Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 10675,  Location: .7 MI E JCT440+W SHORE EX (Lat: 40.528394,  Lng: -74.216731),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 7,071 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,589 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 909C, RTE 909C,  Facility Carried by Structure: BLOOMINGDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $7,154,000,  Roadway Improvement Cost: $4,189,000,  Total Project Cost: $11,343,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1067511,  Location: 1 MI E JCT SH440 & WS EXP (Lat: 40.529956,  Lng: -74.211069),  Route carried "on" structure: Interstate 909C,  Year Built: 1971,  Status: Open,  Structure Length: 2.43m (7.97ft),  Average Daily Traffic: 15,920 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,629 (year 2040),  Design Load: HS 20,  Features Intersected: MAGUIRE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,746,000,  Roadway Improvement Cost: $1,608,000,  Total Project Cost: $4,354,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1067512,  Location: 1 MI E JCT SH440 & WS EXP (Lat: 40.529750,  Lng: -74.211042),  Route carried "on" structure: Interstate 909C,  Year Built: 1971,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 15,920 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,629 (year 2040),  Design Load: HS 20,  Features Intersected: MAGUIRE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,781,000,  Roadway Improvement Cost: $1,629,000,  Total Project Cost: $4,410,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 106752,  Location: 1.5 MI E JCT SH440 &WS EX (Lat: 40.532197,  Lng: -74.203000),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 8,206 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,968 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 909C, RTE 909C,  Facility Carried by Structure: FOSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $6,456,000,  Roadway Improvement Cost: $3,781,000,  Total Project Cost: $10,237,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106753,  Location: 2 MI E JCT SH440 & WS EXP (Lat: 40.534878,  Lng: -74.193289),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 5,480 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,657 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 909C, RTE 909C,  Facility Carried by Structure: HUGUENOT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $7,080,000,  Roadway Improvement Cost: $4,146,000,  Total Project Cost: $11,227,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067541,  Location: 2.6 MI E JCT SH440 &WS EX (Lat: 40.541694,  Lng: -74.185328),  Route carried "on" structure: State highway 909C,  Year Built: 1968,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 15,920 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,629 (year 2040),  Design Load: HS 20,  Features Intersected: ALBEE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.666,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $1,346,000,  Total Project Cost: $3,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067542,  Location: 2.6 MI E JCT SH440 &WS EX (Lat: 40.541542,  Lng: -74.185153),  Route carried "on" structure: State highway 909C,  Year Built: 1968,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 15,920 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,629 (year 2040),  Design Load: HS 20,  Features Intersected: ALBEE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.666,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $1,346,000,  Total Project Cost: $3,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067561,  Location: 3.1 MI E JCT SH440 &WS EX (Lat: 40.546781,  Lng: -74.180933),  Route carried "on" structure: City street 909C,  Year Built: 1968,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 15,920 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,629 (year 2040),  Design Load: HS 20,  Features Intersected: ARDEN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.342,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,241,000,  Roadway Improvement Cost: $1,312,000,  Total Project Cost: $3,554,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067562,  Location: 3.1 MI E JCT SH440 &WS EX (Lat: 40.546672,  Lng: -74.180725),  Route carried "on" structure: State highway 909C,  Year Built: 1968,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 15,920 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,629 (year 2040),  Design Load: HS 20,  Features Intersected: ARDEN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.342,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,241,000,  Roadway Improvement Cost: $1,312,000,  Total Project Cost: $3,554,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106757,  Location: 3.7MI E JCT440+W SHORE EX (Lat: 40.555247,  Lng: -74.176006),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 5,636 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,846 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 909C, 909C 909CX6M12,  Facility Carried by Structure: ANNADALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.156,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.3m (115.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $10,112,000,  Roadway Improvement Cost: $5,922,000,  Total Project Cost: $16,034,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 10676,  Location: JCT I278+440 (Lat: 40.610375,  Lng: -74.154206),  Route carried "on" structure: Ramp City street 440,  Year Built: 1962,  Status: Open,  Structure Length: 6.06m (19.88ft),  Average Daily Traffic: 11,404 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,572 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.06m (19.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,951,000,  Roadway Improvement Cost: $1,728,000,  Total Project Cost: $4,679,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067611,  Location: JCT I278+440 (Lat: 40.612350,  Lng: -74.153681),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 6.30m (20.67ft),  Average Daily Traffic: 97,460 (year 2011),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.537,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $5,349,000,  Roadway Improvement Cost: $3,132,000,  Total Project Cost: $8,481,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067612,  Location: JCT I278+440 (Lat: 40.612075,  Lng: -74.153747),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 6.30m (20.67ft),  Average Daily Traffic: 72,377 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 92,483 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, 440 440X6M12105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.537,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,281,000,  Roadway Improvement Cost: $2,507,000,  Total Project Cost: $6,788,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067621,  Location: .4MI N JCT I278+440 (Lat: 40.617539,  Lng: -74.152189),  Route carried "on" structure: State highway 440,  Year Built: 1964,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 14,237 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,553 (year 2040),  Design Load: HS 20,  Features Intersected: WATCHOGUE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.586,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,428,000,  Roadway Improvement Cost: $1,422,000,  Total Project Cost: $3,850,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067622,  Location: .4MI N JCT I278+440 (Lat: 40.617531,  Lng: -74.151953),  Route carried "on" structure: State highway 440,  Year Built: 1964,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 14,237 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,553 (year 2040),  Design Load: HS 20,  Features Intersected: WATCHOGUE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.586,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,282,000,  Roadway Improvement Cost: $1,336,000,  Total Project Cost: $3,618,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067631,  Location: .9MI N JCT I278+440 (Lat: 40.624922,  Lng: -74.146339),  Route carried "on" structure: City street 440,  Year Built: 1964,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 13,124 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,182 (year 2040),  Design Load: HS 20,  Features Intersected: FOREST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.568,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,541,000,  Roadway Improvement Cost: $1,488,000,  Total Project Cost: $4,028,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067632,  Location: .9MI N JCT I278+440 (Lat: 40.624917,  Lng: -74.146125),  Route carried "on" structure: State highway 440,  Year Built: 1964,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 13,124 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,182 (year 2040),  Design Load: HS 20,  Features Intersected: FOREST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.568,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,244,000,  Roadway Improvement Cost: $1,314,000,  Total Project Cost: $3,558,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106764,  Location: JCT 440+WALKER ST (Lat: 40.630911,  Lng: -74.145664),  Route carried "on" structure: City street ,  Year Built: 1964,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 5,607 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,002 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: WALKER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $6,034,000,  Roadway Improvement Cost: $3,533,000,  Total Project Cost: $9,567,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1067651,  Location: JCT I278+W SHORE EXPY (Lat: 40.625050,  Lng: -74.177700),  Route carried "on" structure: Interstate 278,  Year Built: 1963,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 38,018 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 60,148 (year 2022),  Design Load: HS 20,  Features Intersected: FOREST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,217,000,  Roadway Improvement Cost: $1,884,000,  Total Project Cost: $5,101,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067652,  Location: JCT I278+W SHORE EXPY (Lat: 40.624942,  Lng: -74.177925),  Route carried "on" structure: Interstate 278,  Year Built: 1963,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 31,765 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 40,588 (year 2040),  Design Load: HS 20,  Features Intersected: FOREST AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.29m (14.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,810,000,  Roadway Improvement Cost: $1,645,000,  Total Project Cost: $4,455,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 106766,  Location: JCT I278 & W SHORE EXPY (Lat: 40.622575,  Lng: -74.175178),  Route carried "on" structure: Ramp State highway 440,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 5,295 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,765 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, RTE I278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,123,000,  Roadway Improvement Cost: $2,415,000,  Total Project Cost: $6,538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106767,  Location: JCT I278 + W SHORE EXPY (Lat: 40.621878,  Lng: -74.173106),  Route carried "on" structure: State highway 440,  Year Built: 1962,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 91,417 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 112,717 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, RTE I278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.465,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.6m (93.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,368,000,  Roadway Improvement Cost: $2,558,000,  Total Project Cost: $6,926,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067681,  Location: JCT I278 & SH 440 (Lat: 40.621214,  Lng: -74.168714),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 63,685 (year 2011),  Truck Traffic: 12%,  Design Load: HS 20,  Features Intersected: SOUTH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.912,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,245,000,  Roadway Improvement Cost: $1,900,000,  Total Project Cost: $5,145,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067682,  Location: JCT I278 & SH 440 (Lat: 40.621014,  Lng: -74.168856),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 71,084 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 90,830 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.912,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,399,000,  Roadway Improvement Cost: $2,576,000,  Total Project Cost: $6,974,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067691,  Location: JCT I278+RICHMOND AVE (Lat: 40.615200,  Lng: -74.157358),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 90,370 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 90,370 (year 2031),  Design Load: HS 20,  Features Intersected: RICHMOND AVE, RICHMOND A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.119,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,817,000,  Roadway Improvement Cost: $2,821,000,  Total Project Cost: $7,638,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067692,  Location: JCT I278+RICHMOND AVE (Lat: 40.614928,  Lng: -74.157486),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 78,237 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 99,971 (year 2040),  Design Load: HS 20,  Features Intersected: RICHMOND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.119,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,817,000,  Roadway Improvement Cost: $2,821,000,  Total Project Cost: $7,638,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067701,  Location: JCT I278+440 (Lat: 40.613133,  Lng: -74.154714),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,997 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,551 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,463,000,  Roadway Improvement Cost: $2,028,000,  Total Project Cost: $5,490,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067702,  Location: JCT I278+440 (Lat: 40.612931,  Lng: -74.154878),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 72,377 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 92,483 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.425,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,461,000,  Roadway Improvement Cost: $2,027,000,  Total Project Cost: $5,488,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067711,  Location: JCT I278+VICTORY BLVD (Lat: 40.609578,  Lng: -74.150019),  Route carried "on" structure: Interstate 278,  Year Built: 1962,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 73,668 (year 2013),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: VICTORY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,596,000,  Roadway Improvement Cost: $2,691,000,  Total Project Cost: $7,288,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067712,  Location: JCT I278+VICTORY BLVD (Lat: 40.609500,  Lng: -74.150381),  Route carried "on" structure: City street 278,  Year Built: 1962,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 85,480 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 109,225 (year 2040),  Design Load: HS 20,  Features Intersected: VICTORY BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.972,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.7m (100.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,029,000,  Roadway Improvement Cost: $3,531,000,  Total Project Cost: $9,559,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106772,  Location: .7MI E JCT I278+440 (Lat: 40.607581,  Lng: -74.140881),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 5,504 (year 2020),  Average Future Daily Traffic: 6,686 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, RTE I278,  Facility Carried by Structure: WOOLLEY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $5,464,000,  Roadway Improvement Cost: $3,200,000,  Total Project Cost: $8,664,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106773,  Location: 1.2MI E JCT I278+440 (Lat: 40.608042,  Lng: -74.132092),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 7,653 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,688 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, RTE I278,  Facility Carried by Structure: BRADLEY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,486,000,  Roadway Improvement Cost: $3,798,000,  Total Project Cost: $10,284,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067741,  Location: 4.8MI W JCT I278+BELT PKY (Lat: 40.609894,  Lng: -74.121378),  Route carried "on" structure: Interstate 278,  Year Built: 2015,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 3,620 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,625 (year 2040),  Design Load: HS 20,  Features Intersected: MANOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 27.9m (91.5ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,857,000,  Roadway Improvement Cost: $2,844,000,  Total Project Cost: $7,702,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1067742,  Location: 4.8MI W JCT I278+BELT PKY (Lat: 40.609667,  Lng: -74.121331),  Route carried "on" structure: Interstate 278,  Year Built: 2015,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 85,480 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 109,225 (year 2040),  Design Load: HL 93,  Features Intersected: MANOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.482,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 24.3m (79.7ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,251,000,  Roadway Improvement Cost: $2,490,000,  Total Project Cost: $6,741,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1067751,  Location: 4.5MI W JCT I278+BELT PKY (Lat: 40.611108,  Lng: -74.116797),  Route carried "on" structure: Interstate 278,  Year Built: 2014,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 71,305 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 99,826 (year 2031),  Design Load: HL 93,  Features Intersected: SLOSSON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.900,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,623,000,  Roadway Improvement Cost: $3,293,000,  Total Project Cost: $8,916,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1067752,  Location: 4.5MI W JCT I278+BELT PKY (Lat: 40.610883,  Lng: -74.116764),  Route carried "on" structure: Interstate 278,  Year Built: 2016,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 82,478 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 105,389 (year 2040),  Design Load: HL 93,  Features Intersected: SLOSSON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.948,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 29.4m (96.5ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,113,000,  Roadway Improvement Cost: $3,580,000,  Total Project Cost: $9,692,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 106778,  Location: 3.9 Mi W Jct I278 & Belt (Lat: 40.610344,  Lng: -74.105339),  Route carried "on" structure: Interstate 278,  Year Built: 2014,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 142,609 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 199,653 (year 2031),  Design Load: HL 93,  Features Intersected: Renwick Ave.
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 8.866,  Lanes on structure: 10,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.1m (161.1ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 49.0m (160.8ft),  Out-to-Out Width: 51.2m (168.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,403,000,  Roadway Improvement Cost: $2,578,000,  Total Project Cost: $6,981,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.