![]() |
Bridge Statistics for National City, California (CA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: National City, CA, California, California forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 92 Total length: 1,078 meters (3,537ft) Total costs: $11,104,000 Total average daily traffic: 5,170,314 Total average daily truck traffic: 202,501 National Bridge Inventory (NBI) Registered Bridges for National City
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 57C0672, Location: 0.1 mile N/O 8th Street (Lat: 32.675167, Lng: -117.115028), Route carried "on" structure: City street , Year Built: 1995, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 8,400 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 10,339 (year 2029), Design Load: HS 20+Mod, Features Intersected: LA PALETA CREEK, Facility Carried by Structure: HARBOR DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 6, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 28.1m (92.2ft), Skew: 22 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.2m (40.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 27.5m (90.2ft), Out-to-Out Width: 31.7m (104.0ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 57C0679, Location: 0.5 Mi S of 30TH ST (Lat: 32.648889, Lng: -117.096944), Route carried "on" structure: City street S127, Year Built: 2000, Status: Open, Structure Length: 11.80m (38.71ft), Average Daily Traffic: 20,000 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 26,106 (year 2028), Design Load: HS 20+Mod, Features Intersected: S CHNL SWEETWATER RIVER, Facility Carried by Structure: NATIONAL CITY BLVD Minimum Vertical Clearance: 99.90m (327.76ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 20.8m (68.2ft), Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 5, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 20.8m (68.2ft), Out-to-Out Width: 24.4m (80.1ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Channel: Excellent, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 57 0251L, Location: 11-SD-005-R10.04-NATC (Lat: 32.660050, Lng: -117.108169), Route carried "under" structure: City street S460, Year Built: 1965, Structure Length: 4.69m (15.39ft), Average Daily Traffic: 3,790 (year 2004), Truck Traffic: 1%, Features Intersected: 24TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft) Find on map >>
Structure Number: 57 0251R, Location: 11-SD-005-R10.04-NATC (Lat: 32.660139, Lng: -117.107858), Route carried "under" structure: City street S460, Year Built: 1965, Structure Length: 4.75m (15.58ft), Average Daily Traffic: 3,790 (year 1998), Truck Traffic: 1%, Features Intersected: 24TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.2m (86.0ft) Find on map >>
Structure Number: 57 0252L, Location: 11-SD-005-R10.43-NATC (Lat: 32.665328, Lng: -117.110328), Route carried "under" structure: City street S199, Year Built: 1965, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 13,200 (year 1998), Truck Traffic: 1%, Features Intersected: 18TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 12.2m (40.0ft) Find on map >>
Structure Number: 57 0252R, Location: 11-SD-005-R10.43-NATC (Lat: 32.665419, Lng: -117.110028), Route carried "under" structure: City street S199, Year Built: 1951, Structure Length: 3.14m (10.30ft), Average Daily Traffic: 13,200 (year 2004), Truck Traffic: 1%, Features Intersected: 18TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 12.2m (40.0ft) Find on map >>
Structure Number: 57 0464L, Location: 11-SD-005-R10.39-NATC (Lat: 32.664692, Lng: -117.110061), Route carried "under" structure: City street , Year Built: 1965, Structure Length: 3.99m (13.09ft), Average Daily Traffic: 2,280 (year 2004), Truck Traffic: 1%, Features Intersected: 19TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 14.3m (46.9ft) Find on map >>
Structure Number: 57 0464R, Location: 11-SD-005-R10.39-NATC (Lat: 32.664900, Lng: -117.109831), Route carried "under" structure: City street S199, Year Built: 1965, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 2,280 (year 2004), Truck Traffic: 1%, Features Intersected: 19TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 14.3m (46.9ft) Find on map >>
Structure Number: 57 0467L, Location: 11-SD-005-R10.68-NATC (Lat: 32.668792, Lng: -117.111447), Route carried "under" structure: Ramp Interstate 5, Year Built: 1964, Structure Length: 4.75m (15.58ft), Average Daily Traffic: 80,500 (year 1997), Truck Traffic: 5%, Features Intersected: N5-HARBOR DR OFF-RAMP Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 1.068, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 17.7m (58.1ft) Find on map >>
Structure Number: 57 0467R, Location: 11-SD-005-R10.68-NATC (Lat: 32.668611, Lng: -117.111150), Route carried "under" structure: Ramp Interstate 5, Year Built: 1964, Structure Length: 4.82m (15.81ft), Average Daily Traffic: 80,500 (year 1997), Truck Traffic: 5%, Features Intersected: HARBOR DR OFF-RAMP Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 1.068, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.9m (62.0ft) Find on map >>
Structure Number: 57 0468K, Location: 11-SD-005-R10.72-NATC (Lat: 32.669550, Lng: -117.111817), Route carried "under" structure: City street S103, Year Built: 1964, Structure Length: 11.58m (37.99ft), Average Daily Traffic: 11,700 (year 2004), Truck Traffic: 1%, Features Intersected: I 5 ON & OFF-RAMPS, Facility Carried by Structure: CIVIC CENTER DR UC Minimum Vertical Clearance: 0.79m (2.59ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft) Find on map >>
Structure Number: 57 0468K, Location: 11-SD-005-R10.72-NATC (Lat: 32.669550, Lng: -117.111817), Route carried "under" structure: Ramp City street S103, Year Built: 1964, Structure Length: 11.58m (37.99ft), Average Daily Traffic: 9,960 (year 2004), Truck Traffic: 2%, Features Intersected: I 5 ON & OFF-RAMPS, Facility Carried by Structure: CIVIC CENTER DR UC Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft) Find on map >>
Structure Number: 57 0468K, Location: 11-SD-005-R10.72-NATC (Lat: 32.669550, Lng: -117.111817), Route carried "under" structure: Ramp City street S103, Year Built: 1964, Structure Length: 11.58m (37.99ft), Average Daily Traffic: 6,200 (year 2004), Truck Traffic: 1%, Features Intersected: I 5 ON & OFF-RAMPS, Facility Carried by Structure: CIVIC CENTER DR UC Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft) Find on map >>
Structure Number: 57 0468L, Location: 11-SD-005-R10.75-NATC (Lat: 32.669758, Lng: -117.111544), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 17.10m (56.10ft), Average Daily Traffic: 11,700 (year 2004), Truck Traffic: 1%, Features Intersected: MTDB LRT & SDIV RR, Facility Carried by Structure: INTERSTATE 5 SB Minimum Vertical Clearance: 8.63m (28.31ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft) Find on map >>
Structure Number: 57 0468R, Location: 11-SD-005-R10.75-NATC (Lat: 32.669850, Lng: -117.111261), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 14.08m (46.19ft), Average Daily Traffic: 11,700 (year 2004), Truck Traffic: 1%, Features Intersected: MTDB LRT & SDIV RR, Facility Carried by Structure: INTERSTATE 5 NB Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft) Find on map >>
Structure Number: 57 0468S, Location: 11-SD-005-R10.75-NATC (Lat: 32.670417, Lng: -117.110942), Route carried "under" structure: City street S103, Year Built: 1964, Structure Length: 17.22m (56.50ft), Average Daily Traffic: 11,700 (year 2004), Truck Traffic: 1%, Features Intersected: MTDB LRT & SDIV RR, Facility Carried by Structure: N5-CIVIC CENTER OF Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft) Find on map >>
Structure Number: 57 0468S, Location: 11-SD-005-R10.75-NATC (Lat: 32.670417, Lng: -117.110942), Route carried "under" structure: Ramp City street , Year Built: 1964, Structure Length: 17.22m (56.50ft), Average Daily Traffic: 5,000 (year 2004), Truck Traffic: 1%, Features Intersected: MTDB LRT & SDIV RR, Facility Carried by Structure: N5-CIVIC CENTER OF Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft) Find on map >>
Structure Number: 57 0469, Location: 11-SD-005-R11.13-NATC (Lat: 32.675072, Lng: -117.109644), Route carried "under" structure: City street S202, Year Built: 1964, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 18,584 (year 2003), Truck Traffic: 1%, Features Intersected: 8TH STREET, Facility Carried by Structure: INTERSTATE 5 Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft) Find on map >>
Structure Number: 57 0639K, Location: 11-SD-805-9.05-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street S198, Year Built: 1974, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 30,600 (year 2003), Truck Traffic: 4%, Features Intersected: SWEETWATER RD, Facility Carried by Structure: S805-SWEETWATER RD Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.8m (133.9ft) Find on map >>
Structure Number: 57 0639L, Location: 11-SD-805-9.05-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street S198, Year Built: 1974, Structure Length: 8.44m (27.69ft), Average Daily Traffic: 30,600 (year 2003), Truck Traffic: 4%, Features Intersected: SWEETWATER RD, Facility Carried by Structure: INTERSTATE 805 Minimum Vertical Clearance: 7.42m (24.34ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft) Find on map >>
Structure Number: 57 0639R, Location: 11-SD-805-9.05-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street S198, Year Built: 1974, Structure Length: 8.44m (27.69ft), Average Daily Traffic: 30,600 (year 2003), Truck Traffic: 4%, Features Intersected: SWEETWATER RD, Facility Carried by Structure: INTERSTATE 805 Minimum Vertical Clearance: 6.32m (20.73ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft) Find on map >>
Structure Number: 57 0640F, Location: 11-SD-805-9.19-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street S155, Year Built: 1974, Structure Length: 20.42m (66.99ft), Average Daily Traffic: 28,200 (year 2003), Truck Traffic: 2%, Features Intersected: EUCLID AV, SWEETWATER RD, Facility Carried by Structure: S805-E&W54 CONNECT Minimum Vertical Clearance: 9.14m (29.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.5m (136.2ft) Find on map >>
Structure Number: 57 0640F, Location: 11-SD-805-9.19-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street , Year Built: 1974, Structure Length: 20.42m (66.99ft), Average Daily Traffic: 30,600 (year 2003), Truck Traffic: 5%, Features Intersected: EUCLID AV, SWEETWATER RD, Facility Carried by Structure: S805-E&W54 CONNECT Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.5m (136.2ft) Find on map >>
Structure Number: 57 0640L, Location: 11-SD-805-9.19-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street S155, Year Built: 1974, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 28,200 (year 2003), Truck Traffic: 2%, Features Intersected: EUCLID AVE, Facility Carried by Structure: RTE 805 Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.7m (90.9ft) Find on map >>
Structure Number: 57 0640R, Location: 11-SD-805-9.19-NATC (Lat: 32.661667, Lng: -117.076667), Route carried "under" structure: City street S155, Year Built: 1974, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 20,800 (year 2003), Truck Traffic: 2%, Features Intersected: EUCLID AVE, Facility Carried by Structure: ROUTE 805 NB Minimum Vertical Clearance: 0.67m (2.20ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.7m (90.9ft) Find on map >>
Structure Number: 57 0641, Location: 11-SD-805-9.99-NATC (Lat: 32.671667, Lng: -117.081667), Route carried "under" structure: Interstate 805, Year Built: 1974, Structure Length: 8.29m (27.20ft), Average Daily Traffic: 214,000 (year 1998), Truck Traffic: 4%, Features Intersected: INTERSTATE 805, Facility Carried by Structure: 18TH ST OC Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.999, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.4m (149.0ft) Find on map >>
Structure Number: 57 0642, Location: 11-SD-805-10.11-NATC (Lat: 32.675000, Lng: -117.081667), Route carried "under" structure: Interstate 805, Year Built: 1974, Structure Length: 9.33m (30.61ft), Average Daily Traffic: 214,000 (year 1998), Truck Traffic: 4%, Features Intersected: INTERSTATE 805, Facility Carried by Structure: 16TH STREET Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 1.011, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft) Find on map >>
Structure Number: 57 0643, Location: 11-SD-805-10.28-NATC (Lat: 32.675000, Lng: -117.085000), Route carried "under" structure: City street S201, Year Built: 1975, Structure Length: 4.63m (15.19ft), Average Daily Traffic: 30,400 (year 2003), Truck Traffic: 4%, Features Intersected: PLAZA BLVD, Facility Carried by Structure: I 805 Minimum Vertical Clearance: 0.51m (1.67ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft) Find on map >>
Structure Number: 57 0644, Location: 11-SD-805-10.61-NATC (Lat: 32.681667, Lng: -117.086667), Route carried "under" structure: City street S202, Year Built: 1975, Structure Length: 3.72m (12.20ft), Average Daily Traffic: 23,200 (year 2003), Truck Traffic: 1%, Features Intersected: EIGHTH STREET, Facility Carried by Structure: INTERSTATE 805 Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft) Find on map >>
Structure Number: 57 0645, Location: 11-SD-805-10.88-NATC (Lat: 32.685000, Lng: -117.090000), Route carried "under" structure: Interstate 805, Year Built: 1975, Structure Length: 9.44m (30.97ft), Average Daily Traffic: 214,000 (year 1998), Truck Traffic: 4%, Features Intersected: INTERSTATE 805, Facility Carried by Structure: 4TH ST Minimum Vertical Clearance: 5.35m (17.55ft), Kilometerpoint: 1.088, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft) Find on map >>
Structure Number: 57 0646, Location: 11-SD-805-R11.14-NATC (Lat: 32.688333, Lng: -117.093333), Route carried "under" structure: City street , Year Built: 1975, Structure Length: 4.91m (16.11ft), Average Daily Traffic: 11,800 (year 2003), Truck Traffic: 2%, Features Intersected: DIVISION STREET, Facility Carried by Structure: ROUTE 805 Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft) Find on map >>
Structure Number: 57 0646S, Location: 11-SD-805-11.14-NATC (Lat: 32.688333, Lng: -117.093333), Route carried "under" structure: City street S204, Year Built: 1975, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 11,800 (year 2003), Truck Traffic: 2%, Features Intersected: DIVISION STREET, Facility Carried by Structure: N805-43RD ST OFFRP Minimum Vertical Clearance: 5.68m (18.64ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft) Find on map >>
Structure Number: 57 0748, Location: 11-SD-054-2.27-NATC (Lat: 32.660625, Lng: -117.068678), Route carried "under" structure: State highway 54, Year Built: 1974, Structure Length: 14.30m (46.92ft), Average Daily Traffic: 113,000 (year 1998), Truck Traffic: 1%, Features Intersected: ROUTE 54, Facility Carried by Structure: SWEETWATER RD Minimum Vertical Clearance: 0.51m (1.67ft), Kilometerpoint: 0.227, Lanes on structure: 6, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.8m (183.1ft) Find on map >>
Structure Number: 57 0751, Location: 11-SD-805-9.48-NATC (Lat: 32.666667, Lng: -117.078333), Route carried "under" structure: Interstate 805, Year Built: 1974, Structure Length: 9.17m (30.09ft), Average Daily Traffic: 214,000 (year 1998), Truck Traffic: 4%, Features Intersected: INTERSTATE 805, Facility Carried by Structure: GROVE STREET Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.948, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 52.1m (170.9ft) Find on map >>
Structure Number: 57 0764, Location: 11-SD-054-.39-NATC (Lat: 32.652647, Lng: -117.097889), Route carried "under" structure: State highway 54, Year Built: 1988, Structure Length: 24.14m (79.20ft), Average Daily Traffic: 91,000 (year 1999), Truck Traffic: 1%, Features Intersected: SR 54 & SWEETWATER RIVER, Facility Carried by Structure: NATIONAL CITY BLVD Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.039, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.7m (117.1ft) Find on map >>
Structure Number: 57 0765, Location: 11-SD-054-.89-NATC (Lat: 32.655506, Lng: -117.089906), Route carried "under" structure: State highway 54, Year Built: 1989, Structure Length: 20.88m (68.50ft), Average Daily Traffic: 91,000 (year 1999), Truck Traffic: 6%, Features Intersected: ROUTE 54 & SWEETWATER RI, Facility Carried by Structure: HIGHLAND AVENUE Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.089, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft) Find on map >>
Structure Number: 57 0788, Location: 11-SD-805-9.74-NATC (Lat: 32.668333, Lng: -117.080000), Route carried "under" structure: Interstate 805, Year Built: 1974, Structure Length: 14.26m (46.78ft), Average Daily Traffic: 214,000 (year 1998), Truck Traffic: 5%, Features Intersected: 22ND STREET POC Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.974, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.1m (115.2ft) Find on map >>
Structure Number: 57 0790G, Location: 11-SD-805-R11.22-NATC (Lat: 32.686667, Lng: -117.091667), Route carried "under" structure: City street , Year Built: 1975, Structure Length: 27.43m (89.99ft), Average Daily Traffic: 10,600 (year 2003), Truck Traffic: 1%, Features Intersected: DIVISION ST & 47TH ST, Facility Carried by Structure: 43RD ST-S805 ONRAM Minimum Vertical Clearance: 0.51m (1.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.2m (141.7ft) Find on map >>
Structure Number: 57 0790G, Location: 11-SD-805-R11.22-NATC (Lat: 32.686667, Lng: -117.091667), Route carried "under" structure: City street , Year Built: 1975, Structure Length: 27.43m (89.99ft), Average Daily Traffic: 11,800 (year 2003), Truck Traffic: 1%, Features Intersected: DIVISION ST & 47TH ST, Facility Carried by Structure: 43RD ST-S805 ONRAM Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.2m (141.7ft) Find on map >>
Structure Number: 57 0845F, Location: 11-SD-054-.01-NATC (Lat: 32.651131, Lng: -117.104156), Route carried "under" structure: Interstate 5, Year Built: 1991, Structure Length: 57.06m (187.20ft), Average Daily Traffic: 154,000 (year 2000), Truck Traffic: 4%, Features Intersected: I 5, SWEETWATER,MTDB LRT Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.094, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.2m (181.1ft) Find on map >>
Structure Number: 57 0845F, Location: 11-SD-054-.01-NATC (Lat: 32.651131, Lng: -117.104156), Route carried "under" structure: Ramp Interstate 5, Year Built: 1991, Structure Length: 57.06m (187.20ft), Average Daily Traffic: 17,000 (year 2000), Truck Traffic: 4%, Features Intersected: I 5, SWEETWATER,MTDB LRT Minimum Vertical Clearance: 0.51m (1.67ft), Kilometerpoint: 0.094, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.2m (181.1ft) Find on map >>
Structure Number: 57 0946F, Location: 11-SD-005-9.4-NATC (Lat: 32.650472, Lng: -117.103472), Route carried "under" structure: Interstate 5, Year Built: 1988, Structure Length: 44.44m (145.80ft), Average Daily Traffic: 154,000 (year 2000), Truck Traffic: 4%, Features Intersected: I 5, SWEETWATER, LRT Minimum Vertical Clearance: 0.52m (1.71ft), Kilometerpoint: 0.094, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft) Find on map >>
Structure Number: 57 1001, Location: 11-SD-054-3-NATC (Lat: 32.664306, Lng: -117.057403), Route carried "under" structure: State highway 54, Year Built: 1993, Structure Length: 7.44m (24.41ft), Average Daily Traffic: 113,000 (year 1998), Truck Traffic: 1%, Features Intersected: ROUTE 54, Facility Carried by Structure: REO DRIVE Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.030, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft) Find on map >>
Structure Number: 57 1002, Location: 11-SD-054-4.21-NATC (Lat: 32.673244, Lng: -117.039222), Route carried "under" structure: State highway 54, Year Built: 1996, Structure Length: 6.62m (21.72ft), Average Daily Traffic: 59,000 (year 1999), Truck Traffic: 1%, Features Intersected: ROUTE 54, Facility Carried by Structure: WOODMAN STREET Minimum Vertical Clearance: 6.42m (21.06ft), Kilometerpoint: 0.421, Lanes on structure: 4, Lanes under structure: 6, Toll: Toll bridge, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.2m (118.8ft) Find on map >>
Structure Number: 57 1003, Location: 11-SD-054-5-NATC (Lat: 32.681519, Lng: -117.030072), Route carried "under" structure: State highway 54, Year Built: 1996, Structure Length: 7.55m (24.77ft), Average Daily Traffic: 59,000 (year 1999), Truck Traffic: 1%, Features Intersected: ROUTE 54, Facility Carried by Structure: BRIARWOOD ROAD Minimum Vertical Clearance: 0.59m (1.94ft), Kilometerpoint: 0.050, Lanes on structure: 7, Lanes under structure: 6, Toll: Toll bridge, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.1m (151.2ft) Find on map >>
Structure Number: 57C0084, Location: 11-SD-460-0-NATC (Lat: 32.660000, Lng: -117.106944), Route carried "under" structure: City street S460, Year Built: 1951, Structure Length: 4.54m (14.90ft), Average Daily Traffic: 25,000 (year 1991), Truck Traffic: 2%, Features Intersected: MTDB LRT & SDIV RR, Facility Carried by Structure: 24TH ST Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft) Find on map >>
Structure Number: 57C0085, Location: 11-SD-199-0-NATC (Lat: 32.665833, Lng: -117.108889), Route carried "under" structure: City street , Year Built: 1951, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 500 (year 1991), Truck Traffic: 2%, Features Intersected: MTDB LRT & SDIV RR, Facility Carried by Structure: 18TH STREET Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 17.7m (58.1ft) Discuss this city on our hugely popular California forum Back to: National City, CA, California, All US cities.
|
![]() |