![]() |
Bridge Statistics for Montvale, New Jersey (NJ) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Montvale, NJ, New Jersey, New Jersey forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 20 meters (66ft) Total costs: $26,000 Total average daily traffic: 188,410 Total average daily truck traffic: 1,738 National Bridge Inventory (NBI) Registered Bridges for Montvale
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 20036A, Location: 0.2 MI W.OF KINDERKAMAK R (Lat: 41.045000, Lng: -74.043056), Route carried "on" structure: County highway 2, Year Built: 1981, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 20,601 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 24,721 (year 2026), Design Load: HS 20, Features Intersected: PASCACK BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.595, Lanes on structure: 2, Base Highway Network: Yes, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 18.0m (59.1ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 20036B, Location: BTWN SUNNYSIDE & WOODLAND (Lat: 41.053333, Lng: -74.035000), Route carried "on" structure: City street , Year Built: 1976, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 1,820 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 2,180 (year 2026), Design Load: HS 20+Mod, Features Intersected: PASCACK BROOK, Facility Carried by Structure: MAGNOLIA AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 1.1m (3.6ft), Curb-To-Curb Width: 6.8m (22.3ft), Out-to-Out Width: 9.5m (31.2ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Channel: Very good, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 20036C, Location: 1500 FT S OF GRAND AVE (Lat: 41.043567, Lng: -74.014233), Route carried "on" structure: County highway 53, Year Built: 2004, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 4,682 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 5,618 (year 2026), Design Load: HS 20+Mod, Features Intersected: CHERRY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.028, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 2.5m (8.2ft), Right: 2.9m (9.5ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 19.5m (64.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Fair, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 20036D, Location: 0.03 Mile E of CR 53 (Lat: 41.046667, Lng: -74.021111), Route carried "on" structure: County highway 94, Year Built: 1973, Status: Open, Structure Length: 1.10m (3.61ft), Average Daily Traffic: 4,888 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 5,856 (year 2026), Design Load: HS 20+Mod, Features Intersected: CHERRY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.311, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.1m (33.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 51.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 361714S, Location: 8 MI N OF GSP & RT 17 JCT (Lat: 41.055000, Lng: -74.066667), Route carried "on" structure: Other road GSP, Year Built: 1956, Status: Open, Structure Length: 1.94m (6.36ft), Average Daily Traffic: 35,300 (year 2006), Average Future Daily Traffic: 42,400 (year 2026), Design Load: H 20, Features Intersected: GRAND AVENUE EXTENSION, Facility Carried by Structure: GARDEN ST PKWY SB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 275.842, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 13.1m (43.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.7m (58.1ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 14.2m (46.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $11,000, Roadway Improvement Cost: $1,000, Total Project Cost: $12,000 ( Estimate for 2002), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 361715N, Location: 8 MI N OF GSP & RT 17 JCT (Lat: 41.055000, Lng: -74.066667), Route carried "on" structure: Other road GSP, Year Built: 1956, Status: Open, Structure Length: 2.15m (7.05ft), Average Daily Traffic: 32,500 (year 2006), Average Future Daily Traffic: 39,000 (year 2026), Design Load: H 20, Features Intersected: GRAND AVENUE EXTENSION, Facility Carried by Structure: GARDEN ST PKWY NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 276.003, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.6m (64.3ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $9,000, Roadway Improvement Cost: $1,000, Total Project Cost: $10,000 ( Estimate for 2002), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 361716S, Location: 8.3 MI N OF GSP&RT 17 JCT (Lat: 41.058333, Lng: -74.066667), Route carried "on" structure: Other road GSP, Year Built: 1956, Status: Open, Structure Length: 1.99m (6.53ft), Average Daily Traffic: 39,000 (year 2006), Average Future Daily Traffic: 46,000 (year 2026), Design Load: H 20, Features Intersected: SUMMIT AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 276.163, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.1m (59.4ft), Curb-To-Curb Width: 12.9m (42.3ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2002), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 361717N, Location: 8.3 MI W OF GSP&RT 17 JCT (Lat: 41.058333, Lng: -74.066667), Route carried "on" structure: Other road GSP, Year Built: 1956, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 26,500 (year 2006), Average Future Daily Traffic: 35,700 (year 2026), Design Load: H 20, Features Intersected: SUMMIT AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 276.324, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 12.7m (41.7ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2002), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 361714S, Location: 8 MI N OF GSP & RT 17 JCT (Lat: 41.055000, Lng: -74.066667), Route carried "under" structure: City street , Year Built: 1956, Structure Length: 1.94m (6.36ft), Average Daily Traffic: 9,287 (year 2006), Truck Traffic: 3%, Features Intersected: GRAND AVENUE EXTENSION, Facility Carried by Structure: GARDEN ST PKWY SB Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft) Find on map >>
Structure Number: 361715N, Location: 8 MI N OF GSP & RT 17 JCT (Lat: 41.055000, Lng: -74.066667), Route carried "under" structure: City street , Year Built: 1956, Structure Length: 2.15m (7.05ft), Average Daily Traffic: 8,332 (year 2006), Truck Traffic: 3%, Features Intersected: GRAND AVENUE EXTENSION, Facility Carried by Structure: GARDEN ST PKWY NB Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 19.6m (64.3ft) Find on map >>
Structure Number: 361716S, Location: 8.3 MI N OF GSP&RT 17 JCT (Lat: 41.058333, Lng: -74.066667), Route carried "under" structure: City street , Year Built: 1956, Structure Length: 1.99m (6.53ft), Average Daily Traffic: 2,500 (year ), Features Intersected: SUMMIT AVENUE, Facility Carried by Structure: GSP SB Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.1m (59.4ft) Find on map >>
Structure Number: 361717N, Location: 8.3 MI W OF GSP&RT 17 JCT (Lat: 41.058333, Lng: -74.066667), Route carried "under" structure: City street , Year Built: 1956, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 3,000 (year ), Features Intersected: SUMMIT AVENUE, Facility Carried by Structure: GSP NB Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.2m (59.7ft) Discuss this city on our hugely popular New Jersey forum Back to: Montvale, NJ, New Jersey, All US cities.
|
![]() |