![]() |
Bridge Statistics for Narragansett, Rhode Island (RI) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Narragansett, RI, Rhode Island, Rhode Island forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 52 meters (171ft) Total costs: $16,793,000 Total average daily traffic: 95,500 Total average daily truck traffic: 9,550 National Bridge Inventory (NBI) Registered Bridges for Narragansett
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 17, Location: 1.0 Mi E of JCT US 1 (Lat: 41.449333, Lng: -71.448833), Route carried "on" structure: Alternate US 1A, Year Built: 1981, Status: Open, Structure Length: 4.69m (15.39ft), Average Daily Traffic: 9,500 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 11,258 (year 2028), Design Load: HS 20, Features Intersected: NARROW RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 4.69m (15.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $2,874,000, Roadway Improvement Cost: $287,000, Total Project Cost: $4,311,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 344, Location: 0.5 Mi W of JCT US 1A (Lat: 41.491667, Lng: -71.446167), Route carried "on" structure: State highway , Year Built: 1934, Status: Open, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 9,800 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 15,194 (year 2028), Design Load: H 20, Features Intersected: PETTAQUAMSCUTT RIVER, Facility Carried by Structure: BRIDGETOWN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.62m (5.31ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: Febuary 2007, Underwater Inspection Date: May 2003, Bridge Improvement Cost: $625,000, Roadway Improvement Cost: $63,000, Total Project Cost: $938,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 481, Location: 0.1 Mi N of Scenic 1A (Lat: 41.435667, Lng: -71.482000), Route carried "on" structure: US 1, Year Built: 1962, Status: Temporarily open, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 13,000 (year 2006), Truck Traffic: 10%, Design Load: HS 20+Mod, Features Intersected: RI 108 KING RD&PT JDH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 29.3m (96.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.6m (2.0ft), Curb-To-Curb Width: 11.4m (37.4ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Operating Rating: 63.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.58m (18.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $1,463,000, Roadway Improvement Cost: $146,000, Total Project Cost: $2,194,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 4812, Location: 0.1 Mi N of Scenic 1A (Lat: 41.435667, Lng: -71.482333), Route carried "on" structure: US 1, Year Built: 1962, Status: Temporarily open, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 12,700 (year 2006), Truck Traffic: 10%, Design Load: HS 20+Mod, Features Intersected: RI 108 KING.RD&PT JDH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.6m (90.6ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.0m, Curb-To-Curb Width: 11.4m (37.4ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Operating Rating: 55.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 4.18m (13.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $1,698,000, Roadway Improvement Cost: $170,000, Total Project Cost: $2,547,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 482, Location: 0.3 Mi W of JCT 1A (Lat: 41.432167, Lng: -71.481500), Route carried "on" structure: Ramp US 1, Year Built: 1963, Status: Temporarily open, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 7,900 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 9,000 (year 2028), Design Load: HS 20+Mod, Features Intersected: RI 108 POINT JUDITH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 65.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 4.66m (15.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $2,535,000, Roadway Improvement Cost: $254,000, Total Project Cost: $3,803,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 483, Location: 0.1 Mi N of JCT RI 108 (Lat: 41.431333, Lng: -71.484167), Route carried "on" structure: Alternate County highway , Year Built: 1963, Status: Open, Structure Length: 5.82m (19.09ft), Average Daily Traffic: 7,900 (year 1992), Truck Traffic: 10%, Design Load: HS 20+Mod, Features Intersected: US 1 POST RD, Facility Carried by Structure: WOODRUFF AV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 18.6m (61.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.7m (58.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 67.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 5.73m (18.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $194,000, Roadway Improvement Cost: $19,000, Total Project Cost: $291,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 499, Location: 0.1 Mi N of Galilee Rd (Lat: 41.381500, Lng: -71.506333), Route carried "on" structure: City street , Year Built: 1959, Status: Posted for load, Structure Length: 5.49m (18.01ft), Average Daily Traffic: 1,700 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 2,481 (year 2028), Design Load: H 15, Features Intersected: TIDAL FLATS (INLET), Facility Carried by Structure: GREAT ISLAND RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 2 degrees, Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 22.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 5.49m (18.01ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Underwater Inspection Date: May 1996, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $1,806,000, Roadway Improvement Cost: $181,000, Total Project Cost: $2,709,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 481, Location: 0.1 Mi N of Scenic 1A (Lat: 41.435667, Lng: -71.482000), Route carried "under" structure: Alternate State highway 108, Year Built: 1962, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 6,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 108 KING RD&PT JDH RD, Facility Carried by Structure: US 1 NB POST RD Minimum Vertical Clearance: 4.36m (14.30ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.3m (96.1ft) Find on map >>
Structure Number: 4812, Location: 0.1 Mi N of Scenic 1A (Lat: 41.435667, Lng: -71.482333), Route carried "under" structure: Alternate State highway 108, Year Built: 1962, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 6,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 108 KING.RD&PT JDH RD, Facility Carried by Structure: US 1 SB POST RD Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft) Find on map >>
Structure Number: 482, Location: 0.3 Mi W of JCT 1A (Lat: 41.432167, Lng: -71.481500), Route carried "under" structure: State highway 108, Year Built: 1963, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 10,000 (year 2006), Truck Traffic: 10%, Features Intersected: RI 108 POINT JUDITH RD, Facility Carried by Structure: US 1 POST RD RAMP Minimum Vertical Clearance: 4.29m (14.07ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft) Find on map >>
Structure Number: 483, Location: 0.1 Mi N of JCT RI 108 (Lat: 41.431333, Lng: -71.484167), Route carried "under" structure: US 1, Year Built: 1963, Structure Length: 5.82m (19.09ft), Average Daily Traffic: 10,000 (year 2006), Truck Traffic: 10%, Features Intersected: US 1 POST RD, Facility Carried by Structure: WOODRUFF AV Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.6m (61.0ft) Discuss this city on our hugely popular Rhode Island forum Back to: Narragansett, RI, Rhode Island, All US cities.
|
![]() |