03301, Location: MILES CITY (Lat: 46.393011, Lng: -105.822606), Route carried "under" structure: State highway 59, Year Built: 1961, Structure Length: 4.82m (15.81ft), Average Daily Traffic: 4,310 (year 2006), Truck Traffic: 2%, Features Intersected: INT P-18 (MT 59), Facility Carried by Structure: I 94 Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.349, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.1m (65.9ft) Find on map >>
Structure Number: I00094138+03302, Location: MILES CITY (Lat: 46.394106, Lng: -105.822581), Route carried "under" structure: State highway 59, Year Built: 1974, Structure Length: 5.15m (16.90ft), Average Daily Traffic: 4,310 (year 2006), Truck Traffic: 2%, Features Intersected: INT P-18 (MT 59), Facility Carried by Structure: I 94 Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.346, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.2m (76.1ft) Discuss this city on our hugely popular Montana forum Back to: Miles City, MT, Montana, All US cities.
|
![]() |