![]() |
Bridge Statistics for Newbury, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Newbury, MA, Massachusetts, Massachusetts forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 16 Total length: 77 meters (253ft) Total costs: $15,235,000 Total average daily traffic: 298,040 Total average daily truck traffic: 24,108 National Bridge Inventory (NBI) Registered Bridges for Newbury
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: N100012RGMUNNBI, Location: 0.5MI W OF RT.1 (Lat: 42.758917, Lng: -70.901708), Route carried "on" structure: City street , Year Built: 1995, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 900 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 1,421 (year 2028), Design Load: HS 20, Features Intersected: WATER PARKER RIVER, Facility Carried by Structure: HWY MIDDLE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.062, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.4m (57.1ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 49.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.50m (11.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $825,000, Roadway Improvement Cost: $83,000, Total Project Cost: $1,238,000 ( Estimate for 2006), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: N10003AF8MUNNBI, Location: .62 K SOUTH OF NEWBURYPO (Lat: 42.784444, Lng: -70.868611), Route carried "on" structure: City street , Year Built: 1997, Status: Open, Structure Length: 1.78m (5.84ft), Average Daily Traffic: 6,500 (year 2007), Truck Traffic: 9%, Average Future Daily Traffic: 10,265 (year 2028), Design Load: HS 20, Features Intersected: WATER LITTLE RIVER, Facility Carried by Structure: HWY HANOVER ST Minimum Vertical Clearance: 0.00m, Kilometerpoint: 0.177, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.7m (54.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 63.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 41.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.80m (5.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $376,000, Roadway Improvement Cost: $38,000, Total Project Cost: $565,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: N100042TBMHDNBI, Location: .2 MI S MBTA (Lat: 42.791858, Lng: -70.878575), Route carried "on" structure: State highway 1, Year Built: 1922, Year Reconstructed: 1935, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 10,300 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 16,267 (year 2028), Design Load: H 20, Features Intersected: WATER LITTLE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 117.238, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 19.8m (65.0ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 19.8m (65.0ft), Out-to-Out Width: 22.9m (75.1ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Channel: Good, Operating Rating: 47.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.80m (2.62ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $328,000, Roadway Improvement Cost: $33,000, Total Project Cost: $493,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: N10006AU8MUNNBI, Location: 1.2MI E OF RT.1 (Lat: 42.771639, Lng: -70.862233), Route carried "on" structure: City street , Year Built: 2000, Status: Open, Structure Length: 2.72m (8.92ft), Average Daily Traffic: 1,050 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 1,658 (year 2028), Design Load: HS 20, Features Intersected: WATER LITTLE RIVER, Facility Carried by Structure: HWY NEWMAN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.386, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.6m (44.6ft), Curb-To-Curb Width: 6.8m (22.3ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 57.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: N10008AGTMUNNBI, Location: 0.48 KM E OF I 95 (Lat: 42.749025, Lng: -70.940117), Route carried "on" structure: City street , Year Built: 2000, Status: Open, Structure Length: 1.71m (5.61ft), Average Daily Traffic: 400 (year 2006), Truck Traffic: 1%, Average Future Daily Traffic: 632 (year 2027), Design Load: HS 20, Features Intersected: WATER PARKER RIVER, Facility Carried by Structure: HWY LARKIN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.644, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.7m (51.5ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 6.8m (22.3ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 39.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: N100092TAMHDNBI, Location: 2.6 MI S MBTA (Lat: 42.759181, Lng: -70.892725), Route carried "on" structure: US 1, Year Built: 1972, Status: Open, Structure Length: 5.24m (17.19ft), Average Daily Traffic: 8,700 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 13,740 (year 2027), Design Load: HS 20, Features Intersected: WATER PARKER RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 113.287, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 16.5m (54.1ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 25.9m (85.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 61.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.30m (17.39ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: August 2006, Underwater Inspection Date: August 2007, Bridge Improvement Cost: $288,000, Roadway Improvement Cost: $29,000, Total Project Cost: $433,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100102TTMHDNBI, Location: 2.8 MI S NEWBURY TOWN HAL (Lat: 42.762244, Lng: -70.848267), Route carried "on" structure: Alternate State highway 1A, Year Built: 1930, Status: Closed, Structure Length: 11.09m (36.38ft), Average Daily Traffic: 5,690 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 8,986 (year 2028), Design Load: H 20, Features Intersected: WATER PARKER RIVER, Facility Carried by Structure: ST 1 A/HIGH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 113.185, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.9m (6.2ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.5m (41.0ft) Condition: Deck: Fair, Superstructure: Serious, Substructure: Serious, Channel: Fair, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 12.00m (39.37ft), Designated Inspection Frequency: Every 6 months, Underwater Inspection Frequency: Every 12 months, Inspection Date: November 2007, Underwater Inspection Date: September 2007, Bridge Improvement Cost: $4,799,000, Roadway Improvement Cost: $480,000, Total Project Cost: $7,199,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100112Y6MHDNBI, Location: .75 MI WEST ATLANTIC OCN (Lat: 42.797714, Lng: -70.821575), Route carried "on" structure: State highway , Year Built: 1973, Status: Open, Structure Length: 4.11m (13.48ft), Average Daily Traffic: 7,500 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 11,845 (year 2027), Design Load: H 20, Features Intersected: WATER PLUM ISLAND RIVER, Facility Carried by Structure: HWY PLM ISLN TPK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.736, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Navigation Control: Yes ( Vertical Clearance: 4.0m (13.1ft), Horizontal Clearance: 12.2m (40.0ft)), Material/Design: Steel, Design/Construction: Movable - Bascule, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 29.0m (95.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 11.7m (38.4ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 43.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 31.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.20m (13.78ft), Designated Inspection Frequency: Every 22 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 22 months, Inspection Date: September 2006, Critical Feature Inspection Date: September 2006, Underwater Inspection Date: September 2007, Bridge Improvement Cost: $878,000, Roadway Improvement Cost: $88,000, Total Project Cost: $1,318,000 ( Estimate for 2006), Deck Structure Type: Open Grating Find on map >>
Structure Number: N10015AVUMHD634, Location: .3K N LITTLE RIVER (Lat: 42.794558, Lng: -70.877481), Route carried "on" structure: State highway 1, Year Built: 1998, Status: Open, Structure Length: 17.40m (57.09ft), Average Daily Traffic: 8,900 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 14,056 (year 2028), Design Load: HS 20, Features Intersected: RR MBTA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 117.331, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.0m (78.7ft), Skew: 36 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 38.5m (126.3ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 22.4m (73.5ft), Out-to-Out Width: 23.2m (76.1ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 66.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: N100202VJMHDNBI, Location: .3 MI S CENTRAL STREET (Lat: 42.751919, Lng: -70.945439), Route carried "on" structure: Interstate 95, Year Built: 1976, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 49,400 (year 2007), Truck Traffic: 12%, Average Future Daily Traffic: 78,017 (year 2028), Design Load: HS 20+Mod, Features Intersected: WATER PARKER RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 129.066, Lanes on structure: 8, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 22.3m (73.2ft), Skew: 12 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 19.7m (64.6ft), Out-to-Out Width: 21.1m (69.2ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: November 2007, Underwater Inspection Date: June 2007, Bridge Improvement Cost: $1,032,000, Roadway Improvement Cost: $104,000, Total Project Cost: $1,549,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100202VKMHDNBI, Location: .3 MI S CENTRAL STREET (Lat: 42.752142, Lng: -70.945589), Route carried "on" structure: Interstate 95, Year Built: 1951, Year Reconstructed: 1976, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 49,400 (year 2007), Truck Traffic: 12%, Average Future Daily Traffic: 78,017 (year 2028), Design Load: HS 20+Mod, Features Intersected: WATER PARKER RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 129.066, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 12 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 20.5m (67.3ft), Out-to-Out Width: 21.9m (71.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: November 2007, Underwater Inspection Date: June 2007, Bridge Improvement Cost: $96,000, Roadway Improvement Cost: $10,000, Total Project Cost: $145,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100212Y2MHDNBI, Location: QUARTER MILE N PARKER RIV (Lat: 42.756594, Lng: -70.942656), Route carried "on" structure: State highway , Year Built: 1976, Status: Open, Structure Length: 7.56m (24.80ft), Average Daily Traffic: 4,500 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 7,107 (year 2028), Design Load: H 20, Features Intersected: I 95, Facility Carried by Structure: HWY CENTRAL ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.571, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 36.9m (121.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 16.5m (54.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 58.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.60m (24.93ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $1,075,000, Roadway Improvement Cost: $108,000, Total Project Cost: $1,613,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100222VLMHDNBI, Location: 2.1 MI N PARKER RIVER (Lat: 42.780303, Lng: -70.927033), Route carried "on" structure: Interstate 95, Year Built: 1976, Status: Open, Structure Length: 2.13m (6.99ft), Average Daily Traffic: 49,400 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 78,017 (year 2028), Design Load: HS 20+Mod, Features Intersected: HWY SCOTLAND RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 134.203, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 22.3m (73.2ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.8m (65.0ft), Curb-To-Curb Width: 19.7m (64.6ft), Out-to-Out Width: 21.1m (69.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 63.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.20m (7.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $227,000, Roadway Improvement Cost: $23,000, Total Project Cost: $341,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100222VMMHDNBI, Location: 2.1 MI N PARKER RIVER (Lat: 42.780328, Lng: -70.927303), Route carried "on" structure: Interstate 95, Year Built: 1952, Year Reconstructed: 1976, Status: Open, Structure Length: 2.13m (6.99ft), Average Daily Traffic: 49,400 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 78,017 (year 2028), Design Load: HS 20+Mod, Features Intersected: HWY SCOTLAND RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 134.203, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 22.3m (73.2ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 19.7m (64.6ft), Out-to-Out Width: 21.1m (69.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 63.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.20m (7.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $227,000, Roadway Improvement Cost: $23,000, Total Project Cost: $341,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: N100212Y2MHDNBI, Location: 000076 STATUTORY (Lat: 42.750000, Lng: -70.950000), Route carried "under" structure: Interstate 95, Year Built: 1953, Structure Length: 7.56m (24.80ft), Average Daily Traffic: 23,000 (year 0 ), Features Intersected: I 95 SB, Facility Carried by Structure: HWY CENTRAL ST Minimum Vertical Clearance: 0.45m (1.48ft), Kilometerpoint: 12.965, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft) Find on map >>
Structure Number: N100212Y2MHDNBI, Location: .3 MI N PARKER RIVER (Lat: 42.750000, Lng: -70.950000), Route carried "under" structure: Interstate 95, Year Built: 1953, Structure Length: 7.56m (24.80ft), Average Daily Traffic: 23,000 (year 0 ), Features Intersected: I 95 NB, Facility Carried by Structure: HWY CENTRAL ST Minimum Vertical Clearance: 0.45m (1.48ft), Kilometerpoint: 12.965, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft) Discuss this city on our hugely popular Massachusetts forum Back to: Newbury, MA, Massachusetts, All US cities.
|
![]() |