National Bridge Inventory (NBI) Statistics
Number of bridges: 35
Total length: 156 meters (512ft)
Total costs: $52,000
Total average daily traffic: 821,841
Total average daily truck traffic: 81,698
National Bridge Inventory (NBI) Registered Bridges for Montville

New bridges - Historical Statistics

  • 1920-1929: 5
  • 1930-1939: 0
  • 1940-1949: 1
  • 1950-1959: 14
  • 1960-1969: 10
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 3
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1980-1989: 2
  • 1990-1999: 9

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 26,  Location: 1.0 MI N OF ROUTE 32 (Lat: 41.428333,  Lng: -72.123333),  Route carried "on" structure: Alternate State highway 693,  Year Built: 1958,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 10,500 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,250 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-395 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 261,  Location: 3.8 MI N. OF ROUTE 85 (Lat: 41.420000,  Lng: -72.123333),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 528 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 264 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: MOXLEY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 81.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Other Special Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 262,  Location: 0.3 MI S OF ROUTE 163 (Lat: 41.440000,  Lng: -72.118333),  Route carried "on" structure: Interstate 395,  Year Built: 1958,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 57,900 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 28,950 (year 2026),  Design Load: HS 20,  Features Intersected: MAPLE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.734,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 28.6m (93.8ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 263,  Location: 100 FEET S. OF ROUTE 163 (Lat: 41.441667,  Lng: -72.116667),  Route carried "on" structure: Interstate 395,  Year Built: 1958,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 59,400 (year 2005),  Truck Traffic: 14%,  Average Future Daily Traffic: 29,700 (year 2026),  Design Load: HS 20,  Features Intersected: Oxoboxo Brk & NEC Aband.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.040,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 28.6m (93.8ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Other Special Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 264,  Location: .5 MILE WEST OF ROUTE 32 (Lat: 41.443333,  Lng: -72.116667),  Route carried "on" structure: Interstate 395,  Year Built: 1958,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 59,400 (year 2005),  Truck Traffic: 14%,  Average Future Daily Traffic: 29,700 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 163
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.137,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 28.6m (93.8ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 265,  Location: 1.3 MI NORTH OF ROUTE 163 (Lat: 41.450000,  Lng: -72.115000),  Route carried "on" structure: Interstate 395,  Year Built: 1958,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 59,200 (year 2005),  Truck Traffic: 15%,  Average Future Daily Traffic: 29,600 (year 2026),  Design Load: HS 20,  Features Intersected: RAYMOND HILL RD & BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.293,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 28.6m (93.8ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 266,  Location: .2 MILE SOUTH OF ROUTE 2A (Lat: 41.493333,  Lng: -72.115000),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 350 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 175 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: GALLIVAN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 267,  Location: 1.1 MI SOUTH OF ROUTE 82 (Lat: 41.498333,  Lng: -72.115000),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 700 (year 1993),  Truck Traffic: 2%,  Average Future Daily Traffic: 350 (year 2026),  Design Load: H 20,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: FITCH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.961,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 268,  Location: 0.8 MI S OF ROUTE 82 (Lat: 41.483333,  Lng: -72.115000),  Route carried "on" structure: Interstate 395,  Year Built: 1958,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 65,900 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 32,950 (year 2026),  Design Load: HS 20,  Features Intersected: LEFFINGWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.508,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1248,  Location: 3.4 MILES S OF ROUTE 82 (Lat: 41.446667,  Lng: -72.225000),  Route carried "on" structure: State highway 85,  Year Built: 1922,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 13,500 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,750 (year 2026),  Design Load: H 15,  Features Intersected: LATIMERS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.615,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Underwater Inspection Date: December 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1404,  Location: 0.2 MI N OF ROUTE 32 (Lat: 41.440000,  Lng: -72.111667),  Route carried "on" structure: State highway 163,  Year Built: 2001,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 7,300 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,650 (year 2026),  Design Load: HS 20,  Features Intersected: OXOBOXO BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1406,  Location: 3.3 MI S OF ROUTE 82 (Lat: 41.476667,  Lng: -72.163333),  Route carried "on" structure: State highway 163,  Year Built: 1925,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,200 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,100 (year 2026),  Design Load: HS 15,  Features Intersected: OXOBOXO BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.533,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3422,  Location: 0.9 MI W OF ROUTE 32 (Lat: 41.486667,  Lng: -72.115000),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1967,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 12,200 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,100 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-395
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.031,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3423,  Location: .3 MI EAST OF I-395 (Lat: 41.485000,  Lng: -72.105000),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1967,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 41,400 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,700 (year 2026),  Design Load: HS 20,  Features Intersected: GALLIVAN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.900,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 34 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3424,  Location: 2.2 MI W OF ROUTE 12 (Lat: 41.481667,  Lng: -72.098333),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1967,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 27,100 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,550 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.512,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3425,  Location: 1.5 MI E OF I-395 (Lat: 41.480000,  Lng: -72.086667),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1967,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 33,600 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,800 (year 2026),  Design Load: HS 20,  Features Intersected: SSR 433-MASSAPEAG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.574,  Lanes on structure: 5,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3426,  Location: 1.0 MILE EAST OF JCT 32 (Lat: 41.481667,  Lng: -72.076667),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1967,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 43.74m (143.50ft),  Average Daily Traffic: 27,100 (year 2005),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,550 (year 2026),  Design Load: HS 20,  Features Intersected: NE CENTRAL&P-W RR THAMES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.459,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 22.9m (75.1ft), Horizontal Clearance: 61.0m (200.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 83.8m (274.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2006,  Underwater Inspection Date: June 2006,  Other Special Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3966,  Location: 0.3 MI S OF ROUTE 32 (Lat: 41.435000,  Lng: -72.106667),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,416 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 708 (year 2026),  Features Intersected: OXOBOXO BROOK,  Facility Carried by Structure: PINK ROW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3967,  Location: 1000 FT NORTH OF ROUTE 32 (Lat: 41.485000,  Lng: -72.101667),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 6,501 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,251 (year 2026),  Design Load: HS 20,  Features Intersected: TRADING COVE BROOK,  Facility Carried by Structure: NEW LONDON TPKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 474,  Location: 75 FT WEST OF ROUTE 163 (Lat: 41.433333,  Lng: -72.130000),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 900 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 450 (year 2026),  Design Load: HS 20,  Features Intersected: OXOBOXO RIVER,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 4742,  Location: 0.2 MI W OF ROUTE 85 (Lat: 41.431667,  Lng: -72.220000),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 296 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 148 (year 2026),  Design Load: H 20,  Features Intersected: LATIMER BROOK,  Facility Carried by Structure: GRASSY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 532,  Location: 1.0 MI S OF ROUTE 85 (Lat: 41.415000,  Lng: -72.218333),  Route carried "on" structure: State highway 161,  Year Built: 1984,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 4,900 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,450 (year 2026),  Design Load: HS 20,  Features Intersected: LATIMERS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.311,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5545,  Location: 1.2 MI NORTH OF ROUTE 163 (Lat: 41.453333,  Lng: -72.106667),  Route carried "on" structure: State highway 32,  Year Built: 1927,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 12,400 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,200 (year 2026),  Design Load: HS 20,  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.909,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 5903,  Location: 100 FT N OF ROUTE 163 (Lat: 41.445000,  Lng: -72.110000),  Route carried "on" structure: State highway 32,  Year Built: 1927,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 12,900 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,450 (year 2026),  Design Load: HS 20,  Features Intersected: OXOBOXO BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.026,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6255,  Location: 1.6 MILES NORTH OF I-395 (Lat: 41.450000,  Lng: -72.140000),  Route carried "on" structure: State highway 163,  Year Built: 1993,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 5,400 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,700 (year 2026),  Design Load: HS 20,  Features Intersected: OXOBOXO BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.475,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6524,  Location: 1 MI E. OF ROUTE 32 (Lat: 41.475000,  Lng: -72.078822),  Route carried "on" structure: Ramp State highway 2A,  Year Built: 1996,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 5,000 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,500 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 2A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 26,  Location: 1.0 MI N OF ROUTE 32 (Lat: 41.428333,  Lng: -72.123333),  Route carried "under" structure: Interstate 395,  Year Built: 1958,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 18,450 (year 2004),  Truck Traffic: 10%,  Features Intersected: INTERSTATE-395 NB,  Facility Carried by Structure: SR 693 SOUTHBOUND
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 8.592,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>

Structure Number: 261,  Location: 3.8 MI N. OF ROUTE 85 (Lat: 41.420000,  Lng: -72.123333),  Route carried "under" structure: Interstate 395,  Year Built: 1958,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 59,400 (year 2005),  Truck Traffic: 10%,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: MOXLEY HILL ROAD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 9.252,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>

Structure Number: 264,  Location: .5 MILE WEST OF ROUTE 32 (Lat: 41.443333,  Lng: -72.116667),  Route carried "under" structure: State highway 163,  Year Built: 1958,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 8,500 (year 2005),  Truck Traffic: 5%,  Features Intersected: ROUTE 163,  Facility Carried by Structure: INTERSTATE-395
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.869,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>

Structure Number: 266,  Location: .2 MILE SOUTH OF ROUTE 2A (Lat: 41.493333,  Lng: -72.115000),  Route carried "under" structure: Interstate 395,  Year Built: 1958,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 57,300 (year 2003),  Truck Traffic: 10%,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: GALLIVAN LANE
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 14.932,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>

Structure Number: 267,  Location: 1.1 MI SOUTH OF ROUTE 82 (Lat: 41.498333,  Lng: -72.115000),  Route carried "under" structure: Interstate 395,  Year Built: 1958,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 63,000 (year 2004),  Truck Traffic: 14%,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: FITCH HILL ROAD
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 15.961,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>

Structure Number: 3422,  Location: 0.9 MI W OF ROUTE 32 (Lat: 41.486667,  Lng: -72.115000),  Route carried "under" structure: Interstate 395,  Year Built: 1967,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 45,500 (year 2006),  Truck Traffic: 15%,  Features Intersected: INTERSTATE-395,  Facility Carried by Structure: ROUTE 2A
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 15.286,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>

Structure Number: 3424,  Location: 2.2 MI W OF ROUTE 12 (Lat: 41.481667,  Lng: -72.098333),  Route carried "under" structure: State highway 32,  Year Built: 1967,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 16,300 (year 2004),  Truck Traffic: 10%,  Features Intersected: ROUTE 32,  Facility Carried by Structure: ROUTE 2A
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 14.368,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 3425,  Location: 1.5 MI E OF I-395 (Lat: 41.480000,  Lng: -72.086667),  Route carried "under" structure: State highway 433,  Year Built: 1967,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 1,100 (year 2004),  Truck Traffic: 2%,  Features Intersected: SSR 433-MASSAPEAG ROAD,  Facility Carried by Structure: ROUTE 2A
Minimum Vertical Clearance: 0.45m (1.48ft),  Kilometerpoint: 1.303,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 6524,  Location: 1 MI E. OF ROUTE 32 (Lat: 41.475000,  Lng: -72.078822),  Route carried "under" structure: Alternate State highway 2A,  Year Built: 1996,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 24,300 (year 2005),  Truck Traffic: 10%,  Features Intersected: ROUTE 2A
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 10.282,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Discuss this city on our hugely popular Connecticut forum

Back to: Montville, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.