U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Moira, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Moira, NY, New York, New York forum, All US cities.


National Bridge Inventory (NBI) Statistics
Number of bridges: 22
Total length: 27 meters (89ft)
Total costs: $8,775,000
Total average daily traffic: 19,260
Total average daily truck traffic: 2,176
Total future (year 2014) average daily traffic: 23,350
National Bridge Inventory (NBI) Registered Bridges for Moira

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 4
  • 1930-1939: 2
  • 1940-1949: 1
  • 1950-1959: 3
  • 1960-1969: 2
  • 1970-1979: 2
  • 1980-1989: 2
  • 1990-1999: 4
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1960-1969: 3
  • 1970-1979: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 100891,  Location: 0.9 MI SW JCT RTS 11 + 95 (Lat: 44.814092,  Lng: -74.570831),  Route carried "on" structure: US 11,  Year Built: 1928,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 2,076 (year 2005),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,534 (year 2025),  Design Load: H 20,  Features Intersected: LAWRENCE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.434,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $370,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100892,  Location: 1.3 MI NE JCT RTS 11 + 95 (Lat: 44.828894,  Lng: -74.523986),  Route carried "on" structure: US 11,  Year Built: 1928,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 4,780 (year 2006),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,834 (year 2026),  Design Load: H 20,  Features Intersected: FARRINGTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $370,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100893,  Location: 2.5 MI NE JCT US11 & SH95 (Lat: 44.831106,  Lng: -74.509364),  Route carried "on" structure: US 11,  Year Built: 1928,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,780 (year 2006),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,834 (year 2026),  Design Load: H 20,  Features Intersected: LITT SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.533,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $531,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 103493,  Location: 1.6 MI N JCT SH 95 & US 1 (Lat: 44.842667,  Lng: -74.558458),  Route carried "on" structure: State highway 95,  Year Built: 1996,  Status: Open,  Structure Length: 2.22m (7.28ft),  Average Daily Traffic: 1,710 (year 2005),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,010 (year 2025),  Design Load: HS 25,  Features Intersected: FARRINGTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.639,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $866,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 106042,  Location: 3 MI N JCT SH 95 & US 11 (Lat: 44.860542,  Lng: -74.559625),  Route carried "on" structure: State highway 95,  Year Built: 1996,  Status: Open,  Structure Length: 2.25m (7.38ft),  Average Daily Traffic: 1,710 (year 2005),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,010 (year 2025),  Design Load: HS 25,  Features Intersected: FARRINGTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.388,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $878,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 22199,  Location: .5 MI NW OF MOIRA (Lat: 44.820364,  Lng: -74.566408),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 89 (year 2001),  Truck Traffic: 4%,  Average Future Daily Traffic: 107 (year 2021),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $140,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 333714,  Location: 2.5 MI NORTH OF BRUSHTON (Lat: 44.872622,  Lng: -74.505500),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 88 (year 1995),  Truck Traffic: 4%,  Average Future Daily Traffic: 106 (year 2015),  Design Load: HS 25,  Features Intersected: LITTLE SALMON RVR,  Facility Carried by Structure: JOHN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $263,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 333715,  Location: 1.7MI S SOUTH BOMBAY (Lat: 44.868811,  Lng: -74.539269),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 165 (year 1997),  Truck Traffic: 4%,  Average Future Daily Traffic: 198 (year 2017),  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: MAHONEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $429,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 333716,  Location: 2.2MI S SOUTH BOMBAY (Lat: 44.862153,  Lng: -74.544828),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 79 (year 1997),  Truck Traffic: 4%,  Average Future Daily Traffic: 95 (year 2017),  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: PERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $239,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333718,  Location: 1.2 MILES NORTH OF MOIRA (Lat: 44.835708,  Lng: -74.553642),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 469 (year 2000),  Truck Traffic: 4%,  Average Future Daily Traffic: 563 (year 2020),  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: BUCKWHEAT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $249,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 33372,  Location: 1.2MI S SOUTH BOMBAY (Lat: 44.873231,  Lng: -74.546214),  Route carried "on" structure: Other road ,  Year Built: 1915,  Status: Posted for load,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 48 (year 1994),  Truck Traffic: 4%,  Average Future Daily Traffic: 58 (year 2014),  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: KELLY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $198,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 333721,  Location: 2.4MI S SOUTH BOMBAY (Lat: 44.855122,  Lng: -74.565233),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 155 (year 1996),  Truck Traffic: 4%,  Average Future Daily Traffic: 186 (year 2016),  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: BEST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $257,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 333722,  Location: 2.4MI NW MOIRA (Lat: 44.838961,  Lng: -74.595694),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 56 (year 2001),  Truck Traffic: 4%,  Average Future Daily Traffic: 67 (year 2021),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: WANGUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $222,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 333723,  Location: 2MI NW MOIRA (Lat: 44.836333,  Lng: -74.589078),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 164 (year 1997),  Truck Traffic: 4%,  Average Future Daily Traffic: 197 (year 2017),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: RUSSELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $222,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 333724,  Location: 1.7 MI NW OF MOIRA (Lat: 44.832619,  Lng: -74.585847),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 43 (year 1995),  Truck Traffic: 4%,  Average Future Daily Traffic: 52 (year 2015),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: SLATER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $306,000 ( Estimate for 2007)
Find on map >>

Structure Number: 333725,  Location: 1.3MI N ALBURG (Lat: 44.796503,  Lng: -74.581650),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 43 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 52 (year 2023),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: ELMER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $140,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $224,000 ( Estimate for 2007)
Find on map >>

Structure Number: 333726,  Location: 1.2 MI NE OF ALBURG (Lat: 44.792553,  Lng: -74.575147),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 209 (year 2001),  Truck Traffic: 4%,  Average Future Daily Traffic: 251 (year 2021),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: ALBURG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $140,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $223,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 333727,  Location: 1.7 MI E OF MOIRA (Lat: 44.815267,  Lng: -74.526097),  Route carried "on" structure: City street ,  Year Built: 1959,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 255 (year 2001),  Truck Traffic: 4%,  Average Future Daily Traffic: 306 (year 2021),  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: CHANDLER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $196,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 333811,  Location: .5 MILE NW OF MOIRA (Lat: 44.823094,  Lng: -74.566111),  Route carried "on" structure: County highway ,  Year Built: 1943,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 602 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 803 (year 2025),  Features Intersected: LAWRENCE BROOK,  Facility Carried by Structure: MOIRA-ST LWRNC RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Inventory Rating: 98.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $265,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333818,  Location: 1.7 MI SE SOUTH BOMBAY (Lat: 44.872819,  Lng: -74.532994),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 231 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 277 (year 2025),  Features Intersected: LITTLE SALMON RVR,  Facility Carried by Structure: SAYLES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $367,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33382,  Location: 1.4 MI NE OF MOIRA (Lat: 44.833800,  Lng: -74.535753),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 809 (year 1999),  Truck Traffic: 4%,  Average Future Daily Traffic: 971 (year 2019),  Design Load: HS 25,  Features Intersected: FARRINGTON BROOK,  Facility Carried by Structure: SAYLES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $751,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $1,198,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 336333,  Location: .7 MI S OF BRUSHTON (Lat: 44.820664,  Lng: -74.520700),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 699 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 839 (year 2023),  Features Intersected: STONY BROOK,  Facility Carried by Structure: CR 7, GALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Inventory Rating: 19.5 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $762,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Moira, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.