National Bridge Inventory (NBI) Statistics
Number of bridges: 17
Total length: 65 meters (213ft)
Total costs: $12,415,000
Total average daily traffic: 14,488
Total average daily truck traffic: 1,295
Total future (year 2020) average daily traffic: 21,409
National Bridge Inventory (NBI) Registered Bridges for Murray

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 6
  • 1920-1929: 2
  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 3
  • 1990-1999: 0
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 103644,  Location: JCT RTE 104 + SANDY CK (Lat: 43.275044,  Lng: -78.050597),  Route carried "on" structure: State highway 104,  Year Built: 1960,  Status: Open,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 3,788 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,090 (year 2026),  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $860,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 104241,  Location: .1 MI S JCT SH104 & SH237 (Lat: 43.265842,  Lng: -78.031458),  Route carried "on" structure: State highway 237,  Year Built: 1954,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,836 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,600 (year 2027),  Features Intersected: E BRN SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.566,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $494,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>

Structure Number: 33192,  Location: 2.3 MI NE OF HOLLEY (Lat: 43.257453,  Lng: -78.008367),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 836 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,373 (year 2027),  Design Load: HS 20,  Features Intersected: E BRA SANDY CREEK,  Facility Carried by Structure: HURD RD CR 42
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Excellent,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $334,000,  Total Project Cost: $896,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331921,  Location: .1 MILE SOUTH OF MURRAY (Lat: 43.272222,  Lng: -78.046358),  Route carried "on" structure: City street ,  Year Built: 1934,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 385 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 533 (year 2026),  Features Intersected: E BRN SANDY CREEK,  Facility Carried by Structure: GROTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $338,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331922,  Location: 0.6 MI WEST OF MURRAY (Lat: 43.275022,  Lng: -78.056975),  Route carried "on" structure: County highway ,  Year Built: 1928,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 815 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,339 (year 2021),  Features Intersected: W BRN SANDY CREEK,  Facility Carried by Structure: HULBERTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $295,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331923,  Location: 0.9 MI NW BROCKVILLE (Lat: 43.263711,  Lng: -78.105667),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 97 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 134 (year 2026),  Features Intersected: W BRA SANDY CREEK,  Facility Carried by Structure: HINDSBURG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 72.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $295,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 331924,  Location: 1.3 MI NE OF BROCKVILLE (Lat: 43.264939,  Lng: -78.115631),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 310 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 509 (year 2020),  Features Intersected: W BR SANDY CREEK,  Facility Carried by Structure: TRANSIT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 71.9 metric tons,  Inventory Rating: 28.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $295,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331941,  Location: 3.3 MILES NW OF ALABAMA (Lat: 43.254300,  Lng: -77.996575),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 582 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 956 (year 2027),  Design Load: HS 25,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: ORL MNROE C LN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $294,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 331942,  Location: 2.9 MILES NW OF ALABAMA (Lat: 43.239931,  Lng: -77.996719),  Route carried "on" structure: County highway ,  Year Built: 1928,  Status: Open,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 582 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 956 (year 2027),  Features Intersected: E BR SANDY CREEK,  Facility Carried by Structure: MON-ORL CO LNE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 50.6 metric tons,  Inventory Rating: 14.6 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $294,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 444501,  Location: 1.1MI E JCT BARGE C+237 (Lat: 43.224681,  Lng: -78.013953),  Route carried "on" structure: City street ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 727 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,006 (year 2021),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: BENNETTS CORS RD
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 28.6m (93.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $147,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $235,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 444503,  Location: .5 MI W JCT SH237/TELG RD (Lat: 43.244653,  Lng: -78.039436),  Route carried "on" structure: County highway ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 559 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 918 (year 2021),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: TELEGRAPH ROAD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 43.8m (143.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $858,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 444504,  Location: 1.3 MI W JCT CANAL &SH237 (Lat: 43.249631,  Lng: -78.046211),  Route carried "on" structure: City street ,  Year Built: 1911,  Year Reconstructed: 2004,  Status: Posted for load,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 246 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 340 (year 2021),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: GROTH ROAD
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.9m (167.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $858,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 444505,  Location: 1.3 MI E JCT BG CL &SH387 (Lat: 43.254244,  Lng: -78.066300),  Route carried "on" structure: County highway ,  Year Built: 1913,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 792 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,301 (year 2021),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: HULBERTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.1m (121.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Critical Feature Inspection Date: October 2006,  Bridge Improvement Cost: $595,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $949,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 444506,  Location: 0.7MI W JCT BARGE C+387 (Lat: 43.253147,  Lng: -78.105847),  Route carried "on" structure: City street ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 187 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 259 (year 2027),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: HINDSBURG ROAD
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $595,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $949,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 444507,  Location: 1.2 MI W JCT BG CNL&SH387 (Lat: 43.251747,  Lng: -78.115642),  Route carried "on" structure: County highway ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 394 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 647 (year 2021),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: TRANSIT ROAD
Minimum Vertical Clearance: 2.77m (9.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 28.6m (93.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Critical Feature Inspection Date: September 2007,  Bridge Improvement Cost: $595,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $949,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 444528,  Location: JCT SH 237 & BARGE CANAL (Lat: 43.237392,  Lng: -78.026600),  Route carried "on" structure: State highway 237,  Year Built: 1984,  Status: Open,  Structure Length: 11.18m (36.68ft),  Average Daily Traffic: 1,836 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,600 (year 2027),  Design Load: HS 20,  Features Intersected: CANAL ACCESS ROAD, ERIE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.443,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.9m (163.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.18m (36.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $668,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $1,065,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 444529,  Location: JCT RTE 387 +BARGE CANAL (Lat: 43.253647,  Lng: -78.090936),  Route carried "on" structure: State highway 387,  Year Built: 1985,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 516 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 848 (year 2026),  Design Load: HS 20,  Features Intersected: ERIE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.413,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,562,000,  Roadway Improvement Cost: $929,000,  Total Project Cost: $2,491,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete

Discuss this city on our hugely popular New York forum

Back to: Murray, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.