![]() |
Bridge Statistics for New Haven, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: New Haven, VT, Vermont, Vermont forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 33 meters (108ft) Total costs: $10,871,000 Total average daily traffic: 14,279 Total average daily truck traffic: 1,162 Total future (year 2015) average daily traffic: 21,418 National Bridge Inventory (NBI) Registered Bridges for New Haven
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100113001101131, Location: 0.01 MI TO JCT W CL2 TH2 (Lat: 44.092222, Lng: -73.107778), Route carried "on" structure: Other road C2004, Year Built: 1969, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 800 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 1,200 (year 2018), Design Load: H 20, Features Intersected: NEW HAVEN RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.6m (47.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.3m (4.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Channel: Good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.66m (12.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,119,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,269,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 100113001701131, Location: 0.2 MI TO JCT C3 TH 8 (Lat: 44.148333, Lng: -73.179167), Route carried "on" structure: Other road C3020, Year Built: 1919, Year Reconstructed: 1988, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 70 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 105 (year 2018), Features Intersected: BR LITTLE OTTER CRK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Channel: Fair, Operating Rating: 50.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $371,000, Roadway Improvement Cost: $150,000, Total Project Cost: $521,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 100113001901131, Location: 0.2 MI TO JCT C3 TH 8 (Lat: 44.157500, Lng: -73.167778), Route carried "on" structure: Other road C3009, Year Built: 1919, Status: Open, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 200 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 300 (year 2018), Features Intersected: BR LITTLE OTTER CRK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 6.2m (20.3ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 21.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 12.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.71m (5.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $150,000, Total Project Cost: $485,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100113002201131, Location: 0.3 MI S JCT VT 17 (Lat: 44.088333, Lng: -73.228889), Route carried "on" structure: Other road C3024, Year Built: 1980, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 100 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 150 (year 2018), Design Load: HS 20, Features Intersected: BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 52.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.43m (4.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $355,000, Roadway Improvement Cost: $150,000, Total Project Cost: $505,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 100113002501131, Location: 0.7 MI TO JCT W US7 (Lat: 44.143889, Lng: -73.188611), Route carried "on" structure: Other road C3008, Year Built: 1997, Status: Open, Structure Length: 3.78m (12.40ft), Average Daily Traffic: 229 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 343 (year 2024), Design Load: HS 25, Features Intersected: VERMONT RAILWAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 36.6m (120.1ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 7.2m (23.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 78.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 4.54m (14.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,044,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,194,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100113002601131, Location: 0.5 MI TO JCT C3 TH 25 (Lat: 44.071111, Lng: -73.194167), Route carried "on" structure: Other road C3007, Year Built: 1908, Year Reconstructed: 1968, Status: Closed, Structure Length: 4.63m (15.19ft), Average Daily Traffic: 650 (year 1998), Truck Traffic: 2%, Average Future Daily Traffic: 975 (year 2018), Features Intersected: OTTER CREEK Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 45.1m (148.0ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Channel: Good, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 5.55m (18.21ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2006, Critical Feature Inspection Date: June 2006, Bridge Improvement Cost: $864,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,014,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 100113003001131, Location: 0.25 MI TO JCT W US7 (Lat: 44.062222, Lng: -73.171111), Route carried "on" structure: Other road C2005, Year Built: 1927, Status: Open, Structure Length: 5.52m (18.11ft), Average Daily Traffic: 200 (year 1998), Truck Traffic: 1%, Average Future Daily Traffic: 300 (year 2018), Features Intersected: NEW HAVEN RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 6.3m (20.7ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Fair, Channel: Poor, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.61m (21.69ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Inspection Date: June 2006, Underwater Inspection Date: August 2000, Bridge Improvement Cost: $1,492,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,642,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 200019012901132, Location: 4.8 MI S JCT. VT.17 E (Lat: 44.063056, Lng: -73.168333), Route carried "on" structure: US 7, Year Built: 1960, Status: Open, Structure Length: 7.71m (25.30ft), Average Daily Traffic: 7,900 (year 1998), Truck Traffic: 10%, Average Future Daily Traffic: 11,850 (year 2018), Design Load: HS 20, Features Intersected: NEW HAVEN RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 164.617, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.3m (83.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Poor, Channel: Fair, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.47m (27.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $2,562,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,712,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200032001101132, Location: 0.2 MI E JCT. U.S.7 (Lat: 44.122222, Lng: -73.177222), Route carried "on" structure: State highway 17, Year Built: 1955, Status: Open, Structure Length: 0.61m (2.00ft), Average Daily Traffic: 2,500 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 3,750 (year 2018), Design Load: H 15, Features Intersected: BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 24.206, Lanes on structure: 2, Base Highway Network: Yes (Inventory Route: 100000, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 1.8m (5.9ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.61m (2.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $104,000, Roadway Improvement Cost: $25,000, Total Project Cost: $129,000 ( Estimate for 2007) Find on map >>
Structure Number: 200183001001132, Location: 1.1 MI E JCT. U.S.7 (Lat: 44.060833, Lng: -73.148611), Route carried "on" structure: County highway 2, Year Built: 1934, Status: Open, Structure Length: 5.18m (16.99ft), Average Daily Traffic: 1,630 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 2,445 (year 2015), Design Load: H 15, Features Intersected: NEW HAVEN RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Serious, Superstructure: Satisfactory, Substructure: Poor, Channel: Poor, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 6.22m (20.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,250,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,400,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Discuss this city on our hugely popular Vermont forum Back to: New Haven, VT, Vermont, All US cities.
|
![]() |