National Bridge Inventory (NBI) Statistics
Number of bridges: 23
Total length: 45 meters (148ft)
Total costs: $12,091,000
Total average daily traffic: 68,087
Total average daily truck traffic: 4,198
Total future (year 2027) average daily traffic: 107,529
National Bridge Inventory (NBI) Registered Bridges for Monson

New bridges - Historical Statistics

  • Before 1900: 2
  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 3
  • 1930-1939: 6
  • 1940-1949: 2
  • 1950-1959: 7
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: M270011A2MHDNBI,  Location: JCT. GREEN STREET (Lat: 42.093611,  Lng: -72.311667),  Route carried "on" structure: State highway 32,  Year Built: 1956,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 3,900 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,159 (year 2027),  Design Load: H 20,  Features Intersected: WATER CHICOPEE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $143,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M27002172MUNNBI,  Location: E OF RT32 IN MONSON CTR (Lat: 42.098997,  Lng: -72.311889),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 741 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,170 (year 2028),  Design Load: H 15,  Features Intersected: WATER CHICOPEE BROOK,  Facility Carried by Structure: HWY CUSHMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $398,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M27003173MUNNBI,  Location: E OF RT32 IN MONSON CTR (Lat: 42.100967,  Lng: -72.313736),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 517 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 816 (year 2027),  Design Load: H 20,  Features Intersected: WATER CHICOPEE BROOK,  Facility Carried by Structure: HWY STATE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $614,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: M2700715TMUNNBI,  Location: AT PALMER LINE (Lat: 42.154600,  Lng: -72.332167),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Posted for load,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 2,000 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,159 (year 2027),  Features Intersected: WATER QUABOAG RIVER,  Facility Carried by Structure: HWY STATE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2006,  Underwater Inspection Date: December 2005,  Other Special Inspection Date: April 2007,  Bridge Improvement Cost: $1,794,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $2,692,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M270081A0MHDNBI,  Location: AT PALMER TL (Lat: 42.143678,  Lng: -72.313692),  Route carried "on" structure: State highway 32,  Year Built: 1924,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 8,147 (year 2001),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,867 (year 2028),  Design Load: H 20,  Features Intersected: WATER QUABOAG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2007,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $1,070,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,606,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M2701015UMUNNBI,  Location: .15 MI W OF RTE 32 (Lat: 42.144800,  Lng: -72.318456),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 647 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,022 (year 2028),  Design Load: H 15,  Features Intersected: WATER CHICOPEE BROOK,  Facility Carried by Structure: HWY HOSPITAL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Other Special Inspection Date: May 2007,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $364,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M2701115RMUNNBI,  Location: JUST E OF STATE AVE (Lat: 42.145833,  Lng: -72.328889),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Closed,  Structure Length: 1.55m (5.09ft),  Features Intersected: WATER QUABOAG STREAM,  Facility Carried by Structure: HWY HOSPITAL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Fair,  Channel: Good,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 6 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $635,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $953,000 ( Estimate for 2006),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: M27012ALRMHD634,  Location: HOVEY RD/CONRAIL (Lat: 42.158333,  Lng: -72.358039),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 3.59m (11.78ft),  Average Daily Traffic: 200 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 316 (year 2027),  Design Load: HS 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY HOVEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: M2701315VMUNNBI,  Location: JUST SW OF RTE 32 (Lat: 42.090889,  Lng: -72.312792),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1926,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 517 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 816 (year 2028),  Features Intersected: WATER CHICOPEE BROOK,  Facility Carried by Structure: HWY BLISS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $245,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M27014175MUNNBI,  Location: E OF RT32 S OF MONSON CTR (Lat: 42.093925,  Lng: -72.311275),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 1938,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 200 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2028),  Features Intersected: WATER CHICOPEE BROOK,  Facility Carried by Structure: HWY HAMPDEN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 22.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $376,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M27015176MUNNBI,  Location: 1.0 MI S OF MUNN RD (Lat: 42.073181,  Lng: -72.295053),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 200 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2028),  Design Load: H 15,  Features Intersected: WATER CONANT BROOK,  Facility Carried by Structure: HWY OLD WALES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 34.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Other Special Inspection Date: September 2007,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M27016177MUNNBI,  Location: 50 FT SO OF BLANCHARD RD (Lat: 42.064900,  Lng: -72.284733),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 259 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 409 (year 2027),  Features Intersected: WATER VINICA BROOK,  Facility Carried by Structure: HWY MOULTON HILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Inventory Rating: 86.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2006,  Other Special Inspection Date: May 2007,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $206,000 ( Estimate for 2006)
Find on map >>

Structure Number: M270181AJMHD634,  Location: BRIDGE ST/CNTRL-VRMNT R.R (Lat: 42.093758,  Lng: -72.314664),  Route carried "on" structure: State highway ,  Year Built: 1900,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 259 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 409 (year 2027),  Features Intersected: RR NECRR,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 53.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $118,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $178,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: M27021178MUNNBI,  Location: 0.2 M E OF RT 32 (Lat: 42.110058,  Lng: -72.313656),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,100 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,475 (year 2027),  Design Load: HS 20,  Features Intersected: WATER CHICOPEE BROOK,  Facility Carried by Structure: HWY CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $394,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: M27022193MHDNBI,  Location: .15M E OF JCT. ST 67 (Lat: 42.142611,  Lng: -72.281575),  Route carried "on" structure: US 20,  Year Built: 1939,  Status: Open,  Structure Length: 3.36m (11.02ft),  Average Daily Traffic: 10,350 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 16,346 (year 2027),  Design Load: H 20,  Features Intersected: WATER QUABOAG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 132.164,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2006,  Underwater Inspection Date: June 2005,  Bridge Improvement Cost: $923,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,385,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M270231A1MHDNBI,  Location: NEAR JCT. MAPLE STREET (Lat: 42.085000,  Lng: -72.310556),  Route carried "on" structure: State highway 32,  Year Built: 1956,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 3,900 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,159 (year 2027),  Design Load: H 20,  Features Intersected: WATER CONANT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.196,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $52,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: M270241ALMHD634,  Location: 0.1 M S JCT OF HIGH ST (Lat: 42.101308,  Lng: -72.318122),  Route carried "on" structure: State highway 32,  Year Built: 1920,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 8,017 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,661 (year 2029),  Features Intersected: RR NECRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.684,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Superstructure: Good,  Substructure: Good,  Inventory Rating: 78.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $130,000 ( Estimate for 2006),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M270261AHMHD634,  Location: E OF ST 32-BY STATE LINE (Lat: 42.046578,  Lng: -72.321761),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1960,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 388 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 613 (year 2028),  Features Intersected: RR NECRR,  Facility Carried by Structure: HWY STAFFORD HLW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 18.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $638,000 ( Estimate for 2006),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: M270321AKMHD634,  Location: ST 32/CHCPEE BRK & CV RR (Lat: 42.123844,  Lng: -72.307992),  Route carried "on" structure: State highway 32,  Year Built: 1937,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 12,155 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,196 (year 2028),  Design Load: H 20,  Features Intersected: COMB CHCPEE BRK & NECRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.879,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.10m (33.14ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Critical Feature Inspection Date: October 2007,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $781,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M2704215WMUNNBI,  Location: JUST S OF THOMPSON ST (Lat: 42.107483,  Lng: -72.317247),  Route carried "on" structure: State highway 32,  Year Built: 1956,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7,400 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,687 (year 2027),  Design Load: H 20,  Features Intersected: WATER MARGARET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.009,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 62.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $94,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M2704915XMUNNBI,  Location: .1 MI N OF HIGH ST (Lat: 42.108961,  Lng: -72.324806),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,800 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,422 (year 2027),  Design Load: H 20,  Features Intersected: WATER MARGARET BROOK,  Facility Carried by Structure: HWY MARGARET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 82.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 71.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $284,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M27050174MUNNBI,  Location: W OF RT32 NEAR MONSON CTR (Lat: 42.108122,  Lng: -72.320156),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,579 (year 2027),  Design Load: H 20,  Features Intersected: WATER MARGARET BROOK,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2006,  Other Special Inspection Date: March 2007,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $305,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: M27051179STANBI,  Location: @ RD TO HOSP. ADMIN (Lat: 42.143819,  Lng: -72.329575),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 390 (year 2003),  Truck Traffic: 7%,  Average Future Daily Traffic: 616 (year 2028),  Design Load: HS 20,  Features Intersected: WATER QUABOAG STREAM,  Facility Carried by Structure: HWY PRIVATE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Massachusetts forum

Back to: Monson, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.