Bridge Statistics for Mount Vernon, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 308ft / 93.8mTotal length
  • $368,217,000Total costs
  • 19,790Total average daily traffic
  • 751Total average daily truck traffic
  • 34,360Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mount Vernon
  • No street view available for this location

New bridges in Mount Vernon, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 31960-1969
  • 11970-1979
  • 21990-1999
  • 32010-2019
Average Bridge Daily Traffic in Mount Vernon, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Very good
  • 40.0%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 2090008,  Location: 3 MI S OF MT VERNON (Lat: 32.131469,  Lng: -82.564728),  Route carried "on" structure: US 221,  Year Built: 1970,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,140 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,710 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LOTTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $270,000
Find on map >>   Show street view

Structure Number: 2090009,  Location: 1 MI S OF MT VERNON (Lat: 32.162319,  Lng: -82.583269),  Route carried "on" structure: US 221,  Year Built: 1937,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,140 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,710 (year 2031),  Design Load: H 15,  Features Intersected: BRANCH LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2090026,  Location: 1 MI N OF MT VERNON (Lat: 32.207097,  Lng: -82.598458),  Route carried "on" structure: US 221,  Year Built: 1990,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,760 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,640 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 2090027,  Location: 3 MI N OF MT VERNON (Lat: 32.229181,  Lng: -82.606717),  Route carried "on" structure: US 221,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,620 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,430 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 2095008,  Location: 4 MI N OF MOUNT VERNON (Lat: 32.244750,  Lng: -82.578858),  Route carried "on" structure: County highway 35,  Year Built: 1961,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: BEAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $633,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2095013,  Location: 1 MI S OF MOUNT VERNON (Lat: 32.151589,  Lng: -82.601819),  Route carried "on" structure: County highway 134,  Year Built: 1965,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LIMESTONE CREEK,  Facility Carried by Structure: NORTH OLD RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2095014,  Location: 3 MI S OF MOUNT VERNON (Lat: 32.123628,  Lng: -82.591200),  Route carried "on" structure: County highway 134,  Year Built: 1965,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LOTTS CREEK,  Facility Carried by Structure: NORTH OLD RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000
Find on map >>   Show street view

Structure Number: 2095024,  Location: 1 MI W OF MT VERNON (Lat: 32.191517,  Lng: -82.616881),  Route carried "on" structure: US 280,  Year Built: 2013,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,390 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,585 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $10,656,000,  Roadway Improvement Cost: $1,065,000,  Total Project Cost: $15,984,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2095025,  Location: 1 MI W OF MT VERNON (Lat: 32.191467,  Lng: -82.620997),  Route carried "on" structure: US 280,  Year Built: 2013,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 4,390 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,585 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.70m (38.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $28,416,000,  Roadway Improvement Cost: $2,842,000,  Total Project Cost: $42,624,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3095034,  Location: 2 MI E OF GLENWOOD (Lat: 32.191286,  Lng: -82.628756),  Route carried "on" structure: US 280,  Year Built: 2014,  Status: Open,  Structure Length: 70.41m (231.00ft),  Average Daily Traffic: 3,550 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,000 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 84.49m (277.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $205,128,000,  Roadway Improvement Cost: $20,513,000,  Total Project Cost: $307,692,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place